City of Roundup, Montana

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Georgia Solar Energy Association (GSEA) Jason Bodwell Senior Program Manager GEFA March 20, 2014.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
2 Water and Waste Loans and Grants United States Department of Agriculture??? Rural Development: Mandate to improve the quality of life in Rural America.
Rural Development Underwriting Program Consulting Engineers Training June, 2012.
WEDA Winter Conference January 11, Community Programs Funding FY 2010 WEPCF Direct Loan $7,148,000$1,820,000 Grant 2,429,000 97,000 Guaranteed.
December 4, 2014 Macon, Georgia Georgia Mountains Regional Commission.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
CE HYDRAULICS ENGINEERING
1402 Hybrid Firefighter I 6 th Edition Chapter 14 Water Supply.
Connecticut Department of Energy and Environmental Protection.
Learning Objective 1 Explain the ways water supply system components are used by firefighters.
Bob Schneider & Kelly Green Michigan Department of Environmental Quality Revolving Loan Section.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Money Talks: Stretching Precious Dollars Drinking Water State Revolving Fund December 11, 2013.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Methods of Documenting Need and Proposed Solutions 2015 CDBG Applicants’ Workshop December 3-5, 2014.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
City of San Luis, Arizona Rapid Assessment Process Project Strategic Plan City of San Luis Water & Wastewater Improvements Yuma County, Arizona Presented.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
City of LaFayette CDBG Public Hearing March 9, 2015.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Rapid Assessment Process Project Strategic Plan Village of Columbus Water Supply and System Improvements Luna County, New Mexico Presented to: Stakeholders.
Renewable Resource Grant & Loan Program Montana Department of Natural Resources and Conservation.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Potential Sources of Financial Assistance to Connect to the New Sewer PRESENTED BY SHERYL FLORES AND ALMA AGUILAR 11/5/2015.
Department of Environmental Quality Water Infrastructure November 17, 2015 Water Infrastructure Funding to Financing.
CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL.
GEFA Loan Programs CDBG Applicants Workshop Michael Roberts Program Manager Water Resources Division December 4, 2015.
Methods of Documenting Need and Proposed Solutions 2016 CDBG Applicants’ Workshop December 2-4, 2015.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
Water / Wastewater Planning Grants Search Pre- Development Pop 2,500 10,000 MHI $38,205 $38,205 Match 0% 25% Grant $30,000 $25,000 3% of our annual.
Clean Water State Revolving Fund (CWSRF) Engineering Planning Grant Program.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
WATER SYSTEM WORKSHOP February 27, 2012
USDA Rural Development Program Overview Brian Queen Community & Economic Development Specialist.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Lecture (11): Water Distribution Systems
McLean County Regional Water Consolidation Project
DORSET Water System Information Meeting
City of Sisters, OR 2017 Water & Sewer Rate Study
PRESENTED BY DEPARTMENT OF UTILITIES
City of Roundup, Montana
Joshua Basin Water District Draft Findings & Rate Scenarios
Joshua Basin Water District Revised Rate Recommendations
Working with local, state, and national partners to provide resources and technical assistance to aid rural communities in shaping their visions for economic.
Department of Environmental Quality
Water Quality Improvement Projects and Engineering Planning Grant
FEE INCREASES Public Work Shop June 2, 2018.
Working with local, state, and national partners to provide resources and technical assistance to aid rural communities in shaping their visions for economic.
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
[OUR CITY NAME]’S OLD SEWERS
WATER DEPARTMENT BUDGET WORKSHOP
Fixing Our City’s Old Sewers
Presenter: Stacey Ferguson
Dollars and Cents: Ways to Save and be More Resourceful
Working with local, state, and national partners to provide resources and technical assistance to aid rural communities in shaping their visions for economic.
Presentation transcript:

City of Roundup, Montana Water System PER Public Hearing March 6, 2018

Water System Study Preliminary Engineering Report (PER) Examines Comprehensive Needs for: Growth/Capacity Water Supply Water Quality/Treatment Water Storage Distribution System Water Meters Required to Apply for Grant and Loan Funding

Water Supply Current: Two Wells south of the River Wells: Capacity of 1,000 gpm each Depth of 90 feet Infiltration Gallery Bypassed and used as a Backup source Water Quantity is sufficient to meet current and projected demands.

Water Quality Water Quality Although there are no health violations, the water is high in sulfate, TDS, iron and manganese: TDS = 580% Iron = 480% Manganese = 680% Sulfate = 620% Potential Health and Safety Risks Long term exposure to iron is harmful Hemochromotosis risks Lead from cast iron mains

Water Storage Storage Tank provides Domestic and Fire Flow Storage 2,000,000 Gallons, 1,990,000 required Tank is well maintained and has no structural issues Tank is cleaned every 7 years. Next cleaning is scheduled for 2018 in the CIP.

