BROCADE Overview UKNOF PRESENTATION

Slides:



Advertisements
Similar presentations
Sales Returns with Quality Management & with Configured Materials SAP Best Practices for Fabricated Metals V1.603 (France) SAP Best Practices.
Advertisements

Business logic Datacenter Respond to hardware failures Add storage capacity Handle increase in traffic Diagnose service failures Apply OS.
A GRAPH MORE LOVELY THAN A TREE © 2010 Brocade Communications Systems, Inc. CONFIDENTIALFor Internal Use Only 1 Joerg Ammon Systems.
What Would Happen if Your Customers Never Purchased Another Network? Brocade Network Subscription – Partner Enablement.
Primo Workbook #2 Supplemental Screenshots. 2 Copyright Statement and Disclaimer All of the information and material, including text, images, logos and.
CERN TIER PARTNER PROGRAM Pierre Hardoin Brocade Account Manager Cambridge, 9 February © 2014 Brocade Communications Systems, Inc. CONFIDENTIAL—For.
RTC Agile Planning Component
1© Hitachi Data Systems Corporation All Rights Reserved.1 BROCADE FABRIC VISION TECHNOLOGY.
Corona Stacking – new features
1 Copyright © 2012 Mahindra & Mahindra Ltd. All rights reserved. 1 Hybrid Projects - Defect Management - Process and Roles.
BROCADE FASTIRON WS SALES PROMOTION BRC0029 © 2013 Brocade Communications Systems, Inc. CONFIDENTIAL— Company Proprietary Information. 1.
© 2015 BROCADE COMMUNICATIONS SYSTEMS, INC. COMPANY PROPRIETARY INFORMATION Mohammad Hanif June 2015 Optimal Flow Placement in SDN Networks.
Conditions and Terms of Use
Title Slide – Option 1. Title Slide – Option 2 Insert Text.
Products, Account Hierarchy and Master Agreement Postal Services.
Enhancement Package Innovations Gabe Rodriguez - Halliburton Stefan Kneis – SAP Marco Valencia - SAP.
1 Copyright © 2012 Mahindra & Mahindra Ltd. All rights reserved. 1 Defect Management - Process and Roles.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Receipts.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Put Away Loads.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage Supplier Returns.
Oracle Fusion Applications 11gR1 ( ) Functional Overview (L2) Manage Inbound Logistics (L3) Manage and Disposition Inventory Returns.
Introduction to Voyager 9 Primo OPAC
1 Introduction to Voyager 9 Media Scheduling. 2 Copyright Statement and Disclaimer All of the information and material, including text, images, logos.
1 of 26 For Oracle employees and authorized partners only. Do not distribute to third parties. © 2009 Oracle Corporation – Proprietary and Confidential.
© 2013 IBM Corporation IBM UrbanCode Deploy v6.0.1 Support Enablement Training Source Configuration and Database Upgrades Michael Malinowski
IBM Software Group ® Jazz Team Build – Part 1 Overview Jonathan.
IBM Innovate 2012 Title Presenter’s Name Presenter’s Title, Organization Presenter’s Address Session Track Number (if applicable)
Copyright © 2012, Oracle and/or its affiliates. All rights reserved. Oracle Proprietary and Confidential. 1.
Early Adopter of NFV? Mitigate Risk! UKNOF 34 - Manchester Anthony Magee, 21 st April 2016 Global Business Development.
Microsoft Dynamics AX Credit and Collections
Microsoft Virtual Academy
Connectivity to bank and sample account structure
Modern Application Lifecycle Management
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Chapter 18 Maintaining Information Systems
Redesign of AppArmor Modules in YaST
COMMUNITY ACCOUNTABILITY PLANNING SUBMISSIONS (CAPS) & MULTI-SECTOR SERVICE ACCOUNTABILITY AGREEMENTS (MSAA) CAPS And Schedule Refresh.
<Insert Picture Here>
Deploy Plugins Developer 29 October 2013
Dive deeper into what’s new and what’s coming in Outlook for Mac
Tech·Ed North America /14/2018 7:13 PM
Microsoft Dynamics Customer Driven Update (CDU)
Automation in an XML Authoring Environment
Datacenter & Cloud Consolidation and Migration Engagement Summary Workshop Version 2.1
Microsoft Services Provider License Agreement Program reference card
Building modern web applications with Visual Studio and Web Essentials
Title of Presentation 11/22/2018 3:34 PM
Disclaimer The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of SAP. Except for.
2018 Financial Services Analytics Summit
Branching and Merging Practices
Title of Presentation 12/2/2018 3:48 PM
TechEd /3/2018 8:11 AM © 2013 Microsoft Corporation. All rights reserved. Microsoft, Windows, and other product names are or may be registered trademarks.
M7: New Features for Office 365 Identity Management
Themes Name Title Company. Themes Name Title Company.
Building continuously available systems with Hyper-V
LESSON 01 Hands-on Training Execution
Motivation for 36OU Open Rack
<Insert Picture Here>
Smart Go Training Presentation 4/4/2019 3:22 PM
Title of Presentation 5/12/ :53 PM
Title of Presentation 5/24/2019 1:26 PM
Day 2, Session 2 Connecting System Center to the Public Cloud
Desktop App Assure Service Microsoft Representative Name June 7, 2019
Title of Presentation 7/24/2019 8:53 PM
Annata 365 Fleet management with Annata 365 June
Presentation transcript:

