Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS

Slides:



Advertisements
Similar presentations
Hydrologic Modeling with HEC-HMS
Advertisements

Unit Hydrographs Ch-7 (Streamflow Estimation)
Flood Profile Modeling with Split Flows and Weirs
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
WinTR-20 Calibration ProceduresFebruary WinTR-20 Calibration Procedures.
Importance of Land use management on the Flood Management in the Chi River Basin, Thailand Kittiwet Kuntiyawichai Bart Schultz Stefan Uhlenbrook F.X. Suryadi.
Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
CHARACTERISTICS OF RUNOFF
Risk Analysis Division — Risk MAP Considerations for Developing Rainfall- Runoff Models for Large Watersheds – Passaic River Watershed, New Jersey Presented.
Hydrologic Simulation Models
Chapter Two Net Storm Rainfall. Hydrograph Vocabulary Rising limb, a falling limb, and a recession. The rising limb and falling limb are separated by.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Kansas City Industrial Council Hydrology and Hydraulics
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
KINEROS (KINematic runoff and EROSion model) Michael Schaffner Senior Service Hydrologist NOAA National Weather Service WFO Binghamton, NY Eastern Region.
The use of a streamflow hydrograph to estimate ground-water recharge and discharge in humid settings By Al Rutledge U.S. Geological Survey Geological Society.
COMPUTATION OF DISCHARGE DATA GENERAL: –DISCHARGE CANNOT BE MEASURED DIRECTLY AND CONTINUOUSLY –STAGE MEASUREMENTS h(t) ARE MADE CONTINUOUSLY OR AT FIXED.
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
HEC-HMS Simulation Adding a detention pond at the outlet
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
HEC-HMS Runoff Computation.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Hydrologic Analysis Dr. Phil Bedient Rice University.
Fluvial Geomorphology GRG 338-C Streamflow (Discharge)
Ongoing Research Skunk Works project Started before hydromod was mainstream Hydromod only Engineering challenge to solve agency processing problem for.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Update to the 1992 Dry Creek Watershed Flood Control Plan CESI/RBF RR/KM FEMA CTP HYDROLOGY.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
Hydrologic Calibration: October 2010 U PDATE OF E FFECTIVE H YDROLOGY FOR M ARYS C REEK.
Week 2. Work plan 2 Week 1 Week 2 Hydrological models Hydraulic models 1D quasi 2D 2D (25x25 m) Flood resilience 2D (5x5 m) Structural measures.
Basic Hydrology & Hydraulics: DES 601
Routing-Hydrologic and Hydraulic
Rainfall-Runoff modeling
Swamp Creek: Culvert Replacements
HEC-HMS Simulation Adding a detention pond at the outlet
TR-55 Urban Hydrology for Small Watersheds
SPU Modeling & Monitoring
DES 606 : Watershed Modeling with HEC-HMS
Nathan Lowe, Shawn Stanley and Jeffery Crump
Cristina Nelson, Term Project, CEE 6440, Fall 2007
The Drainage Basin System
Potholes Supplemental Feed Route Project
Test Drive Results and Revisions of the New Stream Restoration Crediting Protocols Bill Stack & Lisa Fraley-McNeal December 2, 2013.
Map-Based Hydrology and Hydraulics
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Update to the 1992 Dry Creek Watershed Flood Control Plan
Hydrologic Simulation Models
Calculating Hydrologic Parameters for Estimating Surface Water Flow at Ungaged Locations Richard Hoffpauir Water Resources Engineering.
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
CEVE 412/512 Dr. Phil Bedient Jan 2016
Hydrologic River Routing
Hydrology.
Water Resources Engineering Hydrological Analysis and Simulation Model HEC-HMS Prof. Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering.
Applied Hydrology Hydrological Analysis and Simulation Model HEC-HMS
Flood Frequency Analysis
Hyetographs & Hydrographs
Love Field Modernization Program
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
State of Calibration for California Central Valley Groundwater-Surface Water Simulation Model (C2VSim) CWEMF 2019 Annual Meeting Folsom, CA Presenter:
Presentation transcript:

Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS Or What Happens When a Project Requires Use of an HEC-1 Model to Evaluate Regional Benefits and an Unsteady HEC-RAS to Model Project Function

History of Miners Ravine Off-Channel Detention Basin 1992: Flood Control Study called for on-channel basin 1998: On-channel basin concept rejected Off-channel basin concept pursued 2006-2007: Off-channel basin constructed First, some history…

Sierra College Boulevard, 1995

Project and Dry Creek Watersheds Point out project location and the objective to quantify flow reduction benefit between Folsom Rd and Vernon St

Project Site The site was bounded to the south by Miners Ravine. There was a berm between the creek and the historic sewage treatment area. It was determined that due to habitat, geotechnical and geometric constraints, it was not feasible to use the western portion of the site as had been anticipated in the District’s feasibility study. Our goal was to demonstrate that an effective project could be constructed on the available land.

