Texas Panhandle Synchronous Condenser Solution

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
COPENHAGEN – KEY TO CLIMATE INVESTING
1 st ASEAN – EU Business Summit (AEBS) Infrastructure Sector Sandiaga S. Uno Founding Partner of Saratoga Capital ASEAN EU Business Summit 2011 Jakarta,
APPA CEO Roundtable Phoenix, AZ March 15, 2011
INVESTMENTS IN POWER SECTOR
Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Public Policy Drivers and Other Trends in Renewable Energy IPED Managing Your Energy Portfolio in a Greener World Presented by:Mon-Fen Hong La Capra Associates,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
The Midwest ISO from a Transmission Owner Perspective.
Carbon Dioxide Emissions Costs and Electricity Resource Planning New Mexico Public Regulation Commission Case No UT March 28, 2007 Presented.
DG Energy and Transport, European Commission Fabrizio Barbaso 16/04/2008 EU ENERGY SECURITY STRATEGIES ARF Energy Security Seminar EUROPEAN COMMISSION.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Vision for the internal electricity market
August 31- September 1, 2011 Rio de Janeiro, Brazil
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
Community Wind Development
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Recent and upcoming energy policy initiatives
1 1 Dominion: New Directions in Energy. 2 2 About Dominion: Diverse Generation Mix Dominion Virginia Power.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Jenny Wright Product Manager, Green Power Switch Tennessee Valley Authority.
EE 369 POWER SYSTEM ANALYSIS
An Impact Analysis of Electrifying Florida’s Public Buses
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
Houston Region Import Capacity Project Planning for Reliable Power.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
ObjectWin Confidential ObjectWin Corporate Presentation.
Europe's priorities Our goals Why a 2030 framework now?
Steve Baker President Natural Gas in Ontarios Energy Mix Seeing The Bigger Picture.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
First Solar FuelSmart™: Powering Energy Security
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
The Landscape of Solar Industry in China 1. 2 Landscape of Solar Industry in China  8 IPO’s since 2005,100+ solar fab’s built  In 2009, volume of polysilicon.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Existing Electricity Universal Service in China Yang Kun, Chief Engineer State Electricity Regulatory Commission of China (SERC) Quebec City, May 15, 2012.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Managing Trees for Energy Andrew Clark (Fuel Quality & Compliance Manager) Energy Made Better.
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI Maximization Strategy at Duke Energy Tim Murphy IT Manager.
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
System Strength Discussion
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
US Priorities for New and Renewable Energy Technologies Cary Bloyd Argonne National Laboratory APEC Expert Group on New and Renewable Energy Technologies.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Topics  Renewable Energy  Electricity prices and retail competition  TXU Acquisition  Legislative Session.
CIPCO Central Iowa Power Cooperative Iowa Industrial Energy Group April 9, 2013.
2015 Mace Advocacy alliance policy conference
ERCOT Independent Review
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Long Term Study Transmission Results May 21 st, 2013.
Panhandle Renewable Energy Zone (PREZ) Study
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Affordable & Available: Large Scale Clean Energy for New England
Presentation transcript:

Texas Panhandle Synchronous Condenser Solution Presented to ERCOT Regional Planning Group April 22, 2014

Outline DATC Introduction Problem Description DATC Proposal DATC Advantages

Duke-American Transmission Company (DATC) DATC is a 50/50 joint venture, formed in April 2011 to pursue transmission development on a national scale Founded on a vision of transmission as the key to efficient power markets Committed to developing projects that deliver a strong portfolio of reliability, economic and public policy benefits Publically announced projects and assets: DATC Midwest Portfolio – new transmission line projects in Iowa, Wisconsin, Illinois, Indiana and Ohio Zephyr Power Transmission – planned 500 kV HVDC transmission line from Wyoming to California Path 15 – DATC owns 72 percent of the transmission service rights the 500 kV transmission line in central California Strategic focus on ERCOT, Texas and SPP as areas of high potential Interest in pursuing a variety of platforms for transmission development including partnerships, greenfield, and acquisitions

Overview of Duke Energy Corporation (NYSE: DUK) Headquartered in Charlotte, NC 150+ years of service ~ 30,000 employees $50 Billion market cap 57,200 MW of generating capacity 85% regulated franchise utilities and 15% commercial enterprises

Infrastructure Development Duke Energy Regulated and Non-Regulated Operations Mix Commercial Businesses Franchise Electric & Gas Midwest Generation Ohio generation (~4,000 MW) Midwest gas-fired generation (~3,600 MW) Solar 50MW Wind – 1,900 MW Infrastructure Development Commercial Transmission Wind Solar Guatemala 283 MW El Salvador 296 MW Fuel Type Natural Gas Hydro Wind Coal / Oil Solar Ecuador 162 MW Peru 825 MW Brazil 2,113 MW DEI Latin American assets National Methanol Argentina 523 MW

