CDS | Spillette / DeShazo Tang // PavlikFebruary 4, 2009 Hurst – Bellaire Redevelopment Plan Existing Conditions and Economic Analysis Summary 2.

Slides:



Advertisements
Similar presentations
2-Points to White Rock East Area Plan February 7, 2012 Briefing for the City Plan Commission.
Advertisements

Planning for New Neighborhoods linked to Transit: Santa Monica’s
Potential East Side Homeless Drop-in Center Update March 20, 2012.
Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
AGENDA – PUBLIC FORUM July 9, Welcome and backgroundRod Lehnertz 2.Flood Task Force UpdateGregg Oden 3.Site Selection StudiesJoe Hibbard 4.Public.
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Linden Hills Small Area Plan WorkshopWorkshop April 24 & 25, 2013.
OLDE TOWN ARVADA TOD Community Meeting November 13, 2013 Olde Town TOD.
2009 Strategic Planning playbook
Planning Commission April 14, 2010
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Advisory Committee Meeting #3 July 17, :30 p.m. Downtown Livability Initiative.
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Salt River Pima-Maricopa Indian Community Community Development Department ZONING ORDINANCE AND DESIGN UPDATE (ZODU) Sustainable Land Use, Culturally Influenced.
Block 11 Redevelopment Phase I: Varsity Pub Expansion February 11, 2014.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
City Council Meeting Agenda Items October 28, 2013.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
9 th & Colorado Proposed Urban Redevelopment Area 1 Land Use, Transportation & Infrastructure Council Committee June 4, 2013.
PSSA Preparation.
What’s Happening? What’s happening in Tysons? A lot!
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Twinbrook Sector Plan A New Community in the Technology Corridor
Community Opportunities The values associated with Smart Growth communities encourage affordable, mixed income housing; higher density; and a vibrant,
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Land Use Study for the Community of Winchester May 21, 2012.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
CBJ Project Manager: Heather Marlow Consultant Team: Sheinberg Associates With team members: – Walker Macy – Northwind Architects – Kittelson & Associates.
Village of Ossining Vision Presentation Frederick P. Clark Associates, Inc. May 11 th, 2005.
Land Use Study for the Community of Winchester July 9, 2012.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
Land Use Single family uses - 30% of land Community Services - 13% Roads - 13% Multi- family use 8% Vacant 6% 2 Family use – 6% Parks – 5% Commercial –
Public Meeting: Tuesday, February 25,  Relationship to Comprehensive Plan  Existing Conditions  Transportation Overview  Market Overview  Concept.
Thursday, November 18, 2010 LOMBARD DOWNTOWN PLAN Village Board Meeting Lombard Downtown Revitalization VILLAGE BOARD MEETING Thursday, November 18, 2010.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
SR 436 / SR 50 Area Redevelopment Plan Board of County Commissioners February 24, 2009 Board of County Commissioners February 24, 2009.
Land Use and Zoning Bottineau Van White Station Area Plan Presentation to Bassett Creek Valley ROC, Bryn Mawr Neighborhood, and Harrison Neighborhood November.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Potential Neighborhood Development Strategies 158 acres Close.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
The Concept for City Center – The Power of TOD TOD Advisory Committee Meeting 3 December 10, 2009 The Premier Place for a Premier City.
La Plaza Vieja Neighborhood Plan Transportation Commission Meeting Wednesday, September 30, 2015 Sara Dechter, AICP City of Flagstaff Comprehensive Planning.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
Council for Quality Growth North Fulton Advisory Meeting
253 South Los Robles Avenue Predevelopment Plan Review
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
CFT Gateway Center ( E. Foothill Blvd
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017.
83 North Lake Avenue Predevelopment Plan Review
ROOSEVELT CITY GENERAL PLAN 2010
Kimley-Horn & Associates
254 East Union Street Pre Development Plan Review
115-Unit Mixed-Use Project (711 E
Presentation transcript:

CDS | Spillette / DeShazo Tang // PavlikFebruary 4, 2009 Hurst – Bellaire Redevelopment Plan Existing Conditions and Economic Analysis Summary 2

Economic Analysis – basis for alternatives developed, analyzed, and designed Strengths and Opportunities Support for moderately-priced new single family development based on recent sales Large redevelopment tracts possible (8, 10, 12 acres) Connectivity to surrounding area pretty good (SH 121/183, SH 10) Artisan Center Theater Weaknesses and Challenges Concentration, age, and condition of apartments Retail oversupply, age and property condition, and nearby competition strong Internal connectivity not good Therefore, Market-Based Focus for Conceptual Design Plans: Redevelopment into single family, limited retail, and limited mixed- use / multifamily CDS | Spillette / DeShazo Tang // Pavlik