BROCADE Overview UKNOF PRESENTATION [Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 BROCADE Overview UKNOF PRESENTATION Julian Smith January 20 2011 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 Legal Disclaimer All or some of the products detailed in this presentation may still be under development and certain specifications, including but not limited to, release dates, prices, and product features, may change. The products may not function as intended and a production version of the products may never be released. Even if a production version is released, it may be materially different from the pre-release version discussed in this presentation. NOTHING IN THIS PRESENTATION SHALL BE DEEMED TO CREATE A WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING BUT NOT LIMITED TO, ANY IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NONINFRINGEMENT OF THIRD-PARTY RIGHTS WITH RESPECT TO ANY PRODUCTS AND SERVICES REFERENCED HEREIN. Brocade, the B-wing symbol, BigIron, DCX, Fabric OS, FastIron, IronView, NetIron, SAN Health, ServerIron, and TurboIron are registered trademarks, and Brocade Assurance, DCFM, Extraordinary Networks, and Brocade NET Health are trademarks of Brocade Communications Systems, Inc., in the United States and/or in other countries. Other brands, products, or service names mentioned are or may be trademarks or service marks of their respective owners. © 2010 Brocade Communications Systems, Inc. © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

LINX Update Multiple issues seen on LINX core MLX platforms. [Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Background Multiple issues seen on LINX core MLX platforms. 2 Devices running 5.0.0a code and 1 running 5.0.0c code. 5.0.0a is a privately available early adopter code release which covered bugs found by LINX in initial testing of 8x10G cards in April 2010. LINX very early adopter of 8x10G blades for MLX. Tested first delivery blades in April and these were shipped to the UK from the test lab in San Jose. © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Issues Encountered Early November 1st instance of issue with low utilisation on individual port member of LAG occurs. Remedial action turn port off. Upgrading the MLX’s from 4x10G to 8X10G cards a known bug was encountered. DEFECT000327663. Fixed in 5.0.0b. Switchover between management cards causes packet loss on 8x10G modules. Known bug. DEFECT000308382. Fixed in 5.1.0 code © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Issues Encountered Additional LAG ports showing the same low utilisation issue. Packets on trunk from loan kit switch appearing mangled for some members peering sessions. Hardware Failures on several 8x10G modules. Traffic managers showing unexpected drops. This has resulted in a number of RMA’s and movement of customer ports away from faulty blades. 1st RMA back with HQ for fault analysis. Reset of 2 line cards due to TM errors © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Rectification Measures Loan Kit put in place prior to December engineering moratorium. Engineering have been involved in all issues associated with LINX from 2nd week of December with visibility at the highest levels of the organisation. Short period of live network testing to try to track down underlying issue for low utilisation LAG ports. Unable to track down problem. Escalation to CEO level within Brocade. Call’s between JS and all senior management team associated with issues. © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Rectification Measures Three test rigs set up in QA labs to try to replicate outstanding LAG issue. Holidays cancelled over Christmas for a large number of Engineering staff to carry out testing. At this time none of the measures taken by Engineering have resulted in the issue being replicated. Additional bugs also found by Engineering as part of the replication testing. Daily update calls with customer by Critical Account Manager, Engineering and Account Team. © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 LINX Update Moving Forward Comprehensive plan put together for carrying out live analysis on misbehaving LAG port to try to get to the underlying issue. Scheduled Sunday night through Monday morning UK time. It is anticipated that 5.0.0e will incorporate all the fixes for bugs found so far. If work on Sunday allows Brocade to replicate outstanding LAG issue a fix for this will also be included in 5.0.0e. If not discussions to be held with LINX on moving forward with code QA and release without this fix to cure all other issues encountered during the last 3 months. Examining ‘Plan B’ options. © 2010 Brocade Communications Systems, Inc. 12/9/2018 © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only

[Add Presentation Title: Insert tab > Header & Footer > Notes and Handouts] 12/9/2018 Thank You © 2010 Brocade Communications Systems, Inc. Company Proprietary Information © 2010 Brocade Communications Systems, Inc. CONFIDENTIAL—For Internal Use Only