Lunar Descent Trajectory

Slides:



Advertisements
Similar presentations
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Advertisements

POLICY Space Export Controls Update Since Delivering the 1248 Report to Congress - April 2012 −Congress added language into the FY13 National Defense Authorization.
SATELLITES What They Do and How They Work Michael J. Mackowski Aerospace Engineer October 2013 With Updates from Shawn Shepherd.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Propellant Requirements Attitude Control Thrusters with Low Thrust Orbit Trajectories [Josh Lukasak] [Attitude Group Lead]
AAE450 Spring 2009 LEO Atmospheric Drag Analysis and Lunar Orbit Circularization [Andrew Damon] [Mission Ops] February 19,
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
Project X pedition Spacecraft Senior Design – Spring 2009
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE 450 Spring 2008 Brad Ferris 01/24/08 Trajectory Analyst Modeling Thrust Assistance Provided by Daniel Chua 1.
Week 13 Presentation Thursday, April 9 th, 2009 Saad Tanvir Propulsion Group 1 Lunar Descent – Hybrid Propulsion System Propulsion System Inert Mass Finals.
6.3 Rendezvous Christopher James 3/30/2007 Physics 280 Christopher James 3/30/2007 Physics 280.
Ryan Mayes Duarte Ho Jason Laing Bryan Giglio. Requirements  Overall: Launch 10,000 mt of cargo (including crew vehicle) per year Work with a $5M fixed.
AAE450 Spring 2009 Communications Ground Stations Communication Equipment Alternative Landing Method March 26, 2009 [Trent Muller] [COM]
Spacecraft Trajectories You Can Get There from Here! John F Santarius Lecture 9 Resources from Space NEEP 533/ Geology 533 / Astronomy 533 / EMA 601 University.
1 Weekly Summary Asteroid Sample Return Spring Semester March 5, 2008 Ashley Chipman.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
AAE450 Spring 2009 Slide 1 of 7 Final Presentation Slides Ian Meginnis April 9, 2009 Group Leader - Power Systems Phase Leader - Translunar Injection OTV.
AAE450 Spring 2009 Slide 1 of 8 Final Presentation Back-up Slides Orbital Transfer Vehicle (OTV) Power and Thermal Control Ian Meginnis Ian Meginnis Power.
AAE450 Spring 2009 Preliminary Trans-Lunar Analysis [Levi Brown] [Mission Ops] January 29,
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
PARKINSON-SAT EA 469 Spacecraft Design Joe Campbell Thomas Dendinger Greg Lewis Paul Lwin.
ADCS Review – Attitude Determination Prof. Der-Ming Ma, Ph.D. Dept. of Aerospace Engineering Tamkang University.
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
Eric Weber (1/14)1 Configuration and Structural Design Eric Weber Tasks –Preliminary hardware research –Preliminary transmission research –Materials Research.
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
Newton’s thought experiment: orbital velocity. Surface escape velocities Planet V escape, ft/sec Mercury13,600 Venus33,600 Earth36,700 Moon7,800 Mars16,700.
AAE450 Spring 2009 Landing Site Topography Time in Earth and Moon Shadow During Transfer [Kara Akgulian] [Mission Ops] February 11,
Communications Design Review
Cost Comparison of Higher Parking Orbit Scale up for Arbitrary Payload
Technical Resource Allocations
Development and Principles of Rocketry
[Cory Alban] [Mission Ops] [Locomotion]
[Andrew Damon] [Mission Ops]
Analysis of Rocket Propulsion
Week 6 Presentation Thursday, Feb 19, 2009
Attitude, Lunar Transfer Phase
Three-Body Trajectory Model and Spiral Transfer Matching
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Nicole Bryan Avionics Final Presentation Slides
Lunar Descent Slide Suggestions & Questions
Lunar Descent Analysis
Ideal Operating Time for Minimized Power System
By: Josh Lukasak Attitude Group Lead Lunar Descent Phase Manager
Junichi (Jun) Kanehara 03/06/2008 Trajectory The Winner of the Balloon, 5[kg] case (LB-HA-DA-DA_v125) & New Version of Trajectory 3-D Plots AAE 450 Spring.
Lunar Descent Trajectory
Lunar Descent Trajectory
[Kara Akgulian] [Mission Ops]
Lunar Descent Trajectory Optimization
Week 4 Presentation Thursday, Feb 5, 2009
Communications Rover Penetrators Parabolic Dish Reflector
Final Slides Attitude Control System (ACS) – Lunar Transfer
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Presentation transcript:

Lunar Descent Trajectory February 19th, 2009 [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] Descent Trajectory Steering Program Descent times >1000s, working on better model Gimbaled Engine No savings until arbitrary payload case [John Aitchison] [Mission Ops]

Useful Numbers/Recommendations 1 additional kg on lunar surface ≈ 2.1 kg additional kg in lunar orbit 2000 km circular lunar parking = add 55kg descent prop mass!! Use EP as long as possible Stay above 20 km until final descent Also: Altitude Sensor System Updates [John Aitchison] [Mission Ops]

Assumptions on First Slide Graph 1 110km, 15km orbit; vertical to horizontal burn; constant 2000 N thrust; constant mdot=.67 kg/s Graph 2 Graph 1 assumptions; 315kg wet mass; worst case mountain scenario Graph 3 Added prop to get to 110km circular; instantaneous deltaV; Hohmann transfers [John Aitchison] [Mission Ops]

Updated Lunar Descent Masses System Subsystem Mass (kg) Power   Batteries 20 Solar Panels 2 Communications CPU 0.57 Camcorder 0.38 Receiver 0.2 Transmitter Antenna 0.1 Propulsion Structure 34.1 Propellant 157.7 Attitude Thrusters 7 2.5 Star Sensor 3.2 Rover 31.5 Frame 30.45 Thermal Control 24.7 Total Dry 156.9 Total Wet 314.6 [John Aitchison] [Mission Ops] 4

Landed Mass vs. Prop Mass -Also basis of EOM code [John Aitchison] [Mission Ops]

Landed Mass vs. Prop Mass (cont.) [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] Landed Mass vs. Prop Mass (cont.) [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] Landed Mass vs. Prop Mass (cont.) [John Aitchison] [Mission Ops]

Effects of Non 110km Circ Orbit [John Aitchison] [Mission Ops]

Effects of Non 110km Circ Orbit (cont.) [John Aitchison] [Mission Ops]

Effects of Non 110km Circ Orbit (cont.) [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] Descent EOM’s [John Aitchison] [Mission Ops]