Conceptual Design Planning Surrounding Context Map 5

Existing Transportation Plan: Links to freeways available. 6

Current Zoning 8

Parcel Re-Development Opportunities 9

Opportunities and Constraints 10

Critical Success Factors for any Plan or Redevelopment Physical connections and linkages for vehicular and non-motorized travel Re-orientation of the commercial strip center(s) Carve out under-utilized large parking fields for maximized opportunity Create a public plaza or permanent open space for community events, perhaps representing Hispanic community Link Parks to the surrounding neighborhood Create an arts / entertainment district Fill-in and connect pedestrian linkages and sidewalks with street grid design Find home for a police sub-station 12

Alternatives Concepts Investigated: Redevelop the Theater vs.Theater Moves Away Internal Plaza Orientation vs.Pipeline Orientation Add Internal Roads vs.No Circulation 200,000 SF Retail vs.100,000 SF Retail Community Arts District Focus vs.Neighborhood Focus Pipeline as Vehicular Thoroughfare vs.Pipeline as Pedestrian Focus Focus Around Intersection(s) vs. Focus Around Park(s) Not an option The Arts / Entertainment District Alternative The Neighborhood Alternative 13

The Neighborhood Alternative: Intimate, neighborhood scale; add character with a focus and attention to Bellaire Park Small cultural gathering opportunities such as a band stand Small neighborhood retail opportunities centered between Pipeline Road and the neighborhood park Pipeline as pedestrian oriented streetscape scale for Pipeline Road with on-street parking Internal street network for increased pedestrian, bicycle and vehicular circulation as link from neighborhood to park. CDS / Spillette / DeShazo Tang // Pavlik The Art / Entertainment District Alternative: Focus on creating an Art and Entertainment District and Redevelop the Artisan Theatre Internal focus around a main street plaza and gathering space Create a larger community commercial node at the intersection of Pipeline and the re-alignment of Brown Trail Re-define Pipeline as a boulevard road supporting vehicular circulation as an east-west thoroughfare Same. Internal street network for increased pedestrian, bicycle and vehicular circulation, but more to/from central district.

The Neighborhood – 1 st Phase Opportunity CDS | Spillette / DeShazo Tang // Pavlik Introduce opportunity for mixed-use product and replace retail displaced Create home for Police sub- station for additional safety and interaction with community Create direct street and sidewalk access around park for added safety and accessibility by surrounding community 16

The Neighborhood – 2 nd Phase Opportunity CDS | Spillette / DeShazo Tang // Pavlik Transition retail to mixed- use product along Pipeline In-fill Single Family homes to create a neighborhood with a street grid network Provide various lot sizes and product type opportunities Meet current demand for market supported single family product and establish a neighborhood density that would then support future demand opportunity for attached housing of proposed full build-out 17

The Neighborhood – Full Build-out of Proposed Alternative CDS | Spillette / DeShazo Tang // Pavlik Unit Counts Single Family Lots: 176 Small Single Family Lots: 55 Single Family Attached: 153 Square Feet Counts Multi Family Attached: 525k Mixed-Use (1 st floor retail): 88k Mixed-Use (2 floors res): 225k Police Sub-Station: 6k Parking Required: ~ 1,418 Parking Provided: ~ 1,300 *Off-Street Parking not included in calculations and is proposed along Pipeline to support Mixed-Use product. *Parking requirements reduced to: 1.5/du, 1/300sqft retail. Multi Family and Mixed-Use assumed 3 floors. 18

CDS | Spillette / DeShazo Tang // Pavlik The Neighborhood – Meeting Critical Success and Sustainable Opportunities Critical Success Factors Physical connections and linkages for vehicular and non-motorized Fill-in and connect pedestrian linkages LEED-ND Opportunities Connect street grids through project (NPDp1) Expand street grid density and connectivity through site (NPDc8, NPDc11) 20

CDS | Spillette / DeShazo Tang // Pavlik The Neighborhood – Meeting Critical Success and Sustainable Opportunities Critical Success Factors Re-orientation of commercial with Mixed-Use along Pipeline Road Maximize use of under-utilized large parking fields for opportunity LEED-ND Opportunities Maintain sustainable percent of services for a mix of uses based on market demand (NPDc2) Enhance densities (NPDp2, NPDc1) Reduce impervious surface area of surface parking (NPDc6) 21

CDS | Spillette / DeShazo Tang // Pavlik The Neighborhood – Meeting Critical Success and Sustainable Opportunities Critical Success Factors Create a public plaza or permanent open space for community events representing Hispanic community Link Bellaire Park to the surrounding neighborhood LEED-ND Opportunities Enhance outdoor public space (NPDc12) Reduce heat island effects with landscaping (GCTc10) 22

CDS | Spillette / DeShazo Tang // Pavlik The Neighborhood – Meeting Critical Success and Sustainable Opportunities Critical Success Factors Find home for a police sub-station LEED-ND Opportunities Introduce Internal bike network (SLLc5) 23