Available Models HEC-1 models of the Dry Creek watershed HEC-RAS models converted from HEC-2

Modeling Challenges HEC-1 models did not provide reasonable hydrographs necessary to evaluate basin function from 2- to 100-year events HEC-RAS models did not reflect the pre-project flood attenuation function of the site

HEC-1 Flow Hydrographs These showed the initial flow to be similar in the 2- to 100-year events and the 10-year initial flow to be higher that the 100-year initial flow. This didn’t match baseflow. The initial flow in the 2-year event was greater than the falling limb flow. This didn’t make sense.

Pre-Project Site in the Floodplain provided some Peak Flow Reduction

Original HEC-RAS Modeled Project Area as Ineffective Flow Effect of existing embankment was not considered in the pre-RBF models. Also, the bridge definition precluded weir flow over Sierra College Boulevard.

Modeling Goals Provide a consistent basis for evaluation of project alternative Evaluate local flow and stage reduction Estimate benefits at locations about 3.5 miles downstream, below major confluences.

Steps to Make an Apples to Apples Assessment of Basin Benefit Create HEC-HMS from HEC-1 Use HMS results as input to RAS Create detailed unsteady RAS model of existing site Create unsteady RAS model of project alternative configurations Use unsteady RAS results as input to HMS model Use HMS model results and steady-state RAS rating curves to quantify downstream benefit

HEC-HMS from HEC-1 This project was done in HEC-HMS 2.2.2. (note: Due to the new data management system, it isn’t a simple matter to convert to HEC-HMS 3.2.) HEC-HMS wouldn’t run due to missing values.

Miners Ravine in HEC-HMS The project site is just below the SCB MRC junction. Miners Ravine in HEC-HMS

HEC-1 Definition Typical on Miners Ravine KK MR30 ROUTE MRC6 TO MR30 RS 15 FLOW -1 SV 47 101 185 267 348 427 SQ 500 1000 2000 3000 4000 5000 KK MR30 BA 1.75 BF -23 -0.08 1.01 PT 8 PR 8 LU .10 .09 11 US 1.31 .60 KK MRC7 - COMBINE MR30 WITH ROUTED MRC6 HC 2 KK MR31 ROUTE MRC7 TO MR31 SV 31 66 133 210 283 330 Note that there was no storage value for a zero discharge in the SV/SQ records

Adding Zeros…

Makes a Difference Fixing the low flow point in the Modified Puls model not only made a difference in the low flow portion of the hydrograph, major event peak discharges were also significantly lower with the corrected routing. These flows were used (along with 5-, 25- and 50- year hydrographs) as upstream from hydrographs for the unsteady RAS evaluation of the project site.

Detailed Baseline Unsteady Model

Refined Model Simulates Pre-Project Weir Flow

Detailed Proposed System Unsteady Model

Hydraulic Model Shows Benefit Near the Site

HEC-RAS Results Used in HEC-HMS

HEC-HMS Routing Replaced by Gage Unsteady-state HEC-RAS flow results entered as a gage hydrograph to an HEC-HMS model with routing above the project site removed.

Each Run Required a Basin Model

HEC-HMS Provided Results for Flow Reduction Calculation

Compared Results for Numerous Options and Recurrence Intervals Numerous scenarios were evaluated and the preferred configuration further refined. Note that flow reduction for the 25-year event is lower than the reduction for the 10-year of 50-year events because the pre-project embankment configuration was reasonable effective at attenuating 25-year runoff.

Stage Reduction from Rating Curves from Steady-State HEC-RAS

Stage Reduction from HEC-HMS Flows and HEC-RAS Rating Curves

Modeling Effort Demonstrated Benefit of Control Structure

Process Led to Project Construction!