Duke Energy Texas Presence Offices in Houston and Austin Over 100 employees in Texas 950 MW operating generation Sweetwater Windpower Project, Nolan County 283 MW 2003 (2007) Ocotillo Windpower Project, Howard County 59 MW (2008) Notrees Windpower Project, Ector & Winkler Counties 153 MW (2009) Blue Wing Solar Power Project, San Antonio 14 MW (2010) Notrees Battery Storage Project, Winkler County 36 MW (2012) Los Vientos I Windpower Project, Willacy County 200 MW (2012) Los Vientos II Windpower Project, Willacy County 202 MW (2012) Wind Solar Battery Office

Overview of American Transmission Company First multi-state stand alone transmission utility in U.S. Formed in 2001 Privately held with diverse ownership made up of investor- owned utilities, municipalities and cooperatives Tremendous growth since formation Over $3.3B in assets in 2012 Largest transmission owner in MISO

ATC Municipalities, IOUs, and Co-ops ATC has 29 owners, including several cooperatives

PREZ Problem Statement Original CREZ plan called for ~5.5 GW of capacity in Panhandle, but reactive support equipment initially installed for ~2.4 GW. Panhandle transmission, remote from ERCOT load and synchronous generation, is stability constrained. Panhandle Renewable Energy Zone (PREZ) study has determined additional transmission upgrades are required to support generation located in the panhandle when GI queue reaches 3,000 MW financial commitment. PREZ study (phase 1) recommends additional transmission and 200 MVAR of reactive support be installed initially (1,650 MVAR ultimately) in the panhandle area in the form of synchronous condensers1 due to their superior inertia and fault current characteristics. 1 Synchronous Condensers are generators that operate like a motor to supply inertial response, reactive support, and frequency response - synchronized with the grid, requiring no fuel, and produce zero emissions.

PREZ Upgrade Requirements Synchronous condensers located at Windmill and Ogallala stations in all 3 PREZ planning scenarios Synchronous condensers and linear upgrades required concurrently

PREZ Upgrade Plan

DATC Solution Project Phoenix is the DATC response to ERCOT’s identified need for reactive support in the Texas panhandle to facilitate wind generation interconnection currently in the queue with confirmed financial commitment to build. DATC proposes to install repowered generators from the Duke fleet operated as Synchronous Condensers at Windmill Substation and/or other ERCOT locations to supply the needed reactive power. DATC is eligible to offer and own this solution to ERCOT under ERCOT Nodal Protocol 3.11.2 (3) which states, “ERCOT shall attempt to meet these reliability criteria as economically as possible and shall actively identify economic projects to meet this goal.” If endorsed by ERCOT, a PUCT CCN application will follow.

Duke Preferred Synchronous Condenser Inventory Unit Manufacturer MVA Capability MVAR Capability Retirement 1 Westinghouse 192 155 / -116 March 2014 2 GE 288 205 / -125 May 2015 3 512 379 / -256 4 105 103 / -76 April 2016 5 145 115 / -67 6 7 156 144 / -94 8* 496 320 / -250 October 2013 9* 128 101 / -59 April 2013 10* 297 250 / -130 September 2012 11* 150 100 / -65 April 2012 12* 160 110 / -80 October 2012 * Recently rewound

DATC Proposal Proposal Units to be Repowered Capability MVAR Cost A DATC is also amenable to collaborating with ERCOT on ERCOT’s preference of available Duke units. Proposal Units to be Repowered Capability MVAR Cost A #10 #12 Total 250 / -130 110 / -80 360 / -210 $39M B #8 320 / -250 570 / -380 $41M

DATC Solution Advantages DATC provides a cost advantage over all other incumbent providers due to full depreciation ($0 book value) of Duke generators to be repowered. Anticipate 20-30% savings over new Synchronous Condenser equipment. Duke retired generator inventory is immediately available providing a time advantage over new equipment long lead time delivery. DATC Proposal B can satisfy PREZ Phase 2 reactive reinforcement requirements at Windmill thereby avoiding approximately $88M additional cost. DATC Synchronous Condenser solution is “repeatable” at other ERCOT locations requiring reactive support.

Duke / ATC Strengths Applicable To the TX Panhandle Large fleet of retired and soon to be retired units and spare parts inventory History of operating generation and transmission providing a unique skill set in ERCOT when considering synchronous condensers as transmission assets Supply chain economies of scale Expert in planning, designing, and constructing transmission lines, substations, generating plants, and related infrastructure History of reliable interconnection and operations in the ERCOT system History of meeting stakeholder expectations

Contact Information www.datcllc.com Jeff Peterson 713-375-0709 jeff.peterson@duke-energy.com Bob Burner 704-382-6889 g.burner@duke-energy.com Mark Bruce 512-810-1516 mark.bruce@stratusenergy.com