Draft WLTP Phase 2 – carryover from 1b – Annex 4 Starting note on split runs in coast down testing WLTP-14-18e Within phase 1b, practically all tolerances.

Slides:



Advertisements
Similar presentations
OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
Advertisements

Working Paper No. WLTP-09-07e 1 Agenda item 5: Progress report on Downscaling / Gearshifting (OIL #4-9) by H. Steven th WLTP IG meeting, 14.
WLTP drive trace normalization
WLTP Number of Tests Different Options And Their Consequences IWG in Stockholm, Christoph Lueginger, BMW WLTP-10-26e.
WLTP rev1e BMW, Christoph Lueginger WLTP Road Load Family
Status Report of the WLTP coasting Task Force Author: Thomas Vogel (chairman) WLTP IG, 9 th meeting, Geneva, Jan 2015 WLTP-09-15e.
WLTP normalization rotational Mass
WLTP-11-12e Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce wind tunnel method road load.
FLATBELT/DYNO + WINDTUNNEL METHOD RLD WITH FLATBELT/DYNO AND WIND TUNNEL, OIT #10 AND #18 WLTP-08-22e.
Default Road Load issue Initial Dutch proposal for a Update Progress report Annex 4 Open Issues: WLTP-07-07e 5. Default road load parameters (OIL.
WLTP-08-19e BMW, Christoph Lueginger WLTP Road Load Family
WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP DRAFTING TF, "RECORDED" BMW, Christoph Lueginger DISTINGUISH BETWEEN MEASURED AND RECORDED.
WLTP-10-11e 1 By H. Steven Status report about the work of the gearshift issues task force.
WLTP, RESULT CALCULATION, V4 MEASURED RESULT IS CORRECTED BY RCB, KI, 14° TEST AND INTERPOLATION. BMW, Christoph Lueginger WLTP-12-08e.
Progress report of Sub Group EV (WLTP-12-19e) draft 1. Proposals for adoption 2. Discussion points.
WLTP-12-17e Status report about the work of the gearshift issues task force.
WLTP, result calculation, v6
WIND TUNNEL METHOD Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce CHASSIS DYNO PRESCRIPTION.
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Parameter Setting for Validation 2 DTP Subgroup Lab Process Internal Combustion Engines.
State of play WLTP Sub Group EV. Sub Group EV meeting 28 of September Last meeting of WLTP IWG 29 of September to 1 of October Final meeting for phase.
Analysis of Normalization Report With Focus On Rotational Masses Geneva, 14 th of January 2015 Christoph Lueginger BMW WLTP-09-25e.
ACEA comments on EU WLTP issues EU WLTP, 30 TH OF NOVEMBER November 2015.
WLTP ANNEX 4 AND 7, DELTA CD*A BMW, Christoph Lueginger, Thomas Schütz ALTERNATIVE DETERMINATION METHODS WLTP-10-21e.
Nicolas HAREL Sam TRIPATHY 23/10/2014 CONFIDENTIEL PROPRIÉTÉ RENAULT WLTP PEV Range test procedure : End of test criteria.
WLTP-12-17e Status report about the work of the gearshift issues task force.
WLTP ANNEX 4, ROAD LOAD CALCULATION Proposal for calculating the road load of individual vehicles C. Lueginger, BMW; A. Feucht, Audi WLTP-DTP-LabProcICE-202.
WLTP OIL #6, section 2 Use of the gearbox, auxiliary gearboxes, exception of crawler gears.
WLTP IWG ISC Taskforce: Starting note
Status report about the work of the task force on gearshift issues
RLD test program : alternative method O.I.L#18
ASEP IWG Report to GRB 65th
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
Improvement of Wind tunnel Measurement Process Status report
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
RDE Regulation Commission Meeting
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
Drive Trace Indices in WLTP
Drafting Subgroup Meeting Part of IWG #16, The Hague, October 2016
Improvement of Family definitions
NEW ISSUES TASK FORCE PROGRESS REPORT 20th IWG meeting WLTP-20-15e
Proposal for a mid vehicle concept
Industry Homework from AEB 02
WLTP-DTP-LabProcICE-229
Full load curve proposal
Proposals from the Informal Working Group on AEBS
Handling of wind tunnel + chassis dyno method for RLD
Comments on WLTP documentation
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
CO2 Effect on WLTc Phase weighting.
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Comments on Evo-Factor proposal
Correlation Improvements
WLTP-25-07e Gearshift Issues Heinz Steven
Drafting Coordinator Report
Vehicle warm up and stabilisation – RLD and dyno
Pilot project: Analysis of the relevance of influencing factors when determining CO2 emissions and fuel consumption during type approval of passenger cars.
WLTP Correlation measurement
Working Paper No. WLTP-05-12
Proposal to replace 3 s rule by 2 s rule
WLTP Comparison of WLTP unified database distributions and WLTC rev2 distributions Heinz Steven
WLTP Validation3 test result ~ Road load determination ~
Status report 4WD dynamometer taskforce
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 6/10/2019.
Progress report of Sub Group EV (WLTP-12-19e) 1
Maximum allowable Override Force
WLTP-26-03e - Revision 1 Final amendments for annex 2 and status report about the programming code development subgroup Heinz Steven
Title : Alternative warm-up procedure WLTP rev1e by Japan
OIL# 52: End of PEV range criteria
Additional discussion points from the gearshift issues task force
Presentation transcript:

draft WLTP Phase 2 – carryover from 1b – Annex 4 Starting note on split runs in coast down testing WLTP-14-18e Within phase 1b, practically all tolerances within road load and specifically coast down testing have been tightened. This was proposed by industry and mainly triggered by the results of the road load validation. They had made obvious, that coast down testing is the most inaccurate way determining road load – but that we cannot avoid that method for several reasons. One of these set of measures was the issue of "split runs". Split runs are necessary, if the distance of the coast down track is too short, to coast down from ~145 to ~15 km/h within one straight track (up to 6km can occur). Parameters, that "produce" that problem: - road load of the vehicle in relation to mass - length of track Parameters, that interfere potentially negatively: - warm-up between the split runs - track between the straight parts (e.g. turning radius) Measures, that help to improve the result: - statistical requirement between runs – already in place. - new requirements  to be developed. An earlier proposal was to limit the number of splits to 2 (3 segments). This would prevent some OEMs / test tracks from coast down testing, therefore the issue was skipped. Alternative solutions have to be developed within this new Annex 4 TF within phase 2. It may include also new issues in that context (improving methods / tightening tolerances, where possible). WLTP Phase 2 | Lueginger, BMW | 15.04.2016

draft WLTP Phase 2 – carryover from 1b – Annex 4 Information on acceleration for dyno setting Initially a fixed acceleration of approx. 6m²/s³ was drafted. For vehicles, not achieving that, a solution (full throttle) was included. For normal passenger vehicles, that will easily outreach the 6m²/s³, this acceleration requirement is mainly test burden: One coast down run (acceleration + coast down) lasts approx. 10km. Typically 3-4 runs are needed  40km! Especially in COP-testing, kilometres should be limited. As IWG road load experts concluded, that higher accelerations are to the worst case direction. It was agreed, to set the 6m²/s³ as a minimum and allow for higher accelerations. That was presented and adopted in Geneva 01/2016. This issue is presented to ask IWG, if during the review since the Geneva-meeting in 01/2016, questions have emerged. Recommendation: Conformation of current text. WLTP Phase 2 | Lueginger, BMW | 15.04.2016