Lunar Descent Slide Suggestions & Questions

Slides:



Advertisements
Similar presentations
Mission Analysis STK 8.0 Analysis and Impact Accuracy Stephen Lee.
Advertisements

Lunar Landing GN&C and Trajectory Design Go For Lunar Landing: From Terminal Descent to Touchdown Conference Panel 4: GN&C Ron Sostaric / NASA JSC March.
Институт прикладной математики им. М.В.Келдыша РАН Keldysh Institute of Applied Mathematics, Russian Academy of Sciences.
Lessons from Apollo * Data from NASA Apollo 11 Press Kit Shows spacecraft weight delivered to LEO (Low Earth Orbit) Shows weights for each portion of Apollo.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Arbitrary Payload Cost Optimization to LLO Tasks: Payload Cost / Mass Optimization (Launch to LLO) Disprove Momentum Transfer Alternative.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Lunar Lander Propulsion System 100g, 10kg and Large Payload cases Thaddaeus Halsmer Thursday, April 9, Lunar Lander propulsion.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Analysis Cold Xe Gas Thrusters [Brian Erson] [Attitude] 1.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Project X pedition Final slides outline for Orbital Transfer Vehicle Propulsion Week 11 Presentation Thursday, March 26, 2009 Brad Appel.
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
Project X pedition Spacecraft Senior Design – Spring 2009
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
Week 13 Presentation Thursday, April 9 th, 2009 Saad Tanvir Propulsion Group 1 Lunar Descent – Hybrid Propulsion System Propulsion System Inert Mass Finals.
Panel 5: Simulations and Training Go for Lunar Landing: From Terminal Descent to Touchdown March 5, Tempe, AZ Henry Hoeh Northrop Grumman Corporation.
AAE 450 Spring 2008 Allen Guzik January 31, 2008 Trajectory Airplane Launch Trajectory Code and ΔV Drag Comparison Trajectory Optimization 1/5.
1 Ames Research Center Karl Bilimoria 5 March 2008 Lunar Lander Handling Qualities – Terminal Descent to Touchdown Dr. Karl Bilimoria NASA Ames Research.
Mass Estimations for Tami RCS: 4kg each * 24 engines = 96 kg Parachutes: Supersonic = 136 kg Subsonic = 595 kg Retro Engine: 135 kg (OMS) Propellants:
Oh, Thank Heaven for 7-Eleven: Fueling Up in Space with In-Situ Resource Utilization ASTE-527 Final Presentation Riley Garrett.
Advanced Space Exploration LEO Propellant Depot: Space Transportation Impedance Matching Space Access 2010 April 8-10, 2010 Dallas Bienhoff Manager, In-Space.
AAE450 Spring 2009 Slide 1 of 8 Final Presentation Back-up Slides Orbital Transfer Vehicle (OTV) Power and Thermal Control Ian Meginnis Ian Meginnis Power.
Introduction to the Altair Project
AAE450 Spring 2009 Lunar Lander Power Systems Thursday March 12 th Adham Fakhry Power Group Lunar Lander Descent Night Thermal.
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Lunar Lander Propulsion System 100 g, 10 kg and Arbitrary payload cases Thaddaeus Halsmer Thursday, March 12, Propulsion System.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
National Aeronautics and Space Administration Ares Project Joel Best / EO10 November 6, 2006 Ares Project Joel Best / EO10 November 6, 2006.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
Hopper Spacecraft Simulator. The “Hopping” Concept -Land on a celestial body using engines, conduct surface operations, then re-ignite engines and ‘hop’
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
Cost Comparison of Higher Parking Orbit Scale up for Arbitrary Payload
Viking Program Owen Keupp Period 9.
[Cory Alban] [Mission Ops] [Locomotion]
Week 6 Presentation Thursday, Feb 19, 2009
Attitude, Lunar Transfer Phase
Three-Body Trajectory Model and Spiral Transfer Matching
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Lunar Lander Propulsion System
Ares I System Requirements Review (SRR)
Lunar Descent Trajectory
Lunar Descent Analysis
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
By: Josh Lukasak Attitude Group Lead Lunar Descent Phase Manager
Final Presentation Slides
Junichi (Jun) Kanehara 03/06/2008 Trajectory The Winner of the Balloon, 5[kg] case (LB-HA-DA-DA_v125) & New Version of Trajectory 3-D Plots AAE 450 Spring.
Lunar Descent Trajectory
Lunar Descent Trajectory
Solomon Westerman Week3 1/29/09
[Kara Akgulian] [Mission Ops]
Introduction to the Altair Project
Lunar Descent Trajectory Optimization
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Final Slides Attitude Control System (ACS) – Lunar Transfer
Ian Meginnis January 29, 2009 Group Leader - Power Systems
Presentation transcript:

