Smart Grid SC– January – NIST PAP2 Name Company Address Phone

Slides:



Advertisements
Similar presentations
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Advertisements

Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Doc.: IEEE /1268r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– September 2011 Date: 22 September 2011 Discussion topics.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Smart Grid ad hoc – August 2011
Supplementary Plenary Information - July 2010
Vertical Applications TAG
Smart Grid ad hoc Meeting Information - January 2010
Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name
Smart Grid ad hoc Meeting Information - January 2010
Smart Grid ad hoc – May – SGIP NIST PAP2 2 - EPRI FAN Name
Wireless Characterization for NIST PAP#2
IMT-Advanced Report Tech Requirements Outline
Supplementary Plenary Information - July 2010
Submission Title: Link Budget for m
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
IMT-Advanced Closing Report
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
Supplementary Plenary Information - September 2010
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
IMT-Advanced Technical Requirements
Smart Grid ad hoc Closing Report - March 2010
Supplementary Plenary Information - May 2010
ETSI Liaison Requests November 08
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
doc.: IEEE <doc#>
Supplementary Plenary Information - September 2009
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Supplementary Plenary Information - May 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Smart Grid Technology Discussions 2010
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Submission Title: [WG-TG3 Opening Report Jan02]
Plenary Information - September 2009
<month year> doc.: IEEE < e> January 2012
WBA Carrier Wi-Fi Liaison request - March 2014
Telecommunications Standards for Smart Grids
Presentation transcript:

Smart Grid SC– January 2012 1 – NIST PAP2 Name Company Address Phone doc.: IEEE 802.11-11/0152r1 Janaury 2012 Smart Grid SC– January 2012 Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988 bkraemer@marvell.com Date: 18 Janaury 2012 Discussion topics during November Atlanta Session Tuesday Abstract: 1 – NIST PAP2 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Jacksonville Agenda High level PAP02 GOALS, Work plan, Schedule, Janaury 2012 Jacksonville Agenda High level PAP02 GOALS, Work plan, Schedule, Discussion of details as appropriate Catalog of Standards Modeling Tool PAP02 Intro Cyber Security Publications and References Bruce Kraemer, Marvell

Janaury 2012 NIST SGIP PAP02 Update Bruce Kraemer, Marvell

Major 802 Support Elements in SGIP January 2012 Major 802 Support Elements in SGIP Smart Grid Strategy Program management Document Publication OpenSG Utility Requirements NIST SGIP PAP#2 SDOs Technology Capabilities Bruce Kraemer, Marvell

High Level 802 Goals in the PAP02 Context January 2012 High Level 802 Goals in the PAP02 Context Recognition of IEEE 802 wireless standards in NIST Catalog of Standards Acceptance of wireless standards as viable in Smart Grid deployments Bruce Kraemer, Marvell

Major 802 Engagement Opportunities in SGIP January 2012 Major 802 Engagement Opportunities in SGIP Participate in the PAP02 activity to develop Wireless Guideline 2.0 Prepare and Submit application paperwork for 802 standards to NIST for inclusion in the Catalog of Standards Bruce Kraemer, Marvell

PAP#2 Status Published: Version 1 January 2012 PAP#2 Status Published: Version 1 NISTIR 7761: NIST Priority Action Plan 2 Guidelines for Assessing Wireless Standards for Smart Grid Applications Wireless Capability Matrix Application Communication Requirements Matrix Extended Work: Update of the Guidelines with goal of completing Version 2 by August 2012 http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP02Wireless Slide 7 Bruce Kraemer, Marvell

Guideline Version 1 Janaury 2012 Attribute Standard Information Identifier of the standard NIST IR 7761 Title of the standard Guidelines for Assessing Wireless Standards for Smart Grid Applications Name of owner organization NIST Latest versions, stages, dates 1 URL(s) for the standard http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessing_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCosSIFNISTIR7761 Bruce Kraemer, Marvell

Guideline Sections Sect 2 Acronyms and Definitions January 2012 Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Bruce Kraemer, Marvell

January 2012 Annexes ANNEX A IEEE 802.11 ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE 802.16/WIMAX NETWORK Slide 10 Bruce Kraemer, Marvell

Guideline 1 to 2 Differences January 2012 Guideline 1 to 2 Differences Provide a significantly better method for analyzing/comparing the performance of a wireless technology in a representative physical environment with a specified data load scenario Utilize realistic data loading (developed by OpenSG) Correct definitions contained in Section 4 Significantly extend the technology modeling (SDO sub com) in Section 5 Bruce Kraemer, Marvell

