Inefficient Building Issues Lighting Water HVAC Aging Equipment Emergency funding needed for repairs & Deferred Maintenance. Spare parts expensive.

Slides:



Advertisements
Similar presentations
© 2006 San Diego Gas and Electric. All copyright and trademark rights reserved. How to fund your Virtualization Project SDG&E 2007 Energy Efficiency Program.
Advertisements

Energy Performance Contracts Chip Barnes. What is an EPC? Popular way to obtain infrastructure energy efficiency & operational improvements with: Popular.
STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Starting an ESC Chapter in Your State. Energy Services Coalition Mission To promote the benefits of, provide education on, and serve as an advocate for.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
1 | Energy Efficiency and Renewable Energyeere.energy.gov Alternative Finance & Mitigating Deferred Maintenance May 21, 2013 Kurmit Rockwell PE, CEM, LEED.
COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2013 WORKSHOP.
Best Value Pre-selection and Procurement
House Bill 1031 (HB 1031) Dyslexia Therapy Law Update Special Education Directors Statewide Meeting January 31, 2013 Trecina Green, Associate Superintendent.
General Administration Energy Program 2010 Energy Savings Performance Contracting.
Massachusetts Department of Elementary & Secondary Education
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Slide 1 Are your Buildings Managing You? 2007 IASBO Conference May 16, 2007 Mike Steffens, Ameresco Jerry Brendel, Superintendent, Woodridge SD #68 Wendy.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
ENERGY PERFORMANCE CONTRACTS Field Office Staff Training November 17, 2010 Tedd T. Termunde, P.A Joseph E. Nemedi, F.A.
Energy Savings Performance Contracting Presenters Name Energy Services Coalition
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
PERFORMANCE CONTRACTING. WHY PERFORMANCE CONTRACTING? PERFORMANCE CONTRACTING ALLOWS YOU TO GREEN/UPGRADE YOUR FACILITIES AND PAY FOR THE UPGRADES WITH.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Energy Conservation & Performance Contracting
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Genesis Solar Module Brochure ™
OSFMA Conference 2003 April 9, 2003 Are You Asking the Hard Questions about Performance Contracting? OSFMA Conference 2003.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Big Ten Sustainability Conference November 14-15, 2010 Funding Strategies: Energy Savings Projects and Seed Grants Funding Strategies.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
The Essential Energy Savings Performance Contracting Program Design South Carolina ESC November 29, 2012 Presented by: Jim Ploger.
Confidential and Proprietary | © 2012 Cenergistic This material may not be copied, modified, distributed or disclosed except upon written approval from.
WASBO FALL CONFERENCE 2015 CAREY BRADLEY, CONSULTANT BOB SOLDNER, DIRECTOR DPI SCHOOL FINANCIAL SERVICES TEAM Energy Efficiency Exemption: Use, Rules and.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Energy Project M&V: Reports that Add Value October 27, 2015.
E NERGY P ERFORMANCE C ONTRACTING : Financing Energy Performance Improvement Projects Patricia Gómez PE, CEM, LEED AP Office of Sustainability Miami-Dade.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Ashlie Lancaster SC Energy Office November 29, 2012 SC Performance Contracting Initiative: Program Development and Implementation - Next Steps.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Green Communities Grant Program Town of Lincoln March 8, 2010 icfi.com © 2006 ICF International. All rights reserved.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
A Road Map to Energy Savings: Elements of a Comprehensive Energy Plan Presented by: Kenny Esser, Senior Associate June 18, 2014 Passaic County Division.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Energy Performance Contracting (EPC)
GUARANTEED ENERGY SAVINGS CONTRACTS
Fort Stanwix National Monument Energy Audit Contract
EDENTON-CHOWAN SCHOOLS
Energy Savings Performance Contracts & Energy Service Companies
Guaranteed Energy Savings Performance Contracting
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Colorado Department of Public Health and Environment April, 18, 2008
FUNDING FOR ENERGY UPGRADES
Developing and Issuing the RFP
EPAD-Louisville 101 EPAD-Louisville 101 Making Cent$ of Energy
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Save While You Save Greening Schools through Performance Contracting
Westmoreland Intermediate Unit
23rd Annual NM Infrastructure Conference Improve infrastructure using Self-funding Using Lease Purchase: Public-Private partnership Agreements.
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

Inefficient Building Issues Lighting Water HVAC Aging Equipment Emergency funding needed for repairs & Deferred Maintenance. Spare parts expensive Budget Funds reducing Costs going up Maintenance cost increasing Spare parts cost increasing Energy cost going up.

