DECivil ICIST Urban Rehabilitation in Southern Europe The Seismic Problem and the Portuguese Case Rita Bento Instituto Superior Técnico, TECHNICAL UNIVERSITY.

Slides:



Advertisements
Similar presentations
Guidance Notes on Safe Health Facilities Sanjaya Bhatia Focal Point Disaster Resilient Schools & Hospitals.
Advertisements

Museum Presentation Intermuseum Conservation Association.
1 Bishkek November 17, Goulsara Pulatova RegionalCoordinator UNISDR Secretariat Office in Central Asia 2nd Regional Consultative.
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
FIAR International Insurance- Reinsurance Forum 2013 Nat Cat mitigation programs in Bulgaria Roumen Galabinov.
Seismology and Earthquake Engineering :Introduction Lecture 3
Introduction to Structural Design
Improving the Seismic Performance of Stone Masonry Buildings
NIS in Poland current situation and recommendations for the future I. Kijenska Faculty of Materials Science and Engineering, Warsaw University of Technology/PRESAFE.
Lecture 9 - Flexure June 20, 2003 CVEN 444.
1. 2 World seismic activity British Geological Survey 2.
MUSE 11B Buildings in Earthquakes Why do buildings do the things they do?
Charles SCAWTHORN Junji KIYONO Kyoto University Earthquake Risk Reduction 3- Mitigation and ERR Program Development 1. Concepts and Terminology 2. Hazard,
Undergraduate seismic design competition EERI Student Chapter – Rice University Topic #1: Basic Earthquake Engineering Concepts.
SEISMIC RISK REDUCTION Stela PETRESCU MDPWH PMU General Director Ministry of Development, Public Works and Housing ICAR FORUM, Bucharest, 1-2 October 2007.
University of Minho School of Engineering ISISE, Department of Civil Engineering Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia - 24.
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
ICIST INSTITUTO DE ENGENHARIA DE ESTRUTURAS, TERRITÓRIO E CONSTRUÇÃO Lisbon, 26 November 2007 GROUP 1 Earthquake Engineering and Seismology Coordinator:
SURFACE FAULT RUPTURE, GROUND SHAKING, GROUND FAILURE (LIQUEFACTION, LANDSLIDES), AFTERSHOCKS.
ARCHITECTURAL DESIGN STUDIO I ARCH 201
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
LESSONS FROM PAST NOTABLE EARTHQUAKES. Part III Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
LESSONS LEARNED FROM PAST NOTABLE DISASTERS MEXICO PART 3B: EARTHQUAKE VULNERABILITY OF BUILDINGS Walter Hays, Global Alliance for Disaster Reduction,
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
REGIONAL POLICY EUROPEAN COMMISSION The EU Recovery Plan and the proposal amending the European Regional Development Fund Regulation.
Federal Emergency Management Agency Unit U nit 3- Mitigation Measures by Type of Disaster.
Reinforced Concrete Design
Frames and Walls Lateral Stability
TOPICS COVERED Building Configuration Response of Concrete Buildings
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Reformed Partnership and Multi-Level Governance Ana Maria Dobre Political Administrator General Council Secretariat
DEPARTMENT OF ENVIRONMENT & SUSTAINABLE DEVELOPMENT Konstadinos Konstadakopoulos Head of Department Lefteris Alexopoulos Environmental Consultant 2 nd.
Assessment of Regional Coordination Capacities Szepesi Balázs Lead Evaluator Workshop on introducing territorial development evaluations April 25, 2013.
LESSONS FROM PAST NOTABLE EARTHQUAKES PART VIII Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
│ 1│ 1 What are we talking about?… Culture: Visual Arts, Performing Arts, Heritage Literature Cultural Industries: Film and Video, Television and radio,
LESSONS FROM PAST NOTABLE EARTHQUAKES. Part IV Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
M6.3 EARTHQUAKE STRIKES KAKI, IRAN TUESDAY, APRIL 9, DEAD 850 INJURED Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Topic 19: Bracing theory, terms and elements.
Earthquake Resistant Building designs. Buildings are designed to withstand vertical forces. Buildings are designed to withstand vertical forces. If earthquakes.
Framed Structures Luisana Hernández.
1 7.3 Earthquakes and Society. 2 Have you experienced an earthquake? How did you feel? What did you do to protect yourself?
MAGNITUDE 6.7 EARTHQUAKE STRIKES CENTRAL JAPAN Saturday, November 22, 2014 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.
The Strategy – PRERED, Forum outcomes Pablo Torrealba.
Building Construction
2005 PS3 Summer Institute Buildings in Earthquakes Why do buildings do the things they do?
INTRODUCTION Due to Industrial revolution metro cities are getting very thickly populated and availability of land goes on decreasing. Due to which multistory.
Özgür BOZDAĞ Mutlu SEÇER Dokuz Eylül University Katip Çelebi University Izmir, Turkey SEISMIC RETROFITTING OF AN EXISTING INDUSTRIAL STRUCTURE FOR CONVERTING.
Review of Indian Seismic Codes
Albania Disaster Risk Mitigation and Adaptation Project
Seismic Waves Large strain energy released during an earthquake
Bolonha, 3-6 March 2014 Module: Seismicity and seismic risk
The Islamic University of Gaza- Higher Studies Deanery
More lectures at Disasters Supercourse - 
10 DEAD; DOZENS INJURED IN TOWN OF 85,000
Bolonha, 3-6 March 2014 Module: Seismicity and seismic risk
Wood Structures Topic 8 Quality Workmanship
A Brief Idea on Seismic Retrofitting Techniques
Effect of Earthquake on Fire Protection Systems
Arch205 building construction Introduction
Masonry Bearing Walls.
The EU Strategy for Adaptation to climate change
Global Platform on Disaster Risk Reduction May 17th 2019
Environment in Cohesion Policy framework for
Presentation transcript:

DECivil ICIST Urban Rehabilitation in Southern Europe The Seismic Problem and the Portuguese Case Rita Bento Instituto Superior Técnico, TECHNICAL UNIVERSITY OF LISBON December 2005 INTERNATIONAL WORKSHOP CITY OF TOMORROW AND CULTURAL HERITAGE POMERIA OUTLOOK DECEMBER 2005

DECivil ICIST INSTITUTO SUPERIOR TÉCNICO

DECivil ICIST Urban Rehabilitation in Southern Europe New central, eastern and southern EU states face the need to rehabilitate building stock; Common causes: lack of maintenance in the past; Different causes due to physical environment: Central and Northern Europe – the heating systems; Southern Europe – earthquake resisting rehabilitation

DECivil ICIST TOPICS Overall view of the importance of earthquake rehabilitation building stock in southern EU states: Detailed discussion of Lisbon downtown and 1755 earthquake; Proposals of the Portuguese and European scientific communities; Emphasis on common actions at European level: common strategy for central, northern and southern countries to negotiate EU financial support for rehabilitation of the building stock.

DECivil ICIST 1. Introduction Earthquakes still remain a severe threat in Southern Europe; It is impossible to predict dates of occurrence of earthquakes. Nevertheless the inadequate seismic resistance of the building stock, lifelines and industry is well understood and can be avoided Build and Strengthen structures Most critical issue: the problem of older vulnerable structures, built before current regulations and still perform vital functions; Different initiatives developed at European level. In Portugal, SPES has proposed new initiatives for the reduction of the seismic risk: Workshop Reducing Earthquake Risk in Europe – organized by EAEE and SPES, in October 2005

DECivil ICIST 1. Earthquakes in Europe - occurrence The SESAME Map of Seismic Hazard in the European Area – uneven distribution of earthquake distribution in Europe

DECivil ICIST The main different types of earthquake effects at the earths surface are: Fault rupture; Landslides and liquefaction; Tsunami; Fires; Ground motion /ground shaking. Ground motion is the cause of the vast majority of human and economic losses due to earthquake. 2. Earthquakes in Europe - effects

DECivil ICIST Several actions have to be performed against the effect of ground motion: 1.Evaluate the seismic resistance of existing buildings and strengthen the weakest ones; 2.Ensure the quality of construction; 3.Evaluate de seismic resistance and strengthen where necessary the industrial facilities and lifelines (power, gas, water,…); 4.Protect built heritage, by strengthen monuments and buildings of high cultural heritage. 2. Earthquakes in Europe - effects

DECivil ICIST Several decisions and policies can be suggested [Spence et al., 2005]: 1.Pursuing and strengthening the policies already enforced: Support of research on seismology and earthquake engineering; Development of Structural codes (EC8); Establish a centre for coordination of emergency aid; 2.Defining recommendations for Member States minimum standards of Earthquake safety; 3.Creating a structure to coordinate tasks better performed at European level. 3. What can be a European Risk Reduction Programme?

