The Ten Principles of Material Handling

Slides:



Advertisements
Similar presentations
14 Supply Chain Management
Advertisements

Lean Manufacturing.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Logistics & Channel Management
5/3/2015 IENG 471 Facilities Planning 1 IENG Lecture 14 Material Handling.
Logistic Management Warehousing
Supply Chain Management Group 8 Amanda Williams Chris Lemley Ian Carr Clay Garrison Alvaro Suarez.
Supply Chain Management
Location Strategy and Layout Strategy
Chapter 3 - Product Design & Process Selection
INDUSTRIAL & SYSTEMS ENGINEERING
Warehousing Decisions
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
Copyright Cengage Learning 2013 All Rights Reserved 1 Chapter 14: Supply Chain Management Introduction to Designed & Prepared by Laura Rush B-books, Ltd.
GREENING SUPPLY CHAIN IN RETAIL SECTOR
Dr. Muzaffer Kapanoğlu - Decision Support Systems © 2003 MATERIAL HANDLING (Textbook Chapter 5)
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
Retail Marketing Mix and Planning Charles Blankson, Ph.D.
Manufacturing Engineering Department Lecture 1 - Introduction
Product Development. Major Topics The product portfolio of a company concretizes its mission A description of the product selection and development process.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
Designing Goods and Services and Process Selection
Layout Strategy.
Transportation Infrastructure
From Research Prototype to Production
Learning Goals Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact.
Supply Chain Management
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 16 Global Logistics and Materials Management.
Inventory/Purchasing Questions
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
Distribution Customer Services and Logistics
Logistics McGraw-Hill/Irwin
CHAPTER 4: Procurement.
Course of MT- 362 Material Handling Lecture # 1. Course Outline.
Designing Goods and Services and Process Selection Chapter 3.
Course of MT- 362 Material Handling Lecture # 3.
1 Copyright ©2009 by Cengage Learning Inc. All rights reserved Designed by Eric Brengle B-books, Ltd. CHAPTER 14 Prepared by Amit Shah Frostburg State.
Chapter 13 Logistics and Channel Management. Logistics13 Objective 1: L ogistics Planning, implementing, and controlling the physical flows of materials.
Designing Goods and Services and Process Selection
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Product Development. Product Selection and Development Stages Figure 5.4, pg. 138.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
L – 5 Distribution Channel - Warehousing and Inventory Management.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Logistics. 英语班级: 08 级 1B6 专业:物流管理 组员: 温凯靖 王蒙露 叶雯雯 马昀 王晓 林.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
Chapter 13 Logistics and Channel Management.
INTRO TO SAP EWM.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
ME Spring 2015 Systems Engineering, Part II
Common Learning Blocks
Common Learning Blocks
Common Learning Blocks
The University of Jordan Mechatronics Engineering Department
Warehousing Decisions
Facility Planning Systematics Process
Facilities Planning and Design Course code:
Supply Chain Process ISCOM/ 374.
Chapter 13 Logistics and Channel Management.
Presentation transcript:

The Ten Principles of Material Handling The Key to Greater Productivity, Customer Service and Profitability

PLANNING PRINCIPLE All material handling should be the result of a deliberate plan where the needs, performance objectives and functional specification of the proposed methods are completely defined at the outset.

PLANNING PRINCIPLE Definition: A plan is a prescribed course of action that is defined in advance of implementation. In its simplest form a material handing plan defines the material (what) and the moves (when and where); together they define the method (how and who).

PLANNING PRINCIPLE Key Points The plan should be developed in consultation between the planner(s) and all who will use and benefit from the equipment to be employed. Success in planning large scale material handling projects generally requires a team approach involving suppliers, consultants when appropriate, and end user specialists from management, engineering, computer and information systems, finance and operations. The material handling plan should reflect the strategic objectives of the organization as well as the more immediate needs.

PLANNING PRINCIPLE KEY POINTS The material handling plan should reflect the strategic objectives of the organization as well as the more immediate needs. The plan should document existing methods and problems, physical and economic constraints, and future requirements and goals.

PLANNING PRINCIPLE KEY POINTS The plan should promote concurrent engineering of product, process design, process layout, and material handling methods, as opposed to independent and sequential design practices.

STANDARDIZATION PRINCIPLE Material handling methods, equipment, controls and software should be standardized within the limits of achieving overall performance objectives and without sacrificing needed flexibility , modularity and throughput.

STANDARDIZATION PRINCIPLE Definition: Standardization means less variety and customization in the methods and equipment employed.

STANDARDIZATION PRINCIPLE Key Points The planner should select methods and equipment that can perform a variety of tasks under a variety of operating conditions and in anticipation of changing future requirements. Standardization applies to sizes of containers and other load forming components as well as operating procedures and equipment.

STANDARDIZATION PRINCIPLE Key Points Standardization, flexibility and modularity must not be incompatible

WORK PRINCIPLE Material handling work should be minimized without sacrificing productivity or the level of service required of the operation.

WORK PRINCIPLE Definition: The measure of work is material handling flow (volume, weight or count per unit of time) multiplied by the distance moved.

WORK PRINCIPLE Key Points Simplifying processes by reducing, combining, shortening or eliminating unnecessary moves will reduce work. Consider each pickup and set-down, or placing material in and out of storage, as distinct moves and components of the distance moved.

WORK PRINCIPLE Key Points Process methods, operation sequences and process/equipment layouts should be prepared that support the work minimization objective. Where possible, gravity should be used to move materials or to assist in their movement while respecting consideration of safety and the potential for product damage.

WORK PRINCIPLE Key Points The shortest distance between two points is a straight line.

ERGONOMIC PRINCIPLE Human capabilities and limitations must be recognized and respected in the design of material handling tasks and equipment to ensure safe and effective operations.

