Transmission Workgroup – 1st December 2011

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Supply Point Enquiry Service
Transmission Workstream February 2009
Proposer: Matthew Hatch Panel Date: 20/10/16
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
Transmission Workstream 4th July 2007
UNC Trader User – Licence obligations
Proposer: National Grid NTS Panel Date: 17th April 2014
Review of System Alerts
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Annual Review - Methodology Statements
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Development of Firm Monitor & GBA
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Rebecca Hailes For 15 March 2018
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Transmission Workgroup 6th March 2014
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Flow Swaps at NTS / LDZ offtakes
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
Proposals to be Reviewed
Transmission Workstream – Partial Assignment
Transmission Workstream 1st September 2005
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Proposer: Debbie Brace Panel Date: 20th March 2014
Review Group 0334 User Pays update – Modifications 288, 289, 290.
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
Transmission Workstream 1st February 2007
Assignment of NTS Entry Capacity – Work currently being Undertaken
Transmission Workstream, 1 Mar 07
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Presentation transcript:

Transmission Workgroup – 1st December 2011 Removing the restriction on the Users’ application quantity for Annual NTS Exit (Flat) Capacity Transmission Workgroup – 1st December 2011 Transmission Work stream 2 December 2010

Background Modification 0290 (implemented July 2010) Facilitated the release of Annual NTS Exit (Flat) Capacity in excess of the unsold levels at National Grid NTS's discretion. UNC (ref B Annex B-1 3.1 f ii) states that the amount of a capacity application for Annual NTS Exit (Flat) Capacity may not be "greater than the Remaining Available NTS Exit (Flat) Capacity”. Restricts the quantity of Annual NTS Exit (Flat) Capacity which Users can individually apply for. Could limit the quantity of discretionary Annual NTS Exit (Flat) Capacity released to the market. Does not reflect the intent of Modification Proposal 0290. For the July 2011 Annual Application Window Users were advised that National Grid NTS would not apply the above UNC provision.

Solution Raise a Mod proposal to remove aforementioned provision from UNC:

Proposed Approach Mod proposal Modification proposal to be submitted to the December ‘11 Modification Panel Aim is to have a permanent resolution in place prior to the July 2012 Annual Application Window. Options: Proceed directly to consultation? Refer to [one] workgroup to complete workgroup report? Considered CtM but change to UNC would be more than cosmetic (i.e removal of a paragraph), CtM normally used for more cosmetic changes.