The Art / Entertainment District – 1 st Phase Opportunity CDS | Spillette / DeShazo Tang // Pavlik Create Boulevard on Pipeline with key pedestrian intersections Create home for Police sub- station for additional safety and interaction with community Introduce opportunity for mixed-use product Align Brown Trail for direct connection to highways Create new home for Artisan Theatre sharing surface parking Create direct access of streets and sidewalks around park for safety and accessibility 26

The Art / Entertainment District – 2 nd Phase Opportunity CDS | Spillette / DeShazo Tang // Pavlik In-fill retail opportunity at major intersection In-fill Single Family homes that create neighborhood grid street network Provide various lot size opportunities Meet current demand for market supported single family product and establish a neighborhood density that would then support future demand opportunity for attached housing of proposed full build-out 27

The Art / Entertainment District - Full Build-out of Proposed Alternative CDS | Spillette / DeShazo Tang // Pavlik Unit Counts Single Family Lots: 177 Small Single Family Lots: 35 Single Family Attached: 126 Square Feet Counts Multi Family Attached: 422k Mixed-Use (1 st floor retail):108k Mixed-Use (2 floors res): 216k Police Sub-Station: 10k Retail: 18k Theatre: 30k Parking Required: ~1,483 Parking Provided Surface: ~1,100 Parking Provided Structure: ~340 *Off Street Parking not included in calculations and is proposed along the internal main street art district. *Parking requirements reduced to: 1.5/du, 1/300sqft retail, Multi Family and Mixed-Use assumed 3 floors, 4 floors parking structure, 500 seat theatre. 28

The Art / Entertainment District – Meeting Critical Success and Sustainable Opportunities CDS | Spillette / DeShazo Tang // Pavlik Critical Success Factors Physical connections and linkages for vehicular and non-motarized Fill-in and connect pedestrian linkages LEED-ND Opportunities Connect street grids through project (NPDp1) Expand street grid density and connectivity through site (NPDc8, NPDc11) 30

The Art / Entertainment District – Meeting Critical Success and Sustainable Opportunities CDS | Spillette / DeShazo Tang // Pavlik Critical Success Factors Re-orient commercial with Mixed-Use along Pipeline Road Carve out under-utilized large parking fields for maximized opportunity LEED-ND Opportunities Enhance densities (NPDp2, NPDc1) Maintain sustainable percent of services for a mix of uses based on market demand (NPDc2) Reduce impervious surface area of surface parking (NPDc2) 31

The Art / Entertainment District – Meeting Critical Success and Sustainable Opportunities CDS | Spillette / DeShazo Tang // Pavlik Critical Success Factors Create a public plaza and internal main street New street can be closed for events and become pedestrian zone Maybe focus on Hispanic community Create an arts district LEED-ND Opportunities Introduce bus and transportation options (Highly recommended to support reduced parking and district concept) (SLLc4) Enhance outdoor public space (NPDc12) 32

The Art / Entertainment District – Meeting Critical Success and Sustainable Opportunities CDS | Spillette / DeShazo Tang // Pavlik Critical Success Factors Link Bellaire Park to the surrounding neighborhood Fill-in and connect pedestrian linkages, add green spaces LEED-ND Opportunities Enhance outdoor public space (NPDc12) Reduce heat island effects with landscaping (GCTc10) 33

The Art / Entertainment District – Meeting Critical Success and Sustainable Opportunities CDS | Spillette / DeShazo Tang // Pavlik Critical Success Factors Find home for a police sub-station LEED-ND Opportunities Introduce bike network (SLLc5) 34

Southeast Hurst and Bellaire Sustainable Development Plan 33 Safe Routes to School Re-Build Bellaire Dr. Artisan Concept Critical Success Factors Physical connections and linkages Link Park to the surrounding neighborhood Re-orientation of the retail strip center(s) Find home for a police sub- station Re-use under-utilized large parking land Create permanent open space for community events representing Hispanic community Foster arts / entertainment district Fill in with street grid design Concept Plan Stakeholders Property Owners Residents Bedford Artisan, tenants JPS, Tarrant Co., United Way, HEB ISD, Parks Dept.

Next Steps 3 Community input now to end of March Staff outreach to stakeholders, owners, others Newsletter, Business Quarterly Draft Plan Preparation Draft back to City – mid-March Draft financial recommendations from consultants Presentation to key groups Joint P&Z, EDAC, City Council – late March Stakeholder meeting, community meeting Input back to consultants Final Report – mid- to late April Recommended schedules, strategies, responsibilities If developer/owner and project identified….Potential for application to NCTCOGs current call for sustainable development implementation projects CDS | Spillette / DeShazo Tang // Pavlik