What is the UL QFCP? FCIA Webinar Presenters:

Slides:



Advertisements
Similar presentations
Amy Peloquin Director of Certification ~
Advertisements

MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
Understanding the NJ Fertilizer Law for Turf Applications Jim Murphy Extension Specialist in Turfgrass Management.
NE 127 – Codes, Standards, and Regulations American Welding Society INSTRUCTOR: Chattanooga State CC.
1 Proposed Rule: Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing Presented at May 12,
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Special Education Accountability Reviews Let’s put the pieces together March 25, 2015.
Quality Management System
Office of Inspector General (OIG) Internal Audit
Quality Assurance/Quality Control Policy
FPSC Safety, LLC ISO AUDIT.
ISO 9000 Certification ISO 9001 and ISO
Continuing Professional Development Standards, principles, and practices.
4. Quality Management System (QMS)
1 | Weatherization Assistance Programeere.energy.gov Eric Bell 1 Federal/State Monitoring 2010 Orientation for State WAP Directors and Staff.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
OPERATOR, Tester & INSTALLER Licensing WWQRR, Chapter 17, Part L
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Certification Benefits and Maintenance Presented To: APICS Chicago Chapter June 17, 2003 Presented By: Ron Althaus,CFPIM,CIRM,C.P.M.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Visit us at E mail: Tele:
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Office of Pipeline Safety Qualifications of Individuals: Protocol Review Integrity Management Workshop July 23-24, 2002.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
FCIA Firestop Industry Conference San Antonio, TX November, 2008 Betsy Titus Gary Knef Underwriters Laboratories.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
2016 EEO OFFICERS ANNUAL ON-LINE TRAINING This presentation may be downloaded to your PC in order to complete the training session at your own pace. Presented.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Copyright © 2012 National Board of Certification for Medical Interpreters  1425 K Street NW, Suite 350 Washington, DC 
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Implementation of the NJ Fertilizer Law: What You Need to Know Jim Murphy Extension Specialist in Turfgrass Management.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Inspector's Role and Responsibilities
Child Welfare Certification Process
Annual Meeting Local School System NBPTS Contacts May 9, 2017
ISO 9000.
Inspector's Role and Responsibilities
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Occupational Licensing TCEQ
Inspector's Role and Responsibilities
MANUALS READ THE MANUALS!!
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Temporary Works Co-ordination
Standardization in the Beauty and Wellness Sector
Quality Management Systems – Requirements
Construction Management
Quality Assurance: Pay Factors and Dispute Resolution
Setting up an Internal Audit Program
Quality Control Personnel Training
CDE Transportation Unit
Certification.
Emulsion Task Force Meeting
Operationalizing Export Certification and Regionalization Programmes
How to conduct Effective Stage-1 Audit
ISO 9001:2000 Awareness Training
Occupational Licensing TCEQ
Exemption AdministrationTraining Related to Accepting Certificates
Occupational Licensing TCEQ
Presentation transcript:

What is the UL QFCP? FCIA Webinar 10-17-17 Presenters: Pamela Blanchette – Operations Manager –UL QFCP Matt Schumann - Technical Engineering Leader - BLT

Agenda What is the UL QFCP (Qualified Firestop Contractor Program)? What is needed to become Certified? -Step 1 – employ / have employee obtain DRI Certificate - Step 2 - Pass an on-site (office & job-site) audit assessment Application information UL- QFCP Certification Maintenance

What is the UL QFCP (Qualified Firestop Contractor Program) UL’s qualified contractor program currently consists of the Qualified Firestop Contractor Program and Qualified SFRM Contractor Program offering the industries independent, third party examination and audit services for the following: Acknowledgement of a Designated Responsible Individual (DRI) who has met Program Requirements and passed a written exam that tests knowledge of the FCIA Firestop Manual of Practice (Firestop Contractor Program) and the NFCA Manual of Practice (SFRM Contractor Program) and the UL Fire Resistance Directory. Assessment of Contractor’s established Management System and an on-site audit to determine conformance in accordance with applicable Program Requirements.

Agenda What is the UL QFCP (Qualified Firestop Contractor Program) What is needed to become Certified? -Step 1 – employ / have employee obtain DRI Certificate - Step 2 - Pass an on-site (office & job-site) audit assessment Application information UL- QFCP Certification Maintenance

What is needed to become Certified What is needed to become Certified? – Step 1 – employ / have employee obtain DRI certificate… Acknowledgement of a Designated Responsible Individual (DRI), who has met Program Requirements and passed a written exam that tests knowledge of the FCIA Firestop Manual of Practice (Firestop Contractor Program) and the NFCA Manual of Practice (SFRM Contractor Program) and the UL Fire Resistance Directory. Each Contractor under this Program shall have at least one Designated Responsible Individual (DRI), who is employed by the Contractor and meets the Program Requirements The contractor DRI shall possess demonstrated knowledge, of industry practices as evidenced – Meaning they need to pass the UL Firestop Exam with a score of 80% or better. by completion of a required UL written examination administered by UL Knowledge Services. A DRI for each unique Contractor location may be required as determined by UL. In the event the DRI is no longer employed by the Contractor or is otherwise unable to fulfill the duties of DRI, the Contractor shall carry out the following to remain in the Program: Immediately notify UL. Immediately initiate the Contingency Plan for continued compliance with Program Requirements. Employ or qualify a replacement DRI within 120 days.

