ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018

Slides:



Advertisements
Similar presentations
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Advertisements

NTTG Report to TEPPC BiennialTransmission Plan.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
TRANSMISSION COSTS. Summary  The availability and cost of transmission are primary components in the Net Market Value (NMV) calculation used to rank.
North American Strategic Infrastructure Leadership Forum October 12, 2011.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
Charles Hosken, General Manager Imperial Irrigation District
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
Updated 1/28/2011.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
BUFFALO POWER COMPANY July 22, Oregon Trail Energy Project Buffalo Power Company, LLC High Plains Transmission, LLC.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
CCTA Process Review TAS Update – Feb 12th 2016
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Multi-State Clean Energy RFP 1 To explore whether a multi-state procurement might attract larger-scale projects and transmission than single state procurements.
LS Power LS Power is a power generation and transmission group
Questions for the Panel 1. Permitting & Siting Issues 2.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Topics Corporate Overview – Transmission Expansion Planning - Members
Visibility Ramu Ramanathan 10/1/2007.
Progress Briefing - Energy Initiative
EI-WECC Seams Study Needed
New England’s Growing Thirst for Renewables East Coast Energy Connection 2016 Patrick Woodcock Director, Maine Energy Office.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Transmission Planning Update October 20, 2010
Transmission System Customer Discussions – July 2009
Presentation to the Enron Corp. Finance Committee
Deliverability Maps for 2017 Peaking Capacity RFP
Background on the 2016 Study Program Process
Converter Transformer Market by Configuration, Voltage level, Application and Region - Global Forecast to 2020.
SunZia Project Description
First Wind Northeast Transmission Overview
POWER GRID INTERCONNECTIONS IN CHINA
Planning Committee- Map
Michael Bailey, P.E. SDS Meeting, June 25-26, 2018
CCTA Process Review TAS Update – Feb 12th 2016
RPCG – 2026 CCTA Results and Next Steps
Bringing Power from the North
Tyler Butikofer Associate Engineer II
Bringing Power from the North
Presentation transcript:

ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018

In This Presentation ITP Submittal Summary Status Overview of ITPs – based on public information provided by project sponsors Status Ongoing activities Milestones/Timeline

Interregional Transmission Project (ITP) Submittals

ITP: Six (6) Projects For more information regarding these projects, please refer to: https://www.columbiagrid.org/O1000Inter- overview.cfm

TransWest Express Transmission DC Project Project sponsor: TransWest Express LLC Technology: Two-Terminal, 600kV, Bipole HVDC Connections: Northern terminal: Wyoming (NTTG & potential WestConnect) Southern terminal: Nevada (CAISO, WestConnect) Capacity: Phased 1,500/3,000 MW In-Service Date: 2022 Cost Estimate: $2.11B (initial phase), $0.87B (increase the capacity to 3,000 MW)

TransWest Express Transmission DC Project* *Based on a presentation from TransWest Express LLC , March 31, 2018

TransWest Express Transmission DC Project* *Based on a presentation from TransWest Express LLC, March 31, 2018

TransWest Express Transmission AC&DC Project Project sponsor: TransWest Express LLC Technology: Two-Terminal, 500kV, Bipole HVDC and 500 kV AC Connections: Northern terminal: Wyoming (NTTG & potential WestConnect) Southern terminal: Nevada (CAISO, WestConnect) DC segment connects with the AC segment in Utah Capacity: Phased 1,500/3,000 MW In-Service Date: 2022 Cost Estimate DC segment: $1.62B (1,500 MW), $0.87B (increase to 3,000 MW) AC segment: $600M

TransWest Express Transmission AC &DC Project* *Based on a presentation from TransWest Express LLC, March 31, 2018

TransWest Express Transmission AC&DC Project* *Based on a presentation from TransWest Express LLC , March 31, 2018

Cross-Tie Transmission Project Project sponsor: TRANSCANYON Technology: 213 mile, 500 kV AC Transmission line Connections: Clover (NTTG) & Robinson Summit (WestConnect) 500 kV substations Anticipated Project rating: 1,500 MW In-Service Date: Q4 2024 Cost Estimate: $667M

Cross-Tie Transmission Line* *Based on a presentation from Transcanyon , May 18, 2018

Cross-Tie Transmission Line* *Based on a presentation from Transcanyon, May 18, 2018

Southwest Intertie Project (SWIP) - North Project sponsor: Great Basin Transmission (LS POWER) Technology: 275 mile, 500 kV AC Transmission line Connections: Midpoint (NTTG) & Robinson Summit (WestConnect) 500 kV substations In-Service Date: As early as 2021 Cost Estimate: $525M

SWIP - North* *Based on a presentation from LSPOWER , Great Basin Transmission, May, 2018

Southwest Intertie Project (SWIP) - North* *Based on a presentation from LSPOWER , Great Basin Transmission, May, 2018

North Gila – Imperial Valley #2 Project Development team: ITC Grid Development, LLC & Southwest Transmission Partners, LLC Technology: 97-mile, 500 kV AC Transmission line Connections: North Gila (WestConnect) & Imperial Valley (CAISO) 500 kV substations Also interconnect with a new Highline substation (WestConnect) In-Service Date: Q4 2022 Cost Estimate: $250M-$400M

North Gila – Imperial Valley #2* *Based on a presentation from ITC Grid Development, LLC and Southwest Transmission Partners, LLC, May 18, 2018

North Gila – Imperial Valley #2* *Based on a presentation from ITC Grid Development, LLC and Southwest Transmission Partners, LLC, May 18, 2018

Renewable Energy Express HVDC Conversion Project Project sponsor: San Diego Gas and Electric (SDG&E) Technology: Conversion of a portion of existing 500 kV AC Transmission line to a three-terminal HVDC system Anticipated Project rating: 3,000 MW In-Service Date: 2026 Cost Estimate: $900M – $1B

Renewable Energy Express HVDC Conversion Project* *Based on a presentation from SDG&E

Renewable Energy Express HVDC Conversion Project* *Based on a presentation from SDG&E

ITP Evaluation: Status Evaluation plans are being drafted For each ITP Primarily, describe the scope, and methodology will be used by the Relevant Planning Regions to evaluate each project Anticipated completion: End of 2019

Question: Paul Didsayabutra, paul@columbiagrid.org