DECivil ICIST Two different components can be referred in urban rehabilitation of buildings: 1.Associated with conservation and improvement of living conditions; 2.Related with improving of safety conditions Evaluation and strengthening of existing buildings and monuments The criterion should be to strength buildings where the cost of strengthening is less than the expected losses and buildings that do not possess minimum safety levels.

DECivil ICIST To support this action the main available resource is the European Regional Development Fund (ERDF). It was recently proposed [Spence et al., 2005]: i.The regulation of ERDF be changed to allow supporting interventions on the housing stock, with specific objectives to provided minimum levels of safety; ii.That upper limits for the EU financial support should be established. The EU has already recognized the importance of strengthening monuments and buildings of high cultural value Evaluation and strengthening of existing buildings and monuments

DECivil ICIST To the reduction of the seismic risk is fundamental to ensuring the quality of construction to: New buildings and another infrastructures; To the design and execution of the rehabilitation of existing structures. The proposed is: EU would incentive the process by demanding guarantees from the Member-States: The responsible by the construction process should present external revision documents, assuming the responsibility for the quality of the final product and, if possible, insurance covering seismic risk Ensuring the quality of construction

DECivil ICIST Portugal is a seismic prone territory. 1755s Lisbon Earthquake was very strong (M=8.7): Destroyed large areas in Lisbon and Algarve. In Lisbon it was followed by a tsunami and a fire, out of control for several days Lisbon was rebuilt following an urban plan. The fear of another earthquake led of the enforcement of new construction rules Pombalino Buildings 4. The Portuguese Case: 1755 Earthquake and the Pombalino buildings

DECivil ICIST Old Masonry buildings in Lisbon LEGENDA: A - EDIFÍCIOS DE ALVENARIA (<1755) B - EDIFÍCIOS POMBALINOS E SEMELHANTES (1755 a 1880) C - EDIFÍCIOS ALTOS DE ALVENARIA COM PAVIMENTOS DE MADEIRA OU DE BETÃO E PAREDES RESISTENTES DE ALVENARIA (1880 a 1940) D – EDIFÍCIOS DE ALVENARIA, COM PAVIMENTOS EM BETÃO OU COM ESTRUTURA PORTICADA DE BETÃO (1940 a 1960) E – EDIFÍCIOS RECENTES DE BETÃO ARMADO (>1960) [in Mendes-Victor et al, 1993] Downtown

DECivil ICIST After 1755 Lisbon Earthquake, masonry buildings were built with a 3D wood structure named gaiola pombalina. The gaiola structure is like a cage made of vertical and horizontal elements braced with diagonals Pombalinos Buildings ( ) Gaiola Pombalina [Mascarenhas, 1997]

DECivil ICIST Pombalino Building Gaiola 3-D wood structure St Andrews Crosses Different geometries Maximum number of floors: 3 + ground-floor Foundations – short and small diameter woodpiles connected by a timber grid System of vaults made of blocks of ceramic masonry and stone arches Floors – timber slabs [Mascarenhas, 1997]

DECivil ICIST Gaiola Pombalina: Scheme of an interior wall with St Andrews crosses The walls are filled with masonry, so the wood elements can not be seen. Partition walls 3D wood structure Floors

DECivil ICIST Gaioleiros Buildings (1800–1940) [Mascarenhas, 1997] As time went by, the wood elements were progressively removed in new constructions The diagonal elements gradually disappear Interior walls were replaced with masonry or wood-partitions In time, masonry becomes the only structural material. Partition walls

DECivil ICIST Placa Buildings ( ) Thin concrete slabs [Mascarenhas, 1997] Masonry walls At the most recent masonry buildings, wood floors were replaced with thin concrete slabs. Selft weight was increased. As the result of construction evolution, old masonry buildings became less resistant to horizontal loads

DECivil ICIST Pombalino Building analysed Rua da Prata, 210 a 212 Roof/Penthouse Main Entrance

DECivil ICIST Pombalino Building analyzed in [Santos, 2000] Main Façade Plan of a typical floor

DECivil ICIST Numerical Model (SAP2000 ® ) Vaults (crosses) Floors bars Floors Shell Elements (2D) of masonry walls Beam elements MasonryInterior wall of gaiola

