November 2013Steven Foulston Technical Department Working Time model Royal Opera House Covent Garden.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Alternative Work Schedules: Training for Supervisors.
Risk Management Initiative: Wage and Hour Issues for Employees and Supervisors Module Office of the Vice President for Ethics and Compliance Office of.
Driver Certificate of Professional Competence Course One Drivers, Hours & Tachographs © Les Kelly 2010.
Student & Work Study Employment Facts & Time Card Training
A New Paradigm for the CIO Contract Presented By: Mary Dowell.
Contract categories 3 distinctions if the work is manual (worker) or intellectual (employee) if time is limited or not if the work is full-time or not.
1 Academic Contract and Work Planning by UCU SHU Branch Committee (with minor additions by Rob Hunt)
North West Sports League Football Rules 1.All normal F.A. rules apply 2.All teams must adhere to FA Respect Programme. 3.Each college / 6 th Form must.
©Whitehead Monckton Agency workers and self- employed contractors – when casual workers can become anything but Neil.
IG Metall collective bargaining 2012 for the Metal- and Electrical- Industry.
Agency Workers Regulations 2010 in force since October 1 st 2011 Summary.
LESSON 12 LO4.3 Consider the legal and regulatory framework on employment cessation arrangements.
Temps de travail en France. Durée légale du travail 35 hours each working week paid overtime annual paid leave sick leave maternity and paternity leave.
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
JDAT: A team of doctors offering independent advise about rotas and pay to doctors and trusts. Average.
Chapter 3 Workforce scheduling.
The Royal College of Midwives. RCM members have voted YES to take industrial action. The RCM’s industrial action will start on Monday 24 th November with.
California Alternative Workweek Schedule Management Meeting
This webinar is brought to you by CLEONet CLEONet is a web site of legal information for community workers and advocates who work with low-income.
1 Basic Elements of a Collective Agreement ILO-UNI Course on Collective Bargaining Postal and Telecom Sector 22 March – 2 April 2004 Turin.
Post-Secondary Education, Training and Labour The Right Balance Employment Standards Branch.
Trust Policy The Trust aims to maintain a workforce that is highly skilled, competent and flexible and one that puts the patient at the centre of maintaining.
Alternative Work Week Schedules
Labour Standards Flash Cards Saskatchewan Labour.
WORKING HOURS SALARIES. They will result from substracting from the 365 days of a regular year (366 for leap years) the overall number of saturdays, sundays,
CHINA-EU FORUM workshop 38a Beijing, 9-10 July 2010 Multi-dimensional protection of labour rights 6/2/20151.
THE RIGHTS OF EMPLOYEES: WORKING HOUR LABOUR LAW.
EMPLOYMENT INSURANCE EMPLOYMENT STANDARDS IN ALBERTA PAY OVERTIME VACATION PAY WORK HOURS HOLIDAY PAY TERMINATION REST PERIOD DEDUCTION.
LECTURE 7.  Only if it is agreed between the employer and employee. Agreement valid for 1 year.  Overtime: ◦ Per day = no limit. Act however limit.
Click mouse button to advance Labour Standards Quiz.
New Jersey Transit Fatigue Risk Report Assignments for 27 th October December
1.3 Motivating Staff & Legislation. Pay: The legal requirements The law affects many aspects of pay. Employers need to be aware of these requirements.
EMPLOYMENT IN TRANSPORT SECTOR IN TIMES OF CRISIS AND RESTRUCTURING Maja Knafelc, Legal Adviser at ZDS.
Institute of Employment Rights The Health Agenda at Work 17 February 2010
CONTRACTS OF EMPLOYMENT. FEATURES OF A CONTRACT Under The Employment Rights Act (1996) employers must employees who have been working for more than one.
Protection of Young Persons Act 1996 Employment Law.
MATH 10 – UNIT 4. FM. 3 Students are expected to: Describe, using examples, various methods of earning income. Identify and list jobs that commonly use.
Copyright ©2008 Michigan State University
Look through these slides for more information. Types of contracts pay and professional practices.
Basic Conditions of Employment - 57 of 1997 (67).
1 Labour Standards for Young Workers Presentation.
Scheduling in TEAM TEAM-IFPTE Local 161 August 20 th, 2012.
© J. Christopher Beck Lecture 24: Workforce Scheduling.
Chapter Two The Employment Act and Related Acts
BCEA 2 LECTURE 5.
Changes to the Hours of Service Regulations For Truck Drivers Rob Abbott Vice-President of Safety Policy American Trucking Associations.
H&S week. Working Time Regulations 1998 (U.K.) Purpose of Working Time Regulations Why do we need this regulation? To prevent employers from taking advantage.
Labour Law – ARR224 Lecture 6
WORKING TIME DIRECTIVE Pearle conference Stockholm – December 2009 Agenda point 10.
Alberta Labour Laws CALM 20. Alberta Labour Laws Your Employer is responsible for: Giving you a Statement of Earnings. This includes: The pay period covered.
Megan Branson.  Paid annual leave or recreational leave  Paid personal leave-sick leave or carers leave  A minimum period of notice if fired  You.
EARNED TIME ELIGIBILITY AND PROCEDURES Presented by the Office of Human Resources December, 2014.
CHAPTER 10 The regulation of working time. The Working Time Regulations define limits on working time and provide for breaks and rest periods to ensure.
Navigating the changes to employment legislation HOW DO THEY AFFECT YOU AND YOUR BUSINESS?
Economic Well Being Tutorial: Employment rights. Aims and Objectives To become familiar with employment terms To understand your legal rights as an employee.
Lector PhD in Law Rustem Nazmetdinov REST TIME 1.
Employment Standards Act
Palestinian labour law.
New Rules for IHSS: Overtime and Related Changes October 21, 2014
Employee statutory rights and responsibilities
Regulation of working and rest time in new Labour Code
Local 13’s TENTATIVE AGREEMENT WITH Halifax Regional Municipality
WORKING HOURS.
Unit #1: Earning Income.
Working Time Goals for Collective Agreements
What are your rights as an employee? What are you entitled to?
THE IMPACT OF WORKING TIME
European Labour Law Jean Monnet Chair of EU Labour Law Academic Year Silvia Borelli:
Basic Conditions of Employment Act of 1997
Presentation transcript:

November 2013Steven Foulston Technical Department Working Time model Royal Opera House Covent Garden

November 2013Steven Foulston UK Legal framework Working Time Regulations (1998) –48 working hours averaged over a 17 week period (Individuals can agree to work more, with no penalty to the employer) –1day off in 6 days, or 2 consecutive days off in 14. –11 hour overnight break –20 minute break per 6 hours worked. –Minimum 5.6 weeks paid annual leave. –Special rules for young people, pregnant women and overnight workers.

November 2013Steven Foulston Team Structure – Technical Stage Covent Garden is a rep house, at least 7 shows in rehearsal/on stage at any one time. Daily Teams – Blue and Red shift – 30 per team (Electrics/Stage/Props/Flys) Project Teams - one team allocated to Front each show - 4 teams, 7 per team. (Electrics/Stage/Props) Build crew – 1 team, 6 staff (set construction/dismantle/transport to storage warehouse)

November 2013Steven Foulston Daily Team work pattern Red Shift: SunMonTueWedThurFriSatSunMonTueWedThurFriSatSunMon On OffOnOffOnOff OnOffOnOffOn Blue Shift: SunMonTueWedThurFriSatSunMonTueWedThurFriSatSunMon Off OnOffOnOffOn OffOnOffOnOff Annualised Hours contract – 2496 hours per annum Equates to 48 hours per week Alternating shifts – 15 hours duration between 7.30am – 11.30

November 2013Steven Foulston Project Team work pattern Work follows the rehearsal/performance schedule. Hence general working hours are known up to a year in advance, but actual working times are notified the previous week. General rules: –Annualised Hours contract – 2496 hours per annum –Equates to 48 hours per week –Working window 7.30am – 11.30, maximum 15 hours per shift. –A maximum of 280 hours can be worked during a four-week period –A minimum, if called, of four hours on any working day –There must be a minimum rest period of not less than 11 hours between calls.

November 2013Steven Foulston Set Building team Same rules apply as per Project Team, but in practice, the team regularly work a Monday – Friday 8am – 6pm pattern.

November 2013Steven Foulston Issues/challenges 15 hour shift system is physically demanding, especially for older staff/those with medical conditions. 15 hour shift system is technically outlawed under the Working Time Regulations. However the Regulations allow a derogation by collective agreement. The arrangement is currently popular with staff, however there is a business risk, as they may collectively give 3 months notice to withdraw. In which case we would need to rethink our working model.