ERGONOMIC PRINCIPLE Definition: Ergonomics is the science that seeks to adapt work or working conditions to suit the abilities of the worker.

ERGONOMIC PRINCIPLE Key Points Equipment should be selected that eliminates repetitive and strenuous manual labor and which effectively interacts with human operators and users. The ergonomic principle embraces both physical and mental tasks. The material handling workplace and the equipment employed to assist in that work must be designed so they are safe for people.

UNIT LOAD PRINCIPLE Unit loads shall be appropriately sized and configured in a way which achieves the material flow and inventory objectives at each stage in the supply chain.

UNIT LOAD PRINCIPLE Definition: A unit load is one that can be stored or moved as a single entity at one time, such as a pallet, container or tote, regardless of the number of individual items that make up the load.

UNIT LOAD PRINCIPLE Key Points Less effort and work is required to collect and move many individual items as a single load than to move many items one at a time. Load size and composition may change as material and product moves through stages of manufacturing and the resulting distribution channels. Large unit loads are common both pre and post manufacturing in the form of raw materials and finished goods.

UNIT LOAD PRINCIPLE Key Points During manufacturing, smaller unit loads, including as few as one item, yield less in-process inventory and shorter item throughput times. Smaller unit loads are consistent with manufacturing strategies that embrace operating objectives such as flexibility, continuous flow and just-in-time delivery.

UNIT LOAD PRINCIPLE Key Points Unit loads composed of a mix of different items are consistent with just-in-time and/or customized supply strategies so long as item selectivity is not compromised.

SPACE UTILIZATION Effective and efficient use must be made of all available space.

SPACE UTILIZATION Definition: Space in material handling is three dimensional and therefore is counted as cubic space.

SPACE UTILIZATION Key Points In work areas, cluttered and unorganized spaces and blocked aisles should be eliminated. In storage areas, the objective of maximizing storage density must be balanced against accessibility and selectivity. When transporting loads within a facility the use of overhead space should be considered as an option.

SYSTEM PRINCIPLE Material movement and storage activities should be fully integrated to form a coordinated, operational system which spans receiving, inspection, storage, production, assembly, packaging, unitizing, order selection, shipping, transportation and the handling of returns.

SYSTEM PRINCIPLE Definition: A system is a collection of interacting and/or interdependent entities that form a unified whole.

SYSTEM PRINCIPLE Key Points Systems integration should encompass the entire supply chain including reverse logistics. It should include suppliers, manufacturers, distributors and customers. Inventory levels should be minimized at all stages of production and distribution while respecting considerations of process variability and customer service.

SYSTEM PRINCIPLE Key Points Information flow and physical material flow should be integrated and treated as concurrent activities. Methods should be provided for easily identifying materials and products, for determining their location and status within facilities and within the supply chain and for controlling their movement.

SYSTEM PRINCIPLE Key Points Customer requirements and expectations regarding quantity, quality, and on-time delivery should be met without exception.

AUTOMATION PRINCIPLE Material handling operations should be mechanized and/or automated where feasible to improve operational efficiency, increase responsiveness, improve consistency and predictability, decrease operating costs and to eliminate repetitive or potentially unsafe manual labor.

AUTOMATION PRINCIPLE Definition: Automation is a technology concerned with the application of electro-mechanical devices, electronics and computer-based systems to operate and control production and service activities. It suggests the linking of multiple mechanical operations to create a system that can be controlled by programmed instructions.

AUTOMATION PRINCIPLE Key Points Pre-existing processes and methods should be simplified and/or re-engineered before any efforts at installing mechanized or automated systems. Computerized material handling systems should be considered where appropriate for effective integration of material flow and information management.

AUTOMATION PRINCIPLE Key Points All items expected to be handled automatically must have features that accommodate mechanized and automated handling. Treat all interface issues as critical to successful automation, including equipment to equipment, equipment to load, equipment to operator, and control communications.

ENVIRONMENTAL PRINCIPLE Environmental impact and energy consumption should be considered as criteria when designing or selecting alternative equipment and material handling systems.

ENVIRONMENTAL PRINCIPLE Definition: Environmental consciousness stems from a desire not to waste natural resources and to predict and eliminate the possible negative effects of our daily actions on the environment.

ENVIRONMENTAL PRINCIPLE Key Points Containers, pallets and other products used to form and protect unit loads should be designed for reusability when possible and/or biodegradability as appropriate. Systems design should accommodate the handling of spent dunnage, empty containers and other by-products of material handling.

ENVIRONMENTAL PRINCIPLE Key Points Materials specified as hazardous have special needs with regard to spill protection, combustibility and other risks.

LIFE CYCLE COST PRINCIPLE A thorough economic analysis should account for the entire life cycle of all material handling equipment and resulting systems.

LIFE CYCLE COST PRINCIPLE Definition: Life cycle costs include all cash flows that will occur between the time the first dollar is spent to plan or procure a new piece of equipment, or to put in place a new method, until that method and/or equipment is totally replaced.

LIFE CYCLE PRINCIPLE Key Points Life cycle costs include capital investment, installation, setup and equipment programming, training, system testing and acceptance, operating (labor, utilities, etc.), maintenance and repair, reuse value, and ultimate disposal. A plan for preventive and predictive maintenance should be prepared for the equipment, and the estimated cost of maintenance and spare parts should be included in the economic analysis.

LIFE CYCLE PRINCIPLE Key Points A long-range plan for replacement of the equipment when it becomes obsolete should be prepared. Although measurable cost is a primary factor, it is certainly not the only factor in selecting among alternatives. Other factors of a strategic nature to the organization and which form the basis for competition in the market place should be considered and quantified whenever possible.