NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Reminder: Scheme for re-using molybdenum tiles from.

Slides:



Advertisements
Similar presentations
VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
Advertisements

ASIPP EAST Tungsten-copper Divertor Development For EAST Present by D. -M. Yao EAST-Divertor Group, ASIPP-Hefei, China 25 th Symposium on Fusion Engineering.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Effects of active mode control on edge profiles and plasma-surface interactions in T2R H. Bergsåker with contributions from S. Menmuir, M. Henriksson et.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
PFC meeting 9-11 May 2005 PPPL CDX-U E-beam experiments on CDX-U Presented by Dick Majeski R. Kaita, T. Gray, H. Kugel, J. Spaleta, J. Timberlake, L. Zakharov.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
ASIPP Development of a new liquid lithium limiter with a re-filling system in HT-7 G. Z. Zuo, J. S. Hu, Z.S, J. G. Li,HT-7 team July 19-20, 2011 Institute.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
NSTX CSU Preliminary Assessment of PFCs Art Brooks December 8,
NSTX Center Stack Upgrade Workshop Requirements & Design Point C Neumeyer Jan 22, 2009.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
1 US PFC Meeting, UCLA, August 3-6, 2010 PFC Activities in Alcator C-Mod G.M. Wright, H. Barnard, B. Lipschultz, D.G. Whyte, S. Wukitch Plasma Science.
H. W. Kugel 45 th APS DPP Meeting Oct 27-31, 2003, Albuquerque, NM 1 Lithium Experiments in the NSTX Boundary Physics Program H.W.Kugel, M.Bell, R.Kaita,
EAST Data processing of divertor probes on EAST Jun Wang, Jiafeng Chang, Guosheng Xu, Wei Zhang, Tingfeng Ming, Siye Ding Institute of Plasma Physics,
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
NSTX-U cryo/particle control discussion #8 December 19, 2012 What have we done, or plan to do to be responsive to PAC questions, and in prep for 5 year.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Introduction of 9th ITPA Meeting, Divertor & SOL and PEDESTAL Jiansheng Hu
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Beam line Experiment area SC magnet Pion production target
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
1Field-Aligned SOL Losses of HHFW Power and RF Rectification in the Divertor of NSTX, R. Perkins, 11/05/2015 R. J. Perkins 1, J. C. Hosea 1, M. A. Jaworski.
1NSTX-U PAC-37 Q&A – Day 2 NSTX-U Team Questions and Answers from PAC-37 Day 2 NSTX-U PAC-37 PPPL January 27, 2016.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
Development and Assessment of “X-point limiter” Plasmas M. Bell, R. Maingi, K-C. Lee Coping with both steady-state and transient (ELM) heat loads is a.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
Masa Ono Questions to be discussed will be how much we should glow (if any of what type for how long) and/or the degree of lithium deposition prior to.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
NSTX-U NSTX-U PAC-31 – NSTX-U Program Overview, J. Menard (04/17/2012) NSTX-U 5 year plan goal: implement cryo-pumping and begin transition to metallic.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
NSTX APS-DPP: SD/SMKNov Abstract The transport properties of NSTX plasmas obtained during the 2008 experimental campaign have been studied and.
For the NSTX Five-Year Research Program 2009 – 2013 M.G. Bell Facility and Diagnostic Plans.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Surface Analysis of Graphite Limiter and W-coating Testing on HT-7
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
ITER consequences of JET 13C migration experiments Jim Strachan, PPPL Jan. 7, 2008 Modeled JET 13C migration for last 2 years- EPS 07 and NF paper in prep.
Bunker Wall Design Wall ESS
Presentation transcript:

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Reminder: Scheme for re-using molybdenum tiles from NSTX 1 NEED 1.4 WIDE ATJ SPACER TILES Engineering design effort for installing these in NSTX-U has not been done! This talk is somewhat speculative Parts to make (48 of each, I believe): New stainless steel support blocks New graphite pieces reaching into the gap New 1.4 wide graphite spacer tiles. 3 more slides Technical comments Schedule comments Programmatic comments NSTX-U has a narrow horizontal target, but only one row of tiles. Those tiles are ~1.5 larger in the radial direction.

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Suitability of tiles for NSTX-U? Based on FDR presentation, conversations with Rick Woods: –Heat loads: 1 thick molybdenum apparently used because the stock could be found. Limit was a low-cycle fatigue limit for stresses above 300 MPa Keep below 2 MW/m 2, and beneath ~1200 C anywhere in the tile, all is (apparently) fine. Designs with more complicated fasteners, 10 mm thick plate, had even better thermal properties. –Disruption loads: Disruption loads were not a big problem for the design. Possible that they could even take the full 2 MA, 1T loads, and almost certain that they could take the 1 st year parameters. –Ned to revisit both analysis points, but neither appears to be a complete shot-stopper. 2 Must have a way of depositing low-Z coatings on molybdenum surfaces. –Development is underway for upward LITERs. Can we assume they will be ready for routine use starting with the first plasma? –Boronization system has been removed from NSTX B. Blanchard has expressed concern that it may need to be reconstituted with additional safety features compared previous. Has been tasked with coming up with a design, schedule, cost estimates. SPG Suggestion: must commit to a boronization system if going to use these tiles in the upper divertor.

