PRESENTATION OF RESULTS IN TESTING OF EQUIPMENT,

Slides:



Advertisements
Similar presentations
Final Project Instructor: Nguyen Anh Tu Students: Tran Tien Tai Tran Tien Tai Tran Ngoc Mai Tran Ngoc Mai Tu Kim Tuan Tu Kim Tuan Nguyen Ngoc Phuong Nguyen.
Advertisements

McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Extended Learning Module D (Office 2007 Version) Decision Analysis.
Debugging in End- User Software Engineering summarized by Andrew Ko Toward Sharing Reasoning to Improve Fault Localization in Spreadsheets Joey Lawrance,
1. 2 Italy: 296 : awarded projects and initiatives in the period 1999 – : average of awarded projects per year in the period 1999 – : National.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
Using Text Effectively in the Biology Classroom
How to organize your mysterious PowerPoint
Whats the Story with the American Obesity Epidemic By the Nutritionists.
Chapter 12: Congress in Action Section 3
Surgery OR Procedure Card Database David L. Odom 1. Secure Password into Database:
Project Analysis Course ( ) Final Project Report Overview.
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
F. Bozza M.C. Cameretti A. Senatore R. Tuccillo Dipartimento di Ingegneria Meccanica per l’Energetica (D.I.M.E.) Università di Napoli “Federico II” Naples,
1 REVIEWER ORIENTATION TO ENHANCED PEER REVIEW April
September 12 1 An Algorithm for: Explaining Algorithms Tomasz Müldner.
SituationGantt Chart Brainstorm:Design Brief Page 1 GCSE Product DesignYour NameCandidate Number.
Deep excavation softwareGeotechnical and foundation engineering Advanced Engineering Services Corso Paratie, Milano 30 settembre 2009 Tutorial 8: Add a.
Improving System Safety through Agent-Supported User/System Interfaces: Effects of Operator Behavior Model Charles SANTONI & Jean-Marc MERCANTINI (LSIS)
6.3 Vectors in the Plane Many quantities in geometry and physics, such as area, time, and temperature, can be represented by a single real number. Other.
By M. Omar Hilale, Ambassador and Permanent Representative of the Kingdom of Morocco Geneva, 15 June
PIONEER SAFETY My Confusion Surrounding NFPA Standards and Rope Rescue Equipment.
Mod 3: Technical References
GCAA Management Workshop Paul C. Atkins, 2/18/09 Paul C. Atkins, 2/18/09.
The PROJECT!!!!. Introduction – Background – Goal of the project.
EG 10111/10112 Introduction to Engineering Copyright © 2009 University of Notre Dame Design optimization: optimization problem and factor of safety (F.O.S.)
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
RESEARCH WRITING. OVERVIEW Before Writing Start Now Outline Execute.
Topics - Reading a Research Article Brief Overview: Purpose and Process of Empirical Research Standard Format of Research Articles Evaluating/Critiquing.
Module 5 Writing the Results and Discussion (Chapter 3 and 4)
INTRODUCTION 1. We will cover: -Focus Of Human Factors -Human Factors Emphasis - Human Factors’ Objectives -Human Factors Approach -Definition 2.
Methods of Psychology Hypothesis: A tentative statement about how or why something happens. e.g. non experienced teachers use corporal punishment more.
ARLINGTON FIRE DEPARTMENT HIGH ANGLE RESCUE PROGRAM.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Personalized QoS-Aware Web Service Recommendation and Visualization.
Engineering Report Department of Civil and Environmental Engineering CEEN 330 – Environmental Field Session.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Overview Coding Practices Balancing standards Configuration Management Providing Change Control Software Estimation Reasons why Programmers and Managers.
EMPRICAL RESEARCH REPORTS
Literature Review and Parts of Proposal
Planning & Writing Laboratory Reports A Brief Review of the Scientific Method.
NA3 DORII: Deployment of Remote Instrumentation Infrastructure Matteo Lanati EUCENTRE (European Centre for Training and Research in.
Magnetic Field Measurement System as Part of a Software Family Jerzy M. Nogiec Joe DiMarco Fermilab.
Description of Work Objectives WP 8 serves to define the technical content of the VI for contact thermometry. It will contain a selection of guides to.
Unit 7: Forces & Motion Brain Gym Goals
1 Introduction to Software Engineering Lecture 1.
A–Level Computing Project Introduction. Learning objectives Become familiar with the: Guidelines associated with choosing a project. Stages in project.
1 st IRF Europe & Central Asia Regional Congress Istanbul, September , 2015 Better Roads. Better World. Presenting Author Arial Bold 20 Position.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
What’s the Story with the American Obesity Epidemic By the Physiologists.
PSY 219 – Academic Writing in Psychology Fall Çağ University Faculty of Arts and Sciences Department of Psychology Inst. Nilay Avcı Week 3.
Technical Rescue Rope Rescue Operator Course
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Object Oriented Programming and Data Abstraction Earl Huff Rowan University.
Assistant Instructor Nian K. Ghafoor Feb Definition of Proposal Proposal is a plan for master’s thesis or doctoral dissertation which provides the.
1 Investigation of buried flexible culvert subjected to rockfall loading - A brief summary of instrumentation and data aquisition from full-scale tests.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
NANCY HARRIS DEPARTMENT OF COMPUTER SCIENCE Captivate Your Students by Providing Instruction When Your They Need It.
Using Human Errors to Inspect SRS
MGT-491 QUANTITATIVE ANALYSIS AND RESEARCH FOR MANAGEMENT
Mechanical Measurement Lab, EDMS no
How to Write MA proposal in Applied Linguistics
Portable Picture Presentation (PPP)
Your title Abstract Introduction: Background/Context Methods
Corpo Nazionale Soccorso Alpino e Speleologico
Chapter Four Engineering Communication
Chapter Four Engineering Communication
Chapter Four Engineering Communication
Mechanics of Materials Engr Lecture 10 Axial Deformation #1
PSS verification and validation
Outline.
Presentation transcript:

PRESENTATION OF RESULTS IN TESTING OF EQUIPMENT, Corpo Nazionale Soccorso Alpino e Speleologico 5th European Cave Rescue Meeting 2011 Starigrad Paklenica, Croatia 15th – 18th September 2011 PRESENTATION OF RESULTS IN TESTING OF EQUIPMENT, TECHNIQUES AND PROCEDURES OF CAVE RESCUE CNSAS - Commissione Tecnica Speleologica

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 What is CTS The Commissione Tecnica Speleologica is a CNSAS committee intended to work on technical subjects Members come from almost regions of Italy Subjects the CTS works on: Design of a new stretcher Design of an helmet for the casualty Real time forces measurement system for rescue maneuver characterization Development of a proprietary wired telephone The Technical Caving Committee is a workgroup of the Italian Alpine and Caving Rescue National Body Design of a new stretcher customized in order to meet the specific needs of a rescue operation measurement of the forces applying to the components of the rescue system during the evacuation operations Development of a proprietary wired telephone communication tools to be used during cave rescue operations C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Subjects new stretcher helmet rescue maneuver characterization wired telephone The Technical Caving Committee is a workgroup of the Italian Alpine and Caving Rescue National Body Design of a new stretcher customized in order to meet the specific needs of a rescue operation measurement of the forces applying to the components of the rescue system during the evacuation operations Development of a proprietary wired telephone communication tools to be used during cave rescue operations C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Rescue maneuver (considerations) Single UIAA equipment is provided with its maximum ratings In a rescue system several equipment interact each other The whole system behavior can hardly be predicted by theoretical thoughts Even if each UIAA equipment is provided with is maximum ratings warranting about their usage in rescue operations we actually miss data about forces in complex systems C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Rescue maneuver testing: why? What’s going to happen, anchor by anchor, during the execution of a rigging maneuver? Strength on each equipment changes instantaneously according to the geometry that changes through the maneuver Some geometries could lead to unexpected loads What about the residual safety margins? What’s going to happen if something breaks? Could some configuration be simplified? No need to re-work on single equipment - test already done by equipment vendors using dedicated testing system C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 An approach C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Requirements A data measurement and recording tool is proposed Portable and on-field operable Simultaneous multiple points acquisition Real time acquisition and analysis Post acquisition data processing Portable and on-field operable (battery powered, low power consumption) C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Portable and on-field operable C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Simultaneous multiple points acquisition C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 System description The data acquisition system is composed by: 12 strain gauge load cells (0 – 3000 kg) 16 bits USB data acquisition card (National Instruments™ DAQ) Laptop Home made software for data recording and post-processing Precision in the range (reasonable ) +/- 10kg (1daN) DAQ: 8 differential pair channels or 16 single ended channels Home made sw for system management and data processing C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

System description: load cells & DAQ Steel made, 3000kg full scale “DAQ box” contains some electronic circuitry to provide regulated voltage supply to Cells 12 electrical cables (4 wires) of different lenghts C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Operating scheme DAQ BOX USB C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

The data acquisition process One load cell mounted on each relevant point (belays, stretcher, pulleys, …) All the strengths measured and saved real time Raw graphics available on the fly Post-processing and data filtering is allowed trough an home-made software developed by CTS Finally some graphics are reported for the highlights Graph ready for deeper analysis – allow to immediately discover issues and than correct/modify the execution of the test Each test is repeated three times in order to discard “errors” during the test executions – like “non ideal” belays release, Finally some graphics are reported to highlight the relevant characteristics of the rigging C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Load cells positioning C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Home-made software C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Graphic of loads C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Data acquisition results The data processing is followed by an in deep analysis: Graphics analysis and annotation Live recorded notes Discussion The results of the investigation are described on a structured technical report We analyze the most representative graphics among all Live recorded notes: we take note of envirenment (rope diameter, brand, level of usage..) C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Technical report Three main sections Introduction: abstract, brief description of the technique and its variants Operating scheme: geometrical data (angles, lengths,..) load cells positions, Data analysis: graphics explanations Conclusions and final discussion Structured Brief description of the technique and of the variants considered Graphics are annotated with phase by phase description C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Graphics analysis and annotation C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 Technical report C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011 State of the art Characterization of the “standard” rigging techniques adopted and deployed within the CNSAS Analysis of faults Analysis of new techniques (collaboration with the SNATSS - Caving Rescue Technician National School) Overview del lavoro fatto (manovre standard descritte sul manuale, poi cedimenti) cts disponibile a collaborazioni – 1 slide C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011

Thanks for your attention BUT… FIRST OF ALL… Thanks for your attention DON’T LET OUR BraIN Overview del lavoro (manovre standard descritte sul manuale, poi cedimenti) cts disponibile a collaborazioni – 1 slide UPSIDE DOWN C.N.S.A.S. Commissione Tecnica Speleologica Paklenica 16 Sept 2011