WSC Market Report Task Force Meeting

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
TIME LINE SCHEDULLE. TIME SCHEDULLE 2012 JanFebMarAprMayJunJulAugustSeptOct Prep. Meeting 1 ExCom Meeting Obtain Information TOR Drafting 1st Annouchment.
May, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan Report on APEC Low-Carbon Model Town Task Force.
Earthquake Response Cooperation Initiative Phase 1 Progress Report By Chinese Taipei May 19, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
Market Research on Global MABS Industry Trends Survey and Prospects Report Published: Jan 2016 Single User License: US $2800 Corporate User License:
Global and Chinese LED Solder Mask Industry, 2016 Market Research Report
How to comment VICH guidelines Shixin XU, PhD, Prof. China IVDC.
REPORT TO EWG MEMBER (CORRESPONDENCE) Plan of Actions for (May) (June) (July) (August) (September)
Global Wireless Receivers Market Research Report 2016 Published on – 20 May, 2016 | Number of pages :158 Single User Price: $2850 MarketIntelReports newly.
Future Plan of PREE - 1/15 EGEE&C 43, Honolulu, Hawaii, USA 10 April 2014 Future Plan of Future Plan of Peer Review on Energy Efficiency (PREE) Kazutomo.
Task Force 8: Heavy Duty Vehicles
Informal document GRE-77-21
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
Informal document GRE Rev.1
Summary of Previous IPTF Meeting Millennium HongQiao Hotel Shanghai
ESH Task Force Presentation to Joint Steering Committee Shoumian Chen ICRD Shanghai / China Feb 21-23, 2011.
ESH Task Force Presentation to Joint Steering Committee Shoumian Chen ICRD Shanghai / China Feb 21-23, 2011.
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
Proposal for new modules for inclusion in Regulation 691/2011
Timeline Tool Kit December 25, 1946
Task Force 3: Electrolyte leakage
Progress Report on proposed GUID on Information System Security Audit
Informal document GRE-79-04
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Shanya Salamaca September 15, 2010
Millennium HongQiao Hotel Shanghai
2011 WSC Meeting (May 24~27) Location:
Future Plan of Low-Carbon Model Town (LCMT) Project
Outreach Activities by Region Outcome -
Next steps toward Achieving Renewable Energy Goal
Eurostat regional yearbook 2012 – new routines and time planning
Informal document GRE-76-18
Octorara Area School District
Informal document GRPE-78-23
MCO Status Report to JSTC
& Draft presentation to JSTC
LAMAS Working Group June 2017
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
ENERGY Working Group Shanghai 2011
JSTC Presentation Semiconductor Social Contribution through Outreach
Presentation by SAI Pakistan
Update on Chemical WG Proposal
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
Semiconductor Social Contribution through Outreach
MCO Status Report to JSTC
2012 WSC / JSTC Meetings SIA in USA
PFC WG WSC - ESH TF Shanghai, China February, 2010 WG Members
Key Data on education: process for statistical indicators
Steering Committee, Eurostat, Luxembourg, 4 February 2011
WSC 2.0 Task Force - WSC Improvement -
ESS Resource Directors Group Luxembourg
Report to the JSTC Regarding Regional Stimulus
Takayuki Ohgoshi SIA in Japan Shanghai China 21- Feb. 2011
Summary: 38th JSTC Meeting Sep 15 & 17, 2010 Kobe, Japan
Progress Report on proposed GUID on Information TECHNOLOGY Audit
WSC WSC Improvement - Feb. 23, 2011 Shanghai, China WSC2.0 TF 1
Update on Chemical WG Proposal
Green Infrastructure: Working method
Informal document GRPE-79-20
Progress Report GUID on Information System Security Audit
Key Dates – Group Work Items Date
project on Flood Management in Urban Areas of TC Region
Paolo Valente UNECE Statistical Division
Informal document GRE-79-xx
Eurostat Flagship publication on cities
TF5: Cell/module/system test
Transmitted by the experts of IWG ASEP
Presentation transcript:

WSC Market Report Task Force Meeting Shanghai, February 2011

Contents 2011 Market Report (Excel version) Revised Table of Contents and proposed Deadlines Action items and proposed deadlines New/additional topics for 2011 Special Report from Japan

Revised table of contents with timeline – part 1 To be provided by the Association in: Due Date: 1. World Semiconductor Market Analysis 1.1 Executive Summary Japan 31 March 1.2 Regional Market Developments 1.2A China China 1.2B Chinese Taipei Chinese Taipei 1.2C Europe Europe 1.2D Japan 1.2E Korea Korea 1.2F USA USA 2. Worldwide semiconductor market 2.1 Semiconductor market size and growth 2.2 Market size by product 2.3 Market growth rate by product 2.4 Market size by region 2.5 Market growth rate by region 2.6 Market size by application   2.7 Selected Data on Key End Markets 2.7A Electronic equipment production - China 31 March 2.7B Electronic equipment production - Chinese Taipei 2.7C Electronic equipment production – Europe 2.7D Electronic equipment production - Japan 2.7E Electronic equipment production - Korea 2.7F Computer equipment production – US

Revised table of contents with timeline – part 2 To be provided by the Association in: Due Date: 3. Import / Export Data 3.1 China China 31 March 3.2 Chinese Taipei Chinese Taipei 3.3 Europe Europe 3.4 Japan Japan 3.5 Korea Korea 3.6 USA USA 4. Supplemental data 4.1 Data on capital expenditures 1997 -2010 4.1A China 4.1B Chinese Taipei 4.1C Europe 4.1D Japan 4.1E Korea 4.1F USA

Revised table of contents with timeline – part 3 To be provided by the Association in: Due Date: 4.2 Data on R&D expenditures 1997 – 2010 4.2A China —— 4.2B Chinese Taipei Chinese Taipei 31 March 4.2C Europe Europe 4.2D Japan Japan 4.2E Korea Korea 4.2F USA USA 5. Background

Action items and proposed timeline All Associations to check and confirm due dates, or communicate alternatives (meeting) All Associations – if not done already- to communicate TF member details to SIA in Japan Proposed timeline: First set of data by: 31st March SIA in Japan to distribute first consolidated excel version, and send to IAs by: 14th April IAs to send comments by: 20th April SIA in Japan to circulate draft presentation version, and send to IAs by: 27th April IAs to send comments to SIA in Japan by: 4th May Final Excel & Presentation version by: 11th May

Special Report from Japan: Proposed Topic Provided by SIA in Japan TV & LED TV Market Newly Developed Product (3D, Smart TV, etc.) LED Market Energy-saving Product … and so forth

Timelines of Special report from Japan Deadlines to follow WSC normal report

Thank You For Your Attention !