TTC Hot Topic Common Questions

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Training in Vacuum Technology for JUAS 2013 Students
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
ESS Vacuum Standardization
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Field Emitter Workshop Summary Rong-Li Geng 2016 CEBAF StayTreat June 28-30, 2016.
Recent Result for the STF-2 Cryomodule Operation
SRF Operating Experience at JLab
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
First ideas on particle free installation of BESSY VSR
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Degradation and Recovery of Cavity Performance
DESY Experiences on Use of Gas overlay during Assemblies
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Update on HW commissioning
Definition of work flow for string DESY Example on critical operation
XFEL Vacuum System Commissioning
Operational Experience - Field Emission
Regular cryomodule maintenance plans (radiation damage, seals, etc)
Optimum cryomodule length at the ESS
RF test results of SRF cavity evacuated with NEG pump
Performance Degradation cERL Injector Cryomodule
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Workshop Aim Rongli Geng February 29, 2016
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Magnetic Field Sensors and Measurements in Cryomodules
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Residual Gases in CEBAF Warm Beam Line Sources and Evacuation
Presentation transcript:

TTC Hot Topic Common Questions Hiroyuki Ao TTC Meeting at RIKEN, Wako, June 28, 2018

Common Questions about Warm and Cold Transition (By R. Geng) 1. What is the design of warm beamline systems next to a cold SRF cryomodule? size (ID and length) and material of the beam pipe? type and capability of vacuum pumps? beam diagnostic instruments (such as BPM, wire scanner, beam viewer etc)?  2. What kind of gate valves are used to isolate the cavity string from the warm beamline system? fast valve or slow valve? under what conditions these valves are actuated? 3. Are NEG pumps used? if yes, how these pumps are activated? 4. What is the cleaning procedure for the warm beamline system? What is the QA/QC for the cleanliness/particulate count?  5. What kind of vacuum gauges are used for beamline vacuum monitoring? are they resistant to ionization radiation? H. Ao, TTC2018 at RIKEN, June 28, 2018

Common Questions about Warm and Cold Transition (By R. Geng) 6. What kind of particulate monitoring has been done for controlling particulate generation and movement for individual components (pump, gate valve) and integrated warm beamline systems? 7. What have you learned from beam operation of SRF accelerators wrt particulate generation and movement and the impact to field emission characteristics? Cryo modules long term performance against warm section openings? or cryo-modules performances and specific beam instrumentations replacements? H. Ao, TTC2018 at RIKEN, June 28, 2018