Raymond Friem Chief Operating Officer Metro St. Louis, MO 314-982-1445 6/2/2014.

Slides:



Advertisements
Similar presentations
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advertisements

Operations Management Maintenance and Reliability Chapter 17
2/1/ TOP TEN REASONS FOR FAILING A MANAGEMENT AND OCCUPANCY REVIEW Presented by Robert Kriensky GH CAPITAL, LLC.
00 Project Gates Briefing to the Capital Program Oversight Committee February 2011 Capital Program Management.
MAINTENANCE PLANNING AND SCHEDULING
WMATA ALTERNATIVE FUEL/CLEAN FLEET PROGRAMS PRESENTED TO VIRGINIA TRANSIT AGENCIES JUNE 9, 2009.
NAME Of Transportation Supervisor DATE The Business of Transportation.
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
Metropolitan Transportation Commission December 8, 2004 TDA Performance Audits of Six Transit Operators.
Strategic Control Control is taking measures that synchronize outcomes as closely as possible with plans Traditionally, has been almost completely based.
IMPLEMENTING FINANCIAL AND ACCOUNTING SYSTEMS FOR GOVERNMENT CHRISTIAN T. SOTTIE THE CONTROLLER AND ACCOUNTANT-GENERAL GHANA.
How to Grow Your Business Larry N. Harrison & Co. CPAs & Consultants Larry N. Harrison & Co. CPAs & Consultants.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Steve Schwabe Woolpert Project Manager
Take Flight September EXECUTING STRATEGY : THE BASICS THE ROLE OF STRATEGY What is Strategy? Why is Strategy Important? How is Strategy Formulated?
[Presentation Date] [Presenter Name, Organization, Title] The Need to Repair & Replace [Your Region’s]Transit Network Presentation to [Organization] [Insert.
Process Industries Benchmarking Professor Munir Ahmad School of Science and Engineering Teesside University NEPIC Presentation.
109 Civil Engineer Support Equipment SEABEE COMBAT WARFARE NCF OFFICER SPECIFIC.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
Anatomy of a Project What Every Engineer Should Know About Project Management, A.M. Ruskin and W.E. Estes A project has a beginning and an end. The major.
Wireless Directions University of California, Davis Wireless Technology Team February, 2001.
The Analyst as a Project Manager
APTS – Fourth Day Miscellaneous Topics. Fleet Management Fixed Route versus Paratransit Operations versus Maintenance.
BP Centro Case Top management job descriptions Team 4 Jussi Tiilikainen Jiri Sorvari.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Computerised Maintenance Management Systems
Optimised Fleet Management Presented by: Andrew Railz – Fleet Manager Bundaberg Regional Council.
9 - 1 ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 9 Management Control Systems.
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 14 Enterprise Resource Planning Systems.
Server Virtualization: Navy Network Operations Centers
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
DAS: State Controller's Division1January 2010 Department of Administrative Services State Controller’s Division Updated January, 2010.
Lessons Learned on WMATA’s Performance Journey Rick Harcum Director, Office of Performance Washington Metropolitan Area Transit Authority.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
Best Fleet Practices Department of General Services Presenters: Sharyl Blackington, Fleet Manager John Manring, Maintenance Fleet Coordinator April Heinze,
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
CONTROLLING.
Life cycle services for automation products
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Suffolk City Public Schools Transportation Assessment TransPro Consulting July 9, 2015.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
Catholic Charities Performance and Quality Improvement (PQI)
1 FY2006 TDA Triennial Performance Audits Metropolitan Transportation Commission Programming & Allocations Committee October 4, 2006 GGBHTD (Golden Gate)
Computerised Maintenance Management Systems
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
TPCM Supporting World Class Standards Supporting World Class Mining Standards Driving Efficiencies in the Pilbara.
RCPS Transportation Department Overview Spring 2012.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Cost of Poor Quality Cost of Poor Quality.
7.03 Manage financial resources to ensure solvency.
Maintenance Scheduling
Graduation Project (II): Operations Improvement at Mhanna Factory
MAINTENANCE PLANNING AND SCHEDULING
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Metro St. Louis RCM Journey
PURCHASING MANAGEMENT
Phoenix Public Works Support Services
Presentation transcript:

Raymond Friem Chief Operating Officer Metro St. Louis, MO /2/2014

Prepared by the Transit Vehicle Maintenance Division of Bi-State Development Agency May 23, 2002

Mission Statement Develop an affordable solution for the long-term maintenance of the Agencys MetroBus and Call-A-Ride vehicle fleets while improving customer satisfaction and system reliability.

Previous Experiences Rolling stock declines in operability and desirability from in-service date to retirement date. Major maintenance investments made in the declining years of bus life cycle. Maintenance costs vary widely between fiscal years. Maintenance level of effort not coordinated with rolling stock capital investment cycle.

Situation Prior to the Plan Three Garages o Three completely different Business Models Inconsistent mechanic-to-bus, mechanic-to-operating mile ratios. Average fleet MDBF less than 4,500 miles, varies by garage. Main Shop (Central Repair) o 15% of fleet awaiting repair Average turn-around for bus is 117 days. For Sale (Scrap fleet) 20% of buses. decommissioned have drive train components with less than 35,000 miles.