Lunar Descent Slide Suggestions & Questions John Aitchison March 26th, 2009 [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] 100g Descent Action Time (s) Thrust (N) Radial Burn 0 - 176.2 1150 Rotation 176.2 - 181.3 115 Vertical Burn 181.3 - 196.4 Coast Landing 196.4 - 205.2 131 More detailed action list? Depict points where “Action” changes? 3-D/Landing Site? [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] 3-D 3 or 4 slides: 3-D overview, 2-D descent trajectory, hop/hover trajectory slide, final slide depicting overview of lander structure and masses on the lunar surface [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] 10kg Descent Trajectory Action Time (s) Thrust (N) Radial Burn 0 - 177.9 1650 Rotation 177.9 - 183.8 165 Vertical Burn 183.8 - 199.3 Coast Landing 199.3 - 208.1 196 [John Aitchison] [Mission Ops]

Arbitrary Descent Trajectory Action Time (s) Thrust (N) Radial Burn 0 - 169.9 34500 Rotation 169.9 - 174.8 3450 Vertical Burn 174.8 - 188.8 Coast Landing 188.8 – 193.1 3890 [John Aitchison] [Mission Ops]

[John Aitchison] [Mission Ops] Backup Slides [John Aitchison] [Mission Ops] 6

[John Aitchison] [Mission Ops] 100g Descent Propellant Propellant Mass (kg) De-Orbit Attitude Propellant Needed 0.36 1150N Burn Propellant Used 70.12 115N "Coast" Propellant Used 0.19 Descent Propellant Used 70.3 Descent Propellant Left 0.2 Attitude Descent Propellant Used 3.15 Attitude Descent Propellant Left 0.06 Contingency Propellant 1.83 Unusable Propellant 2.27 [John Aitchison] [Mission Ops] 7

100g Overview from Integrated Code Item Mass (kg) Propellant Mass in LLO 78.16 Inert Mass in LLO 78.59 Mass in LLO 156.76 Mass on Lunar Surface 82.95 [John Aitchison] [Mission Ops] 8

[John Aitchison] [Mission Ops] 10 kg Descent Propellant Propellant Mass (kg) De-Orbit Attitude Propellant Needed 0.5 1650N Burn Propellant Used 101.71 165N "Coast" Propellant Used 0.31 Descent Propellant Used 102.02 Descent Propellant Left 0.28 Attitude Descent Propellant Used 4.57 Attitude Descent Propellant Left 0.06 Contingency Propellant 1.58 Unusable Propellant 3.52 [John Aitchison] [Mission Ops] 9

10kg Overview from Integrated Code Item Mass (kg) Propellant Mass in LLO 121.22 Inert Mass in LLO 106.63 Mass in LLO 227.85 Mass on Lunar Surface (before hop) 120.76 Mass on Lunar Surface (after hop) 112.13 [John Aitchison] [Mission Ops]

Arbitrary Descent Propellant Mass (kg) De-Orbit Attitude Propellant Needed 9.46 34500N Burn Propellant Used 2022.49 3450N "Coast" Propellant Used 5.42 Descent Propellant Used 2027.91 Descent Propellant Left 0.49 Attitude Descent Propellant Used 90.76 Attitude Descent Propellant Left 0.54 Contingency Propellant 10.99 Unusable Propellant 66.34 [John Aitchison] [Mission Ops]

Arbitrary Overview from Integrated Code Item Mass (kg) Propellant Mass in LLO 2286.09 Inert Mass in LLO 2258.89 Mass in LLO 4544.98 Mass on Lunar Surface 2338.37 [John Aitchison] [Mission Ops]