WECC RC Forum October 12, 2018.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Peak RCCo Performance Metrics Draft –November 2013.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Joint Electric Scheduling Subcommittee Update October 29, 2013.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Rare Diseases Clinical Research Network Data Management and Coordinating Center (RDCRN DMCC) Rosalie Holland LDN Investigator Meeting at WORLDSymposium.
IMS Implementation Project
Bert Peters Chair, Path Operator Task Force
Kenneth Silver Los Angeles Department of Water & Power
Schedule Margin July 2013 NAVY CEVM
Stacen Tyskiewicz CIIMS Chair July 12, 2016
Phase Angle Limitations
ERCOT CRR Update to CMWG
Stacen Tyskiewicz CIIMS Chair October 18, 2016
Unscheduled Flow Administrative Subcommittee Report
WECC Regional Standards Update
Path Operator Implementation Task Force
CIIMS Proposal for TOP-003 Approach
AARP Foundation Tax-aide
Western Electricity Coordinating Council
Phil O’Donnell, Manager Operations and Planning Audits
Business Practices Subcommittee Update
UK Link Technology Refresh
Kenneth Silver Los Angeles Department of Water & Power
Audit Documentation and Administration
Mgr. Interconnection Reliability Initiatives
Sales Process March 2017.
MIC Committee Discussion
Mgr. Interconnection Reliability Initiatives
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Reliability & Market Impacts Resulting from RC Expansion
Enhanced Curtailment Calculator (ECC)
Coordinate Operations Standard
Approach to Market Cutover - Draft for Discussion
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Eric Whitley/Steve Ashbaker
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
How to conduct Effective Stage-1 Audit
Phil O’Donnell, Manager Operations and Planning Audits
WECC RC Forum October 12, 2018.
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Reliability & Market Impacts Resulting from RC Expansion
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
MIC Committee Discussion
Peak Update Michelle Mizumori.
Bert Peters Chair, Path Operator Task Force
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
WIAB WECC Interchange Authority Backup
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
RC Transition and Tools (WIT, ECC) Update
SPP West Shadow Operations
Presentation transcript:

WECC RC Forum October 12, 2018

Meeting Topics Multiple Cut Over Dates Category 1 – Time Critical Decisions ECC XML EIDE (Load, Generation, Forecast and Outage Data) WIT MAP (Market Alert) Category 2 – Agreement in Concept - Decision Western Interconnection Model UFMP Category 3 – Discussion of Additional Transition Items Time Error Correction (Monitor) UDSA vs ORD RAS / GIS Data Sharing Data Submission to WECC / NERC Retention and Storage of historical data

Multiple Cut-Over Dates Specific concerns include: Four cycles of procedure development, training and shadow operations Four system/tool updates to address data transfers, monitoring, alarming, and contingencies Four cycles of readiness activities for Peak Peak identified a concern regarding the fall 2019 multiple RC transition dates CAISO 7/1/19 BCH 9/2/19 CAISO 11/1/2019 SPP 12/1/19 (earliest date) Fewer dates would remove some risk associated with shadow operations, certification; common tools, data transfers, coordinated site visits with NERC and WECC SPP requires 15 months to implement RC services BAs in CAISO RC area concerned about dates later than November 1, 2019 Action Items: Sub-Committee formed to develop a staging and coordination plan for Shadow Operations with Peak Future RCs to review internally if a common cutover date can be supported

ECC – Category 1 Decision Recommendation: 2019: Peak RC continue to hold the ECC contract until Peak terminates its RC function RCs to lead decision to choose the option to meet IRO-006-WECC-2 with assistance from the ECC Task Force  DTBD Q4 2019: ECC to be integrated with CAISO EMS system with network model that represent Western Interconnection Decision: SPP and CAISO agree with recommendation; AESO and BCH do not use ECC Action Items: RC jointly work with OATI on change orders to support multiple RC approval and WebIntegrity alerts RCs to check – OATI agreeable to multiple RC signatures

XML EIDE Load, Generation, Forecast and Outage Data Exchange Format – Category 1 Decision Recommendation: 2019: Peak RC continue to be the data repository for Western Interconnection until Peak terminates its RC function Recommend Peak to continue to work with CAISO and SPP to minimize change in Peak COS and impact to BA/TOP DTBD Q4 2019: CAISO serves as the data repository for Western Interconnection for both outage and forecast data Each RC obtain interchange forecast data from WIT Decision: SPP, AESO, BCH, CAISO agree on recommendation and pulling interchange data from WIT Each RC to obtain load, generation, forecast and outage data from their participants then send to CAISO in an agreed upon format (xml). CAISO will become a hub for all submitted data for each RC to pull data from Action Items: Sub-Committee: determine daily submission deadline prior to shadow operations periods WECC to review current requirement to have expected energy profile of dynamic schedules in the Day Ahead