Business Concept: MetroBus Perform specific maintenance at regularly scheduled intervals based on unit mileage. o Replace single major overhaul at 400,000 miles with smaller scale rebuilds at 200,000. o Perform comprehensive body and minor drive train scheduled repairs at 100,000 mile intervals. o Perform pre-programmed tune-ups, and minor scheduled activities at 50,000 mile intervals. o Utilize central maintenance facility assets in support of preventative maintenance efforts; reduce focus on break- down maintenance. Perform pre-failure overhauls on individual components. o Implement vehicle configuration management system.

Business Concept: Call-A-Ride Pre-programmed overhaul activities at 50,000-mile intervals Development of standard work procedures through M4 system Full integration of Call-A-Ride into storeroom system

Goals & Objectives 1st year goals o Achieve departmental consensus on pre- programmed maintenance activities. Complete audit of original manufacturer suggested maintenance intervals against consensus recommendations. o Develop bill of materials/parts requirements for support groups in advance of need. o Develop standard work procedures for pre- planned and routine maintenance activities. o Determine mechanic abilities/training requirements for proper completion of all maintenance activities.

Goals & Objectives 3-year goals o Rework inspection maintenance program to better support pre-programmed maintenance intervals. o Implement service writer concept (used by profitable maintenance businesses in automotive industry). Improve and standardize data acquisition. Free up existing staff to be more involved with quality of tasks performed and overall product on the street. Full implementation of planned maintenance activities.

Impact on Support Departments Create automated interdepartmental interface to work order system, provide for reasonable pre-notification of impending maintenance activity. o Reduce reliance on last-minute parts acquisition procedures which are overused and less accountable than standard storeroom procedures. o Reduce number of mechanic trips to storeroom window.

Impact on Support Departments Review facility (production plant) capabilities, upgrade as necessary o Determine Choke Points where out-of- service equipment could impact. maintenance productivity. Hoists, Dynamometers Electrical Service Portable Diagnostic Test Equipment for Field Maintenance functions

Program Risks Risks o Pre-programmed maintenance outline is fatally flawed at its inception Assumptions on component life cycles erroneous Missed or non-addressed components Addressing risk o Monitoring of existing system reports Service delays Road calls Customer complaints o Implement mean distance between failure measure. Specific to unit and subsystem

Other Performance Monitoring Sources Negative Contacts, Equipment, Bus/Van/Rail o Compiled by Customer Service Department Monthly Road-calls o From Transit Operations Subsystem Mean Distance Between Failure Analysis o New measure under development Financial Performance o Corporate financial statements

Anticipated Program Rewards Vehicle maintenance expenses become more predictable Improved curb appeal and quality in passenger compartment Predictable vehicle reliability over entire life cycle Improved maintenance productivity without significant increase in costs

Key Issues Near term o Review per-unit replacement schedule, develop interim maintenance programs to extend service life as necessary. o Resist temptation to reduce maintenance costs in short term. Long term o Right Sizing of human assets between maintenance work-sites could cause changes in location of jobs. o Current information often lacks sufficient detail. Data acquisition sources and content require additional review. o Analytical skills development needed in Supervisory Staff. o Increase coordination between capital and operating expense plans.

Potential Bus Replacement Scenarios

Bus Replacement Cash Outlay Options

6/2/2014

MetroBus Road Call Analysis

State Of Good Repair Key Indicators Measurable o Improved MDBF o Lower maintenance cost per operated mile o Improved fuel economy o Fewer passenger complaints against rolling stock

State of Good Repair Lagging Indicators Less training on equipment, more training on system Existing staff has more research time o Isolated Failures are really fleet problems that havent drawn attention to themselves….yet! This will lead to detailed study of apparent minutia…. But let it go. You never know where it will lead.

State of Good Repair Lagging Indicators Improved Test Procedures o System and Subsystem certifications. Newest Fleet is averaging no more than 10% above fleet average annual miles operated. o Oldest fleet is conversely averaging less than 10% below fleet average.

State of Good Repair Lagging Indicators Time in Shop is Dramatically Reduced o Buses in the shop are there for scheduled activities. No more Maintenance Campaigns o Updates / Modernizations slotted into most practical maintenance cycle. Fleet achieves conformed state. Tremendous Savings in parts cost.

State of Good Repair Lagging Indicators With a little coaching…A TEAM is Born o Intermodal or inter-garage competitiveness replaced with an ongoing discussion about best practices. o Union personnel picking from one location to another find identical tools, procedures and practices in place. o Mechanics are more prepared to become supervisors, supervisors are more promotable.

State of Good Repair - Coaching Tips Develop One Common Measure for All Managers – Incorporate into Evaluations o Modal or garage-level measures still necessary and important but are a lesser measure.

State of Good Repair - Coaching Tips Rotate Key Manager Assignments o Central Repair Area Supervisors learn the impact of their teams work on finished product. o Garage Supervisors assigned to Central Repair learn the level of difficulty involved in meeting the customer expectation. Eliminate It was Good When I Had It!

Inspect to Fail = Expect to Fail