Replace the old Equipment Put Cost Avoidance in place Building Automation High efficiency HVAC High efficiency Lighting Increase building envelope efficiencies. Water conservation Renewable Energies Reduce Maintenance Increase Comfort levels

1. Provide a Self-Funded solution for an Energy and operational savings Project. –The Cost Avoidance dollars will actually PAY for the Project. 2. Provides additional funding to Leverage the energy project. –The Cost Avoidance dollars, Leveraging the budget dollars present to increase the Project Scope. –The Scope can be increased on the project with the additional Cost Avoidance dollars.

ESCO- Energy Services Company An ESCO is a commercial business that provides and arranges financing for a broad range of comprehensive energy and operational savings solutions, including energy audits, design, and implementation, training, commissioning, measurement and verification.

Example Actual Project: Self - Funded Project w/ Positive Cash flow Project Cost Avoidance (12 year term) 12 year Total Cost $7,611, year Total Savings $8,011,190 Positive $400,164 Actual Cash Flow over life of the project

1993 Sep 2011 PC Path Set for NM Developing Pilot Programs House Bill 603 July 2009 PC Legislation PC Enabling Legislation Passed in NM PC Projects Completed Thru 2004

Selection of ESCO Audit the Facility Verify the savings Implement ECMs EMNRD Contact : Brian Johnson (505) EMNRD Contact : Michael McDiarmid (505) Finance The Project

Agency contacts EMNRD Agency gathers data on the facilities to Support RFP Process Issue RFP for Investment Grade Audit & Project Proposal to ESCOs Provide Walk thru and opportunity for questions for the ESCOs Enter Data in Energy Star Portfolio Manager to reference in the RFP Building Sq. Footage Building Utilities Data for 12 months Building Age And History Building Issues Asbestos, Etc.. Building Address Or Location Agency Selects short List of ESCOs for final Interviews Agency Awards Contract Agency Selects ESCO EMNRD Approves ESCO

The start point is for the Agency to contact EMNRD NM Energy Minerals and Natural Resources Department. (EMNRD) An Agency is a School, Higher Ed, Municipality, County or State agency.

EMNRD is available to assist the agency with developing a Request for Proposal (RFP) to ESCOs thru a bidding process. EMNRD has sample RFP documents to use. The Agency will need to compile the following info for the RFP Document: Building age and history with environmental issues (Asbestos, etc.) Square footage of each building on the RFP. At least 12 months of utility data for each building. Building name, locations and addresses.

The Agency will Request Bid responses from ESCOs for the RFP. The Agency will provide a Pre Bid Walk thru for the ESCOs to walk the site(s) and ask questions.

The Agency Selects the ESCO through Agency procurement EMNRD Certifies the ESCO. The ESCO is a Qualified Provider for this project only. The Contract is awarded to the ESCO only After EMNRD Approval.

EMNRD will provide a Model IGA Contract to Agency EMNRD Reviews and certifies the completed IGA and Project Proposal from the ESCO. Financing by ESCO provided thru a competitive process ESCO Provides the IGA with Project Proposal. NOTE: Agency must have funding for IGA Costs Utility Cost savings must meet or exceed cost of the project Upon Approval From EMNRD the Project Proposal then moves to the Agency for approvals. Process for Schools Process for Municipalities Counties, High Ed and State

EMNRD will Provide a Sample Investment Grade Audit (IGA) Document for the Agency to submit to the ESCO. The Agency must have funding for the IGA cost in the event that they decide not to move forward with the project. (DONT WORRY!) The ESCO will provide the Audit per the IGA Document. The ESCO will Identify & list ECMs (Energy Conservation Measures) EMNRD will oversee the competitive financing process for the Final Proposal that will be turned in with the IGA.

The ESCO Completes the Investment Grade Audit which includes: A shovel ready Project Proposal Financing Guaranteed terms Guaranteed Scope The EMNRD Reviews and approves the proposal

EMNRD will Provide a Sample Investment Grade Audit (IGA) Document The Path after EMNRD Approval. Determined by Agency

Superintendent and School Board gives approvals School District budgets for the succeeding fiscal year are approved during the regular legislative session PED compiles a list of school districts proposed projects, including information on annual payments and guaranteed savings. Once this Special Fund has been set up and funded, the Implementation can begin in the succeeding fiscal year. The Annual Performance Contract amount will be removed from the Schools SEG (School Equalization Guarantee) Account and placed into a Public School Utility Conservation Fund to fund the Performance Contract with. Next, PED notifies the Legislative Finance Committee of the proposed projects, during budget hearings preceding the regular legislative session.

The Contract is presented for approvals of the Governing Council, Commission or agency head. Once the Governing Council or Commission has approved the contract a Special Fund is set up for the sole purpose of paying the Performance Contract Costs. Special Fund Appropriated from Operating Budget to Pay for the Performance Contract. Once this Special Fund has been set up and funded, Implementation can begin.

