Junji Urakawa ( for collaborators ) March KEK at LNF

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
1 Update on Ion Studies Guoxing Xia, Eckhard Elsen ILC2007 Workshop, May 30~Jun 2, 2007 DESY, Hamburg.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Wakefield effect in ATF2 Kiyoshi Kubo
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Experiments on Fast Ion Instability at PLS
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Fast Ion Instability Study at DESY
ATF/ATF2 Control System
Status of Fast Ion Instability Studies
CLIC Damping ring beam transfer systems
Oversea collaborators
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Pol. positron generation scheme for ILC
Strip-line Kicker R&D at KEK-ATF
Fast ion instability WP 15
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

Junji Urakawa ( for collaborators ) March 6 2007 KEK at LNF Fast Ion Instability Studies at ATF (Preliminary results and proposal for almost perfect experiment) Junji Urakawa ( for collaborators ) March 6 2007 KEK at LNF 2018/11/28 ILCDR07 at INFN-LNF

Results obtained in 2004 Problems: meas. of vacuum pressure, Unknown gas species, extraction kicker heating 2018/11/28 ILCDR07 at INFN-LNF

Measured beam profile by XSR monitor in normal vacuum condition Single bunch/single train 2×1010 bunch/train Ave: 2×10-7 Pa X : 49.5±2.3 mm Y : 8.1±0.7 mm This profile was appeared on normal beam operation 2018/11/28 ILCDR07 at INFN-LNF

Measured beam profile by XSR monitor in the vacuum condition with north ion pump off Single bunch/single train 2×1010 bunch/train Ave: 2×10-6 Pa (Maybe) X : 46.8±2.9 mm Y : 8.4±0.8 mm We have not found vertical beam size blow-up in this vacuum condition 2018/11/28 ILCDR07 at INFN-LNF Change 3train mode

Measured beam profile by XSR monitor on 3 train mode Vacuum : 1×10-5 Pa profile profile BG BG Sample 1 Sample 2 On a 3 train mode at 2×1010 /bunch, sudden large vertical beam blow-up was appeared. On XSR monitor, measured vertical beam size was not fixed on same sizes. We also see a vertical beam oscillation by turn-by-turn monitor. 2018/11/28 ILCDR07 at INFN-LNF

Measured beam profile by XSR monitor on 3 train mode (2) Vacuum : 2×10-6 Pa profile BG Sample 1 Sample 2 On a 3 train mode at 2×109 /bunch (1/10 reduction than before), vertical beam blow up was also appeared. But this amplitude was reduced on XSR monitor. The measured beam sizes were 32.5±0.9 mm horizontally and 24.7±4.7 mm vertically. After changing single train, we did not find this vertical beam blow-up. 2018/11/28 ILCDR07 at INFN-LNF

Bunch Length Measurement (Synchronized Streak Camera) 2018/11/28 ILCDR07 at INFN-LNF

Laser wire beam size monitor in DR 14.7µm laser wire for X scan 5.7µm for Y scan (whole scan: 15min for X, 6min for Y) 300mW 532nm Solid-state Laser fed into optical cavity Expert had a cold during study. Measurements was cancelled. 2018/11/28 ILCDR07 at INFN-LNF

Summary of Feb. 23 Study We found the vertical beam blow-up at 3 train mode above 2×10-6 Pa between 2×109 and 2×1010 /bunch. We did not find the vertical beam blow-up at single bunch/ single train mode below 2×10-6 Pa. 2018/11/28 ILCDR07 at INFN-LNF

Study in Feb. 28 3 bunches/train injection with 2.8ns bunch spacing Problem : beam loading compensation system could not work. We repair it soon. Total intensity : 2.43x1010 electrons/train No beam blow-up (4.5x10-7 Pa, ~8.76mm) 3 bunches/train, 3train ~19mA, IP off beam blow-up, not clear (4.8x10-6 Pa, ~11.5mm) 2018/11/28 ILCDR07 at INFN-LNF

Summary of Feb. 28 Study 3 bunches/train x 3 train operation, 18mA Storage mode, 6.6x10-5 Pa, beam blow-up IP01 On (3.7x10-6 Pa), IP02 On (3.7x10-6 Pa), IP03 On (2.4x10-6 Pa), beam size gradually reduced. No blow-up IP04 On, IP05 On, IP06 On, IP10 On, IP11 On (1.6~1.5x10-6 Pa) 2018/11/28 ILCDR07 at INFN-LNF