PAP02 Guideline - Schedule Overview Janaury 2012 PAP02 Guideline - Schedule Overview Wireless Guideline 1 published – Jan 13, 2011 Finalize wireless model – Oct 7, 2011 Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012 Collect all details on modeling scenarios – Nov 4, 2011 Exercise, refine, output model results – Feb 3, 2012 PAP02 vote on Guideline 2 Submit Guideline 2 to CoS process – April 16, 2012 Wireless Guideline 2 published – Aug 10, 2012 Bruce Kraemer, Marvell

SDO Sub group SDO Sub-group January 2012 SDO Sub group SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday effective 8/8/2011 from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge: +1-858-658-1111 Conference ID: 3827472 Passcode: 0681 Bruce Kraemer, Marvell

Work in Progress: Chapter 4: Chapter 5: Update: Range Estimator: January 2012 Work in Progress: Chapter 4: Chapter 5: Update: Range Estimator: Chapter 6: Slide 14 Bruce Kraemer, Marvell

January 2012 January 03, 2012 Update: SDO Sub-group Progress Doug Gray Farrokh Khatibi Bruce Kraemer, Marvell

January 2012 Background The PAP02 SDO Sub-group meets every Monday 9:00-10:30AM pacific time. No calls Dec 26th, and Jan 2nd, Next call Jan 9, 2012 SDO Sub-group Goal: Update NISTIR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Focus on the wireless communication aspects Section 4: Wireless Technology (includes link the Wireless Capabilities Matrix) Section 5: Modeling and Evaluation Approach Section 6: Factors to Consider in Evaluating Performance Annexes: Technology-specific Also working on a Modeling Tool for end users (e.g., the utilities companies) Linked to Section 5 (or possibly a new section) Bruce Kraemer, Marvell

Status & Plans: Section 4 January 2012 Status & Plans: Section 4 Section 4: Wireless Technology Lead: Farrokh Khatibi Text completed and reviewed by SDO Sub-group Sent out for PAP02 review & comments – Dec 5, 2011 Comments due – Fri, Jan 6th To be Done: Review and address PAP2 feedback – Jan 9th call, possibly Jan 16th (depends on amount & type of feedback) Update Wireless Capabilities Matrix to comply with new Section 4 text Submit new Matrix to SDO for updates Completion date: TBD Bruce Kraemer, Marvell

Status & Plans: Section 5 January 2012 Status & Plans: Section 5 Section 5: Modeling and Evaluation Lead: Doug Gray Final draft completed for SDO review Nov 28, 2011 SDO reviewed and accepted sub-sections 5.1 thru 5.2.1.1 (Group A items) Dec 19th Reviewed and identified some additional inputs for 5.2.2: Indoor Models (Group B) To be Done: Jan 9th or 17th : Complete review of Group B – Indoor Models and begin review of next sub-sections Mid to late Feb for completed SDO review seems reasonable Bruce Kraemer, Marvell

Status & Plans: Section 6 January 2012 Status & Plans: Section 6 Section 6: Factors to Consider in Evaluating Performance Lead: TBD Needs to be aligned with Section 4, 5, & Annexes Can’t complete Section 6 until revisions to Section 5 & Annexes are completed Bruce Kraemer, Marvell

Status & Plans: Modeling Tool January 2012 Status & Plans: Modeling Tool Excel Modeling Tool: Lead for Wireless Module: Doug Gray Lead for Demographic Module: TBD (Ron for now) Introduced (linked) in Sub-Section 5.2.7 Latest revision (Wireless Module) v2.6 Input: Data density requirements (MB/s/sq-mi) and Area to be covered (sq-mi) [derived from Demographic Module] Output: Required BS-to-BS spacing & number of required BS Current version includes example parameters [Eventually requires valid technology-specific parameters] Additional work awaiting the completion of Section 5 Need to relate latency (QoS) to channel capacity Focus on Link budget – suitable margins for interference, penetration loss, etc & estimating channel capacity for different wireless technologies Bruce Kraemer, Marvell

January 2012 UCAIUG •The UCA® International Users Group is a not-for-profit corporation consisting of utility user and supplier companies that is dedicated to promoting the integration and interoperability of electric/gas/water utility systems through the use of international standards-based technology. It is a User Group for IEC 61850, the Common Information Model – Generic Interface Definition (CIM/GID as per IEC 61970/61968), advanced metering and demand response via OpenDR. Our Mission: To enable utility integration through the deployment of open standards by providing a forum in which the various stakeholders in the utility industry can work cooperatively together as members of a common organization to: Influence, select, and/or endorse open and public standards appropriate to the utility market based upon the needs of the membership. Specify, develop and/or accredit product/system-testing programs that facilitate the field interoperability of products and systems based upon these standards. Implement educational and promotional activities that increase awareness and deployment of these standards in the utility industry. Bruce Kraemer, Marvell