DECivil ICIST Numerical Model (SAP2000 ® ) - Quarter

DECivil ICIST Building Analysis sis = 0.20 sis = 0.25 sis = 0.30 Evolution of Damage Levels in masonry elements from main façade in 1 st step of iterative procedure – evolution of tension damaged masonry Deformed main façade

DECivil ICIST COLAPSE Mechanism: Bending of the front façade out of its plane 1998 Azores Earthquake Collapse Mechanism obtained

DECivil ICIST 1998 Azores Earthquake Collapse Mechanism according to original conception Fall out the plane of exterior walls without complete collapse – it depends on de number of floors [Mascarenhas, 1997]

DECivil ICIST Strengthening Solutions Solution 1 Strengthening of the connections gaiola- façades The overturning of the façades can only occur after the rupture of its connections to the exterior masonry walls. Steel connectors

DECivil ICIST Solution 2 Inclusion of a R.C. beam ( m 2 ) on the top Beam around the exterior perimeter Solution 3 Inclusion of R.C. beams ( m 2 ) in all the floors Beams at the pavements level

DECivil ICIST Actual Conservation State of Pombalino Buildings Buildings that mantain their original conception Main problems result from deficient/no maintenance: roof broken ceramic tiles that allow water inflitration causing masonry and timber degradation, etc. Buildings that suffered structural changes In most of the cases are critical as they reduce the seismic resistance and therefore are not advisable

DECivil ICIST Influence of the structural modifications Vertical continuity is not interrupted People may go around The open larger shop windows Vertical continuity is interrupted Increase the building vulnerability to shear base collapse Demolition of interior walls and introduction different structural elements Redistribution of the internal forces

DECivil ICIST Introduction of more stories at the top of the building Mass and F inertia increase at the top

DECivil ICIST Changes in Gaiola structure: removing timber elements or cutting elements for pipe solution Timber section was cut/reduced Bad solution Better solution Stiffness and bracing capacity of this timber structure

DECivil ICIST The Portuguese Association for Earthquake Engineering (SPES) has been working actively for the reduction of the Seismic Risk in Portugal. In 2001, it was presented a programme with 7 tasks: 1.Surveying and seismic evaluation of the building stock; 2.Definition of more efficient strategies of intervention; 3.Improvement of seismic strengthening solutions; 4.Formation of a legal framework for rehabilitation actions; 5.Civil and technical education and spread of information; 6.Creation of master-plans for seismic rehabilitation; 7.Interventions. 5. Portuguese Programme for the Reduction of the Seismic Vulnerability

DECivil ICIST Albeit the importance of the programme, it is not yet effectively supported by any member of the government, group of municipalities or politicians or by any private sector entity; For all these groups it is important: to decide in view of very short-terms horizons; To have some immediate return of their investment. The last initiative of SPES was the definition of the European Risk Reduction Programme; This cooperation seems to be the right way to the seismic risk reduction at all levels: local, national and European. 5. Portuguese Programme for the Reduction of the Seismic Vulnerability

DECivil ICIST Old masonry buildings are an important part of the building stock of most European cities and have to be preserve; The rehabilitation and strengthen should be promoted and coordinated at a European level; Because of the large number of structures evolved it is necessary to define priorities: start in regions of high seismic intensity and be directed at vital and weaker buildings; The European Regional Development Fund (ERDF) could support this action, although urban rehabilitation programmes supported by ERDF aimed essentially the regeneration of socially degraded areas. 6. Final Comments

DECivil ICIST It is herein suggested to negotiate a global programme in the EU to support the following components of the interventions on the rehabilitation of building stock: The heating conditions in the central and northern European countries; The earthquake rehabilitation of the weakest and strategic buildings from southern European countries. 6. Final Comments

DECivil ICIST Urban Rehabilitation in Southern Europe The Seismic Problem and the Portuguese Case Rita Bento Instituto Superior Técnico, TECHNICAL UNIVERSITY OF LISBON December 2005 INTERNATIONAL WORKSHOP CITY OF TOMORROW AND CULTURAL HERITAGE POMERIA OUTLOOK DECEMBER 2005

DECivil ICIST More Information: SPES – Sociedade Portuguesa de Engenharia Sísmica EERI – Earthquake Engineering Research Institute World Housing Encyclopedia www. world-housing.net (Pombalino Buildings)