Preliminary CSC Trigger Results from September Testbeam

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
F. Odorici - INFN Bologna
DAQ Requirements M. Villa 21/02/2011.
Electronics Trigger and DAQ CERN meeting summary.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
TELL1 A common data acquisition board for LHCb
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
Darin Acosta University of Florida
VELO readout On detector electronics Off detector electronics to DAQ
September CSC Beam Test Report
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Global Trigger and Global Muon Trigger
SVT detector electronics
Sector Processor Status Report
Readout electronics system for Laser TPC prototype
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Preliminary CSC Trigger Results from September Testbeam CSC Endcap Muon and CSC Trigger Electronics groups

Beam Test of 2 CSC’s at X5a / Front-end cards Goal: complete electronic chain test of data transmission from CSC front-end electronics to the Track-Finder trigger, all operating synchronously at the 40 MHz structured beam

CSC Track Finder Trigger Home-built PLL clock patch added to clean incoming TTC clock for links, but TTC QPLL also tested Test 3 × 1.6 Gb/s optical link connections from CSC electronics Uses TLK2501 chipset Requires very stable reference clock for error-free operation

TTC QPLL Mezzanine card Three made available to CSC group for testing at this month’s structured beam test Provides stable clock signals at 40, 80, and 160 MHz

BX Structure Seen by Track-Finder

Test Results Using home-built PLL solution, or newest TTC QPLL solution for 80 MHz clock: PLL’s lock to incoming machine clock 40.078893 MHz no errors on optical links reported over many hours Data successfully logged by both CSC DAQ and CSC Track-Finder readout Very preliminary inspection shows 95% exact agreement in data sent and received over optical links (15K events) The remaining 5% are likely OK as well, but the simple analysis must be refined to handle data on multiple BX

Comparison of TF Data with DAQ CSC Data from DAQ CSC Track-Finder Data CSC 1 CSC 2

The Happy Track-Finder Group