What is needed to become Certified What is needed to become Certified? – Step 1 – employ / have employee obtain DRI certificate… Acknowledgement of a Designated Responsible Individual (DRI)- Cont.…. e. To maintain continued certification as the contractor employee or DRI shall: This certificate is valid for a three (3) year period and subject to the rules and conditions of the Program Requirements. - Achieve at least 6 continuing education units (CEUs) for every three years. One (1) CEU credit is equal to 10 contact hours of participation in organized industry related continued education. - Retake the Firestop Exam ***NOTE: The exam can be taken during any of the FCIA Conferences, or On-Line at – For the Basic Exam - - - https://lms.ulknowledgeservices.com/catalog/display.resource.aspx?resourceid=549095 For the Canadian Certification - - - -http://lms.ulknowledgeservices.com/catalog/display.resource.aspx?resourceid=549125

Agenda What is the UL QFCP (Qualified Firestop Contractor Program) What is needed to become Certified? -Step 1 – employ / have employee obtain DRI Certificate - Step 2 - Pass an on-site (office & job-site) audit assessment Application information UL- QFCP Certification Maintenance

What is needed to become Certified What is needed to become Certified? - Step 2 - Pass an on-site (office & job-site) audit assessment 2. The Contractor must pass an Initial Audit Assessment of your Quality Process (this includes verification of your Management System Manual [MS Manual] as well as an On-Site visit, to verify the processes are carried out on the job-site)… A Management System Manual must be created that contains (as a minimum) the following criteria: 1.0 Construction Document Requirements and Review 2.0 Procurement of Firestop Materials 3.0 Storage, Handling, Preservation and Delivery 4.0 Installation, Application and Field Quality Assurance Procedures 5.0 Inspection, Testing and Calibration 6.0 *Control of Nonconforming Firestop Materials and Systems 7.0 Training and Qualification of Staff 8.0 *Corrective/Preventive Action 9.0 Management System Monitoring and Improvement 10.0 *Documentation and Record Keeping

What is needed to become Certified What is needed to become Certified? - Step 2 - Pass an on-site (office & job-site) audit assessment 2. The Contractor must pass an Initial Audit Assessment of your Quality Process (Management System Manual [MS Manual])… Cont. … ***NOTE: The following elements MUST BE DOCUMENTED: - 6.0 *Control of Nonconforming Firestop Materials and Systems - 8.0 *Corrective/Preventive Action - 10.0 *Documentation and Record Keeping An assessment report will be provided to you, within 48 hours of the initial assessment. - If there are any findings, you will have 30 days (from the date of the initial assessment) to respond with your Corrective Action - If there are No Findings – you will receive your final assessment report & your UL Certificate within 48 hours.

What is needed to become Certified What is needed to become Certified? - Step 2 - Pass an on-site (office & job-site) audit assessment 2. The Contractor must pass an Initial Audit Assessment of your Quality Process (Management System Manual [MS Manual])… Cont. … c. You will notice your UL QFCP Certificate is good until December 31st, of the following year.

Agenda What is the UL QFCP (Qualified Firestop Contractor Program) What is needed to become Certified? -Step 1 – employ / have employee obtain DRI Certificate - Step 2 - Pass an on-site (office & job-site) audit assessment Application information UL- QFCP Certification Maintenance

Application information…. 3. You can request an application for the UL QFCP from: a. firesafetyquote@ul.com b. From myself – Pam Blanchette – Operations manager for UL QFCP * NOTE: you will then need to send it to firesafetyquote@ul.com 4. Once you complete the application and send it to UL, you will receive a quote for the Initial assessment. - You will need to “accept” the quote and this will get the ball rolling. NOTE: Many new companies are requested to pay for the initial assessment up-front, prior to the audit. This is only until you have established a good credit line with UL.

Agenda What is the UL QFCP (Qualified Firestop Contractor Program) What is needed to become Certified? -Step 1 – employ / have employee obtain DRI Certificate - Step 2 - Pass an on-site (office & job-site) audit assessment Application information UL- QFCP Certification Maintenance

UL- QFCP Certification Maintenance 5. To Maintain the UL QFCP Certification (for the company)… a. You will need to have an annual assessment audit performed by the UL Auditor some time during the following year. i. The re-audit will include a comprehensive audit of the Contractor’s Management System. The purpose of the re-audit is to determine if the Contractor, their DRI and their Management System remains in compliance to program requirements b. Once you have passed the annual assessment, you will receive a renewed UL – QFCP Certificate, with a new expiration date. c. Your DRI will need to maintain his/her Certificate (as noted in the previous slides.

Certifications List of UL and ULC Qualified Contractors at www.ul.com https://industries.ul.com/blog/firest op-contractor-programs Site contains: Program overview Links to exam dates and sessions Link to FCIA Link to program requirements PDF which can be downloaded Product Spec and Code Resources

QUESTIONS?

THANK YOU! Contact Information: Pamela Blanchette – Operations Manager –UL QFCP Phone: 1-978-973-1567 email: pamela.s.blanchette@ul.com Matt Schumann - Technical Engineering Leader – BLT Phone: 1-847-664-1289 email: matthew.Schumann@ul.com