Gas Inlet Chamber : N2 etc. Energy spread monitor Laser wire monitor system X-SR Monitor, Bunch length monitor 2018/11/28 ILCDR07 at INFN-LNF

Good pressure bump From vacuum gauge, we evaluate the Beam sees 24mm pressure distribution precisely. Beam sees 24mm diameter beam pipe with pumping slots. 2018/11/28 ILCDR07 at INFN-LNF

Necessary preparation and overhaul Multi-bunch energy compensation system in ATF Linac (Repair it soon.) Check laser wire 20GHz signal sampling system in DR Tuning for high quality beam injection (beam stability, high current injection more than 70mA/train) 2018/11/28 ILCDR07 at INFN-LNF

Who's Planning What? (An incomplete list…) ANL CI Cornell DESY FNAL IHEP KEK LBNL LNF SLAC kickers  e-cloud impedance X lattice design low-y ions vacuum acceptance RF system RF controls align/support mech.integration instrumentation feedback system wiggler main magnets KNU, PAL X X X 2018/11/28 ILCDR07 at INFN-LNF

ATF R&D Items Demonstration of Fast Kicker Performance with multi-bunch flat beam (No beam extraction, Measurement of Coherent Oscillation precisely), using strip-lines and FID pulse power supplies. ( ongoing ) Design and Installation on extraction fast kicker for ATF2, Specification : bunch-by-bunch extraction for generation of 30 bunches/train or 60 bunches/train. (late 2008 or 2009) Almost perfect experiment for fast ion instability. (2007) Impedance measurement of ATF DR (almost perfect bunch length measurement). (2008) Micro-wave instability study (CSR measurement). (2008) 1pm vertical emittance generation study if possible. (2009) Other miscellaneous R&D (Instrumentation Development). 2018/11/28 ILCDR07 at INFN-LNF

Goals of the experiment (according to Two proposals (L. Wang, T Goals of the experiment (according to Two proposals (L. Wang, T. Raubenhimer and G. Xia, E. Elsen) Distinguish the two ion effects: beam size blow-up and dipole instability. Quantify the beam instability growth time and tune shift. The growth rate is related to the ion density (vacuum pressure, average beam line density, emittance, betatron function and so on). Quantify the bunch train gap effect Provide detailed data to benchmark simulations with experiment. 2018/11/28 ILCDR07 at INFN-LNF

Detailed Experiment plan Measurement of vacuum pressure and the main components of gas species. Effects of pressure and bunch current: With different pressure conditions (2.0x10-5 Pa in pressure bump) by injecting nitrogen gas); With different beam: 1 train, N of bunch =2~20, 5x109~2X1010/bunch Gap effect repeat B with 2 and 3 bunch trains, repeat B with different length of gaps. repeat above with a different emittance (emittance ratio :changed by skew quads from 0.5% to 10%.) 2018/11/28 ILCDR07 at INFN-LNF

Announcement for efficient collaboration ATF Web is involving and making international data communication page. Welcome to the ATF International Collaboration Announcements 4th Joint meeting of TB and SGCs on May 28-29 at Daresbury Call for new R&D proposals at ATF New system for KEK dormitory reservation KEK users office prepared the online system for user support. It will be activated on March 1st for the dormitory reservations from April 1st. Please read announcements by Users Office. (English) (Japanese) What's new? 1 March 2007 - XTF has been cleared for ATF2 construction Next pictures show the ATF2 area before moving(left) and after moving(center and right) the X-band test station. Floor refurbishment will be start on June after moving Crab-cavity items. Yellow line shows the boundary of floor refurbishment(left side). 2018/11/28 ILCDR07 at INFN-LNF

http://atf.kek.jp/collab/ Studies about the Fast Ion Instability This is a starting point for data sharing within the collaboration of the fast-ion R&D program. It is just started. Therefore we have no tools converting the internal data format into your environment at present. Raw data are distributed in some computers at ATF because of the developments of monitors are done by several groups. Each beam-monitor system has their own format on the different operating system, 8, 16, 32 or 64 bits. It is very difficult to gather them in a server at present. Your help or work to establish the data sharing tools for near future is necessary. Anyway, we will keep to upload the results for your works. Nobuhiro Terunuma, March 1st, 2007. Data and Summary Logging into the ATF web system is required. If you have no account on the ATF web system, please visit the user registration page . 2007/Feb/28 2007/Feb/23 2018/11/28 ILCDR07 at INFN-LNF