European Transparency Requirements

Slides:



Advertisements
Similar presentations
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Advertisements

Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Transparency Workstream Gas Regional Initiative North West Region By: Cemil Altin Workstream Leader Bonn Workshops 8-9 February 2007 NRA logo.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
GRI NW Transparency Stockholm Stakeholder Group Conference 26 November 2009 Martin Crouch Partner: European Strategy.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Lessons from developments in the past ten years – GB experience Alison Kay – National Grid, Transmission Commercial Director.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project Project.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Implementation progress – second stage Olaf Islei European Strategy and Environment.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
1 1 Brussels, 31 st March 2009 Presentation by Peter Hohaus Senior Manager Legal & Regulatory Affairs ERGEG North West Gas Regional Energy Market Transparency.
Gas Storage Investment - Traders’ Perspectives European Federation of Energy Traders Board Member and Gas Committee Chairman
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
EU Phase 3 Customer communications
Congestion Management
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
Conclusions STC Core Group 8 September 2009 The Hague
Gas Regional Initiative North-West
The 3rd package for the internal energy market
Transparency Project GRI NW Region
New transparency guidelines
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Update on GRI NW Transparency Project
ETSO Comments on the draft Congestion Management Guidelines
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
ERGEG GRI South South East – , Maribor
ERGEG GRI – N/NW Region Stakeholder Group Meeting
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
GRI NW TRANSPARENCY PROJECT
Update on European Network Codes
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Transparency Project GRI NW Region.
Gas balancing – where next
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
EUROPEAN TRANSPARENCY UPDATE
Publication of Historical Gas Operational Data by National Grid NTS
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EURELECTRIC transparency requirements
Richard Fairholme E.ON UK
Transmission Workstream - EU 3rd Package Update
Gas European Network Code Implementation
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Stefan Leedham Transmission Workstream 2nd November 2006
Transmission Workstream, 1 Mar 07
Presentation transcript:

European Transparency Requirements Transmission Workstream 3rd April 2008

European Transparency Drivers Transparency seen as key to liberalization of European gas market Drivers: Compliance with existing EC Regulation 1775/2005 3rd Package of amendments to current Regulation/Directives on gas market liberalization Gas Regional Initiative (GRI) GRI NW Roadmap

GRI NW Transparency Project European Regulator’s Group for Electricity and Gas (ERGEG), of which Ofgem is member, established Gas Regional Initiative in April 2006 Promote further liberalisation of national markets Develop regional solutions as stepping stone to European gas market UK within GRI NW

GRI NW Transparency Project Aim: improve publication of capacity and flow data Transparency project plans developed by TSOs Demonstrate commitment to respond to market requirements Established TSO information release principles e.g. release will not prejudice any TSO customer, TSO or any other stakeholder Operators response to EFET “wish list”/Ofgem transparency questionnaire Agreed information provision extends beyond requirements of EC Regulation 1775/2005

NW GRI Transparency Project Agreed Information Release Capacity Maximum technical capacity of the transmission system Level of interruption probability Daily commercial firm and interruptible capacity Flow Information Daily flow and interruptions Daily prompt allocation information to each shipper Daily aggregate day-ahead nominations Historic gas flow information database Information only refers to cross-border interconnection points and LNG terminals

UK Compliance requirements UK regime largely compliant and frequently exceeds requirements Only 2 gaps identified concerning exit capacity and day ahead nominations Compliance requires provision of day ahead nominations at interconnectors and LNG terminals Bacton (IUK), Bacton (BBL), Moffat, Easington (Langeled), Milford Haven, Isle of Grain publication of maximum, sold and available exit capacity at interconnectors Bacton IUK and Moffat TSOs to publish agreed data set no later than December 2008 Mods required to address information provision gaps

Future Developments Roll out information published to all entry points and relevant Exit points Current focus on capacity but post 3rd Package may include D-1 & D+1 information on supply/demand Nominations, forecasts and realised flows in and out of System “level of detail shall reflect information available to TSO”