Open SG Utility Data Flow information January 2012 Open SG Utility Data Flow information Latest data descriptions Actors Flows Data size Security levels http://osgug.ucaiug.org/UtiliComm/Shared%20Documents/SG-NET%20PAP%20work-in-progress/Database-wip/database/SGNet-2010mod29Aug2011-5.1.zip Bruce Kraemer, Marvell

802 Smart Grid Teleconference Plans January 2012 802 Smart Grid Teleconference Plans Calls have been scheduled at 2pm ET on Wednesdays Call topics between January & March meetings ?? Call Dates to schedule?? Jan 25 - No Feb 01 Feb 08 Feb 15 Feb 22 - No Feb 29 - No Mar 07 - No Bruce Kraemer, Marvell

Guideline Sections Sect 2 Acronyms and Definitions January 2012 Guideline Sections Sect 2 Acronyms and Definitions Sect 3 SG Conceptual Model & Business Requirements Sect 4 Wireless Technology Sect 5 Modeling & Evaluation Approach Sect 6 Factors to Consider Sect 7 Conclusions Sect 8 References Sect 9 Bibliography Annex (e.g. A, B, C, D, E) Re-write focus Bruce Kraemer, Marvell

January 2012 Annexes ANNEX A IEEE 802.11 ANNEX B 3GPP LONG TERM EVOLUTION (LTE) ANNEX C 3GPP HIGH SPEED PACKET ACCESS (HSPA) ANNEX D CDMA2000 1X AND HIGH RATE PACKET DATA (HRPD) ANNEX E IEEE 802.16/WIMAX NETWORK Slide 25 Bruce Kraemer, Marvell

SDO Sub group SDO Sub-group January 2012 SDO Sub group SDO Sub-group Purpose: Sub-group open to anyone with technical knowledge interested in contributing to clarifying SDO terms and generating estimates for covered equipment When: Occurs every Monday from 9:00 AM to 10:30 AM (UTC-08:00) Pacific Time (US & Canada). Conference Bridge: +1-858-658-1111 Conference ID: 3827472 Passcode: 0681 Bruce Kraemer, Marvell

Open SG Utility Data Flow information January 2012 Open SG Utility Data Flow information Latest data descriptions Actors Flows Data size Security levels http://osgug.ucaiug.org/UtiliComm/Shared%20Documents/SG-NET%20PAP%20work-in-progress/Database-wip/database/SGNet-2010mod29Aug2011-5.1.zip Bruce Kraemer, Marvell

802 Smart Grid Teleconference Plans January 2012 802 Smart Grid Teleconference Plans Calls have been scheduled at 2pm ET on Wednesdays Agreed on one call between January and March meetings Feb 08 – Telecon to discuss recommended parameters from 11ah and 15.4g to use in the propagation model Bruce Kraemer, Marvell

January 2012 Telecon Feb 08 Bruce Kraemer, Marvell

Range Estimator Variables - Example Supplied January 2012 Range Estimator Variables - Example Supplied Frequency in MHz 2000 BS Antenna Gain dBi 15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas 1 Number of Base Station Rx Antennas Base Station Rx Noise Figure dB 4.0 Terminal Type (Actor)   Fixed Outdoor Mounted Terminal Fixed Indoor Self-Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless-Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi 12.0 5.0 7.0 0.0 -1.0 Tx Amplifier Power per Antenna Element (watts) 0.5 0.2 2.0 0.1 Number of Terminal/(SS) Tx Antennnas 1 Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB 6.0 DL Channel OH Factor 29.3% Bruce Kraemer, Marvell

Range Estimator Variables - Example Supplied January 2012 Range Estimator Variables - Example Supplied 802.11ah 917.5 802.15.4g 917.5 Frequency in MHz 2000 BS Antenna Gain dBi 15.0 Tx Amplifier Power per Antenna Element (watts) 10.0 Number of Base Station Tx Antennas 1 Number of Base Station Rx Antennas Base Station Rx Noise Figure dB 4.0 Terminal Type (Actor)   Fixed Outdoor Mounted Terminal Fixed Indoor Self-Installed Terminal Vehicular Installed Mobile Terminal Feeder Line Device Wireless-Enabled Smart Meter Mobile Handheld Device Terminal (SS) Antennna Gain dBi 12.0 5.0 7.0 0.0 -1.0 Tx Amplifier Power per Antenna Element (watts) 0.5 0.2 2.0 0.1 Number of Terminal/(SS) Tx Antennnas 1 Number of Terminal/(SS) Rx Antennnas Terminal (SS) Rx Noise Figure dB 6.0 DL Channel OH Factor 29.3% Bruce Kraemer, Marvell