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 There Remains Time to Implement This Schedule for CSC –Casing shows up at PPPL in December 2012 –Probably start welding studs on in February 2013 –Install most tiles on CSC in late summer, early fall, Horizontal target tiles are a special case…cant be bolted down when the CS is lowered in. –Complete CS delivered to NTC in January –Case 1: Install horizontal diagnostic tiles on CSC in CTC. Allows diagnostic feedthroughs to be connected in comfort, sensors checked easily. Tiles would be set aside on the CS flange during installation Tile installation time: ~September, October 2013 –Case 2: Install horizontal diagnostic tiles on CSC in NTC after installation in NSTX. Organ-pipe diagnostic feedthroughs must be installed in the NTC. Life is difficult. Tile installation time: ~February 2014 –Engineering has not decided on case 1 or 2 yet. Schedule for molybdenum tile work (very approximate, and maybe optimistic given other potential personnel resource conflicts) –Design/analysis/drafting: 2.5 months –Fabrication of parts: 2 months –Disassembly/cleaning/assembly (provided the labor can be found): 2 months –Total: 6.5 months Implications: –It will probably not be acceptable to delay CD-4 any meaningful amount for this project. –Probably need to make a decision in the late winter/early spring. –Should get a WAF started in the new year if we are seriously considering this. 3

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Programmatic Comments What would we learn: –How to, or if we can, coat bare molybdenum surfaces to avoid impurity problems. LLD gives confidence that it is OK. –How much molybdenum the core plasma can tolerate. –How brave we need to be to implement a next step. Primary reason to delay: –Dont have impurity flushing schemes proven compatible with long-pulse, stationary operation. –Good chance we wont have one until the cryo-pump is ready. If ELM free with molybdenum influx, the shot will likely be very short. Diagnostics: –Required very early in the operations campaign. IR cameras on the upper divertors. TC in the tiles. Core spectroscopy that can detect molybdenum concentrations. Main chamber bolometry. –Would a lack of these measurements early in the run impact our willingness to install tiles? –Desirable: Upper divertor spectroscopy. staged Mo conversion vs. wholesale conversion of upper and lower divertor –Would be foolish to do a wholesale conversion w/o an initial test. –These tiles could provide such a test. Recommendation: –These tiles may provide a low-cost means of testing the water, but their utility decreases as we move towards higher power and longer pulse operation. –Should be considered as part of a plan that provides for rapid follow-up with additional tiles. Dont do it earlier than necessary. 4

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Other comments: Need a plan soon…all the other chapters are waiting on this sequence. High-Z coatings on tiles –High-Z coatings are a likely candidate for converting CS and PP tiles to high-Z. –Should consider coating select CS tiles, and select SPP tiles, to understand how well the coatings survive. Do this in tandem w/ the molybdenum upper divertor High-Z tiles and cryopump: –An additional expense associated with the cryo-pump will be reconstituting the bake- out system with new graphite tiles. –High-Z tiles likely do not need the full 350 bake, could use standard vessel bakeout temperatures (confirm this please…). Should check cost implications of more expensive tile manufacturing vs. bake-out system reinstallation. –If sufficient confidence exists in use of high-Z tiles, then they could be installed as part of an Advanced Divertor w/ a cryo-pump. NSTX-U was funded with graphite PFCs, Alcator C-Mod is at grave risk, despite molybdenum PFCs and plans for a hot W divertor. –We should plan the metal PFC program that we think is technically best. 5

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Following Are Henry Kugels Slides at the Facilities Brainstorming Session (for your reference) 6

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, Replacing the Planned Upper Inner Divertor ATJ Tiles with Molybdenum Tiles Expands NSTX-U Capabilities Installation of Molybdenum Tiles on the Upper Inner Divertor allows experiments to characterize : Reduction of divertor carbon source term in USN discharges - measure effect on plasma core-carbon impurity accumulation Comparison of power-handling during long-pulse DND discharge - measure upper and lower divertor heating and erosion Prototype test for expanding molybdenum tile coverage - if performance enhanced, start engineering work for more Mo tile coverage NSTX-U CS RADIUS IS LARGER NEED 1.4 WIDE ATJ SPACER TILES 3 AVAILABLE Mo DIAGNOSTIC TILES - MAGNETIC SENSOR - THERMOCOUPLE - LANGMUIR PROBE Remaining Tasks 1. Perform fresh engineering analysis to determine NSTX-U, operating limits (Ip, Bt, NBI, rep). 2. Design and fabricate ATJ spacer tiles. 3. Resolve of diagnostic cabling issues. NSTX Mo TILE

NSTX Upper Divertor Molybdenum Tiles Upper Divertor Molybdenum Tiles (Gerhardt) NSTX-U, Feb. 7-8, 2012 Replacing Entire Upper Divertor ATJ Tiles with Molybdenum Tiles Accelerates NSTX-U Decision for All Metal PFCs 8 J.Menard Number of NSTX ATJ tiles - Horiz Inr Div = 48 - Otr Div = 916 The outer divertor has 916, ATJ tiles, 1-inch thick arrayed in 5 tile styles (on 5 conic sections), fastened with Tee-bars to tapped holes in the copper baseplates containing heating/cooling pipes could use inner divertor tile design for outer divertor, but 5 different tile styles required a possible tile design consisting of a standardized geometry (e.g., cubes/CMOD) could reduce the number of tile styles and fabrication cost Mo INR DIV TILE