WIT – Category 1 Decision Recommendation: 2019: Peak RC continue to hold the WIT contract and RCs jointly lead the decision to choose the option to meet the need for multiple RC DTBD Q4 2019: CAISO holds WIT contract and manages administrative processes. Decision – On Hold Discussion: Option 1: One RC maintains the contract and all data (such as after the fact data) Option 2: Multiple RCs maintain separate contracts data for BAs within their RC areas Option 3: one BA (potential concerns from some BAs given the interconnection wide data will be available to a single BA) Option 4: WECC (not in position to take ownership of tool and administration) Action Item: WEIL Task Force to gain broader perspective of Options from BAs RCs to verify if multiple contract through OATI is viable Peak to provide overview of WIT support activities and data inputs Sub-committee to develop a governance document for decisions and cost of shared tool changes

MAP (Merchant Alert Protocol) – Category 1 Decision Recommendation: CAISO can support MAP In order to support MAP, OATI webSmartOASIS need to be modified to interface with each RC’s messaging tools Recommend each RC work with BA/Transmission Service Provide currently using OATI webSmartOASIS to make the modification in OATI application to interface with the RC Decision: AESO is not a merchant BCH has access to webSmartOASIS; SPP and CAISO agrees with recommendation Action: SPP will verify with their participants if they want this feature

Western Interconnection Model Category 2 – Agreement in Concept - Decision Recommendation: 2019: Peak continues to maintain WSM for its use in its EMS and ECC DTBD Q4 2019: CAISO builds (stiches), maintains, validate and shares Western Interconnection EMS Network Model. Each RC will submit their model to CAISO in CIM15XML format CAISO will make available a validated Western Interconnection EMS Network Model to all RCs in CIM15XML format Each RC to validate their portion of the model once received Decision: SPP, CAISO,BCH and AESO agreed this decision

UFMP – Category 2 – Agreement in Concept - Decision Recommendation: Creation of specific operating procedure to memorialize July 1, 2019: CAISO will manage and approve UFMP step 4 for Path 66 through the use of the ECC tool Peak will manage and approve UFMP step 4 for Path 30,31 and 36 through the use of the ECC tool Coordination of Phase Shifter operations will be done by Peak to ensure that movement of Phase Shifters under Peak’s jurisdiction does not adversely impact or create SOL exceedance anywhere in the Western Interconnection DTBD Q4 2019: (when SPP becomes RC): SPP will manage and approve UFMP step 4 for Path 30,31 and 36 through the use of the ECC tool CAISO and SPP will coordinate the use of Phase Shifters in their RC areas to ensure that movement of Phase Shifters under each other’s jurisdiction does not adversely impact or create SOL exceedance anywhere in the Western Interconnection Decision: CAISO, SPP, AESO and BCH agree with this decision Action Item: CAISO and SPP to develop effective coordination plan, table top exercises

Time Error Monitor – Category 3 Discussion Recommendation: 2019: Peak continue to monitor Time error and administer the daily messages and process to update WIT until Peak terminates its RC function DTBD Q4 2019: Rotate time error process between SPP and CAISO Discussion: Option 1: Time Error monitor stays in one RC Option 2: Time error monitor is being rotated amongst RCs CAISO and SPP agree that the rotation concept is viable Action Items: Sub-committee: ISO, Peak, SPP, to consider time error impacts on WIT SPP and CAISO to develop rotation process proposal Review proposal with RC – RC Coordination team for evaluation

UDSA vs. ORD CAISO, AESO, BCH support the UDSA; not the ORD SPP currently requires BA/TOP in its RC area to sign ORD. SPP is a current to signatory to the UDSA CAISO is drafting modification to the UDSA to support the transfer from Peak in Q4 2019 Approx. 12 entities have signed ORD and may be unsure about signing a new version of the UDSA UDSA has controls on who can get data; 80% approval requirement for anyone else to have access. UDSA facilitation of gas pipelines to have access to some data Concerns raised about data sharing under two separate agreements across seams or among TOPs within separate RCs Action Items: CAISO will share changes with the RC team within the next week SPP to work with their RC customers to determine if they will sign the new version of the UDSA

Sharing RAS, Lat. / Long. GIS Data – Category 3 Discussion A significant amount of RAS and GIS data that is labeled as the highest level of protection Some Entities do not believe the UDSA covers this additional protection needed to share data. NERC: RAS will be specifically looked at during certification Action Items: Entities will work with other future RCs who will need RAS and GIS data on separate agreement Peak to Provide a list of all RAS and Non RAS automatic schemes in the RC areas SPP to check Entities in there RC are to verify if they have the same level of protections on RAS and GIS data.

Data Submission to WECC and NERC – Category 3 Discussion There are a subset of data that is sent by Peak to NERC directly for the use of SAFNR; section 800 of the ROP WECC obtains the information from NERC on events There is daily information provided by Peak to WECC; SPP, ISO, AESO and BC will have to provide the information; WECC has multiple contacts to obtain information Action Item: Sub-committee formed to discuss data submission to WECC and NERC WECC / NERC to document data, reports and access required

Next Steps RC – RC Coordination team to meet on approximately two week intervals Update and Close-out action items Further discussion on Category 3 items