Fielding plan details and adjustments

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

Lesson Objectives Review Capabilities Development documents and processes for Information Technology and Information Systems IT Box – (current JCIDS manual)
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
Office of the Secretary of Defense
DAU Update International Acquisition for FIPT November 17, 2014 DT Tripp Chair, International Programs Department Defense Systems Management College Defense.
JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
 A hazard is anything that can cause injury or loss.
OASD Logistics and Materiel Readiness
OASD Logistics and Materiel Readiness
PROMISE RISK TO CONTRACTORS RISK TO GOVERNMENT CASH FLOW PROGRESS PAYMENTS ADMINISTRATION FEE/PROFIT COST- REIMBURSEMENT Best Effort Low High As Incurred.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Life Cycle Logistics.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
LOGISTICS ACQUISITION, AN EMPHASIS ON PLANNING FOR PERFORMANCE
Materiel Solution Analysis (MSA) Phase
Production Considerations
ISA 201 Intermediate Information Systems Acquisition
Product Support Strategy Demonstrated Performance
DAG CH 3 Figure 11: Weapon System Development Life Cycle
Life Cycle Logistics DAWIA Certification Requirements (FY18)
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Range Cost Estimates Estimating Accuracy Trumpet
Cloud in a Rack Tuan Tran 10 March 2016
Space System Segments This presentation provides background on space systems along with tailoring considerations when acquiring Department of Defense space.
A B C Solution Analysis Technology Maturation & Risk Reduction
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
c EMD Focus Plan to define product support package & supply chain
Engineering Design Process
Product Support Strategy
International Acquisition
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Relocation CARNIVAL come one…come all
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
Technology Maturation & Manufacturing Development Phase
Product Support Strategy Demonstrated Performance
The MDAP Process MDAP Process Price Fighters Services Concept Refinement System Development & Demonstration Production & Deployment Operations.
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Fielding plan details and adjustments Operations & Support B Technology Maturation and Risk Reduction Engineering and Manufacturing Development Production & Deployment C LRIP/IOT&E Materiel Solution Analysis FRP IOC Acquisition Sustainment A Product support package elements refined Detailed site fielding plans refined Sustaining Engineering Logistics assessments LCSP Focus Fielding plan details and adjustments How sustainment performance requirements will be measured, managed, assessed and reported (Availability/Reliability/Maintainability/Affordability) Identification of Sustainment Risks/Issues and Resolutions Design demonstrated/Early Fielding Issues Analytical and management processes for : Refining product support package elements Fielded performance management and metrics Cost drivers and availability degraders Refinement of Resource Requirements/Workload Estimates/Cost Estimates Should Cost Initiatives