The Performance Period for the Contracts begins at customer approval and sign off of project completion. The Project does not have change orders unless there are changes that the customer requires. The Project with All Energy Conservation Measures (ECMs) is ready to start Implementation The ESCO is responsible for Managing the Project. Providing Training, Ensuring the Design and development of the project

The Project must have a Measurement and Verification (M&V) program to track and verify the savings of the performance Guarantee. The ESCO can also be responsible for O&M if required for the project.

For Information on Performance Contracting, Go to: Select Link: Clean Energy Performance Financing

Q: How Long can you finance an EPC Project? A: Up to 25 years, depending on the equipment Life expectancy. Q: What types of Projects qualify for an EPC Project? A: Almost all retrofits projects that save energy. See ( Item B of the Statutes) Q: Who provides Financing for an EPC Project? A: The ESCO provides the financing as part of the EPC Project.

Renewable Energy for Schools Michael Cecchini Director of Business Development

Benefits of Renewable Energy for Schools Energy Cost Savings – Operating Budget Reduced Peak Demand Charges Clean Energy Curriculum Opportunity

Ways for Schools to Implement a Solar Project CES Procurement Design/Build/Own – GO Bond Funding Power Purchase Agreement – Third Party Funded & Owned Performance Contract – Incorporate Solar in with other Energy Conservation Measures (ECMs) with a Guaranteed Savings Agreement which will self fund the project.

Installation Options for Schools

Parking Lot Shade Structures

Using New Mexicos Energy Performance Contracting Law Brian Johnson ESC Public Co-Chair Facility Managers Training Workshop October 31, /31/2012New Mexico Energy, Minerals and Natural Resources Department 36

Basic Features of the Law schools, state agencies, municipalities, universities energy savings are guaranteed up to 25-year term allowed all types of efficiency & renewable measures EMNRD oversight: –Qualified Provider certification –Energy savings are accurate and reasonable 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 37

New Mexicos Energy Performance Contracting Law Where can I get help? The Public-Private Partnership How do I get started? ESCO Selection Your Future: Projecting Utility Costs vs. Financing Costs The Guarantee: How Schools are Protected 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 38

Where can I get help? The Public-Private Partnership EMNRD – Energy Services Coalition – Schools: PED, PSFA 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 39

Clean Energy Performance Financing Model documents: –Request for Proposals (RFP) –Energy Audit Contract –Guaranteed Utility Savings Contract 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 40

School Capital Project Resources Public School Facilities Authority Bob Gorrell, Director Public Education Department Antonio Ortiz, Director, Capital Outlay Bureau /31/2012New Mexico Energy, Minerals and Natural Resources Department 41

Energy Services Coalition Brian Johnson, Public Sector Co-Chair Boone Birdsell, Private Sector Co-Chair /31/2012New Mexico Energy, Minerals and Natural Resources Department 42

How do I get started? Contacted by an ESCO or heard from EMNRD about Energy Performance Contracting? Contact EMNRD OK for ESCO to offer school unsolicited proposal, but… Want ESCO hired competitively Deemed Qualified Provider by EMNRD 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 43

Competitive Selection Stand-alone RFP Federal GSA ( Schedule 03FAC; Category ) Statewide Price Agreement (2013) 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 44

10/31/2012New Mexico Energy, Minerals and Natural Resources Department 45

10/31/2012New Mexico Energy, Minerals and Natural Resources Department 46

Your Future Utility Costs vs. Financing Costs Electricity prices are trending up Natural gas is trending down…future volatility? Propane is expensive 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 47

10/31/2012New Mexico Energy, Minerals and Natural Resources Department 48

The Guarantee How Schools are Protected We want energy $$$ savings Guarantee is for energy BTU savings Baseline-to-current-year energy comparison Baseline adjustments needed Utility bill accounting vs. avoided energy costs Model documents –strong language for savings calculations and measurement & verification plan –Need to enforce 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 49

Sample Contract Language Proposed Energy and Water Savings Calculations and Methodology Provide detail description of analysis methodology used. Describe any data manipulation or analysis that was conducted prior to applying savings calculations. Detail all assumptions and sources of data, including all stipulated values used in calculations. Include equations and technical details of all calculations made. (Use appendix and electronic format as necessary.) Include description of data format (headings, units, etc.). Details of any savings or baseline adjustments that may be required. Detail energy and water rates used to calculate cost savings. Provide post-acceptance performance period energy and water rate adjustment factors. 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 50

Baseline Adjustments… … shall only be made for any of the following changes in conditions affecting the facility: utility rates number of days in the utility billing cycle floor area operational schedule facility temperature weather amount of equipment or lighting used in the facility space types in the facility material changes to the facility. 10/31/2012New Mexico Energy, Minerals and Natural Resources Department 51