Distribution System Main Condition: Main size varies from 4” to 12”, pipe types vary from cast iron, AC and PVC Cast iron mains are in poor condition 4” mains not able to provide adequate fire flow Rust has limited capacity down to a 2” main. Leak repair rate of cast iron mains is 4 times higher than normal.

Fire Flow

Distribution System Condition of Valves: Hydrants: Water Loss Many valves are in-operable Valves required on every block Isolating mains is difficult Hydrants: Not adequately spaced to meet fire protection requirements Many need replacement Water Loss Average = 24% (Standard is 10%)

Leaks

Cast Iron Mains-2010

Mains Replaced

Main Replacement Progress 2010 Estimated 45,680 feet of cast iron mains (8.65 miles) 2018 (After all Phase 4) Estimated 19,200 feet of cast iron mains remaining (3.64 miles) 58.2% Completed after Phase 4

Summary of Needs/Alternative Development Distribution System Improvements Keep going on cast iron mains Alternative Development Three alternatives identified

Alternatives Considered In Detail Distribution System Alternatives: D-2: Replace all cast iron mains and AC mains in the highway with 8” PVC mains. D-3: Alternative D-2 plus replace three blocks of 4” PVC D-4: Alternative D-3 plus the remaining 4” AC mains that are limiting fire flows.

Decision Matrix & Weighing Factors Weighting Factors Life Cycle Costs = 10 Operation and Maintenance = 7 Permitting Issues = 5 Social Impacts = 7 Environmental Impacts = 5 Sustainability = 4 Land Acquisition = 5 Public Health and Safety = 10

Preferred Alternative Decision Matrix Preferred Alternative Alternative D-3: Replace all cast iron mains, plus three blocks of 4” PVC main.

Estimated Costs for Improvements

Remaining Water Main Replacements (Red)

Phase 5 Estimated Costs

Phase 5 Schedules

Potential Grant Funding & Target Rates Information On Target Rate Calculation Target rates based on median household income (MHI) as determined from the 2017 Income Survey Water = $33.30 Sewer = $21.40 Existing Rates (average resident) Water = $40.78* Sewer = $29.66 Rates will be 129% of Target Rate

Grant/Loan Eligibility Treasure State Endowment Program (TSEP) - $500,000 to $750,000 (Phases 1, 2 and 3) 50-50 match (cannot exceed 50% of project costs) User rate must meet or exceed target rate Roundup = 129% of water rate = $625,000 grant Will be highly competitive this year Department of Natural Resources and Conservation Renewable Resource Grant and Loan Program (DNRC- RRGL) - $125,000 (Phases 1 and 2) Conserve, manage, develop, or protect renewable resources With fixing of water main leaks, this project presents a strong case for water conservation

Grant/Loan Eligibility CDBG– Community Development Block Grants Grants up to $450,000 25% match required > 50% Low to Moderate Income (LMI) (Income Survey) Very competitive Roundup LMI = 60.0% Used on Phases 3 and 4

Grant/Loan Eligibility Coal Board No limit-but funding is scarce Water Projects are eligible Coal Board has funded a lot of recent projects in Roundup Used on Phases 1, 3 and 4 with Special Circumstances

Grant/Loan Eligibility Rural Development – No limit but is part of grant/loan combination Priority given to communities with population < 5,500 Amount based upon MHI: MHI < $47,757 up to 45% of project costs grant eligible MHI < $38,205 up to 75% of project costs grant eligible Current Loan Rate = 2.75% over 40 years ($4.25 per EDU per $1M) Roundup population qualifies (1,788 < 5,500)

Grant/Loan Eligibility Montana SRF Loan– Offers Loan Forgiveness Loan Forgiveness Up to $500,000 Current Loan Rates = 2.50% over 20 or 30 years Used on Phases 2 and 3 Could be used as a back-up source of funding (20 years = $6.50 per $1M borrowed) (30 years = $4.85 per $1M borrowed)

Phase 5 Funding Plan TSEP Grant $ 625,000 DNRC Grant $ 125,000 CDBG Grant $ 450,000 City Matching Funds $ 300,000 SRF Forgiveness $ 472,000 SRF/RD Loan $ 473,000 Total: $2,445,000 If any grant applications are unsuccessful, project can be downsized or a new SRF or RD loan obtained.

Project Schedule Schedule is dependent on funding strategy: TSEP Funds available in July, 2019 DNRC/RRGL Funds available in July, 2019 CDBG Funds available by early 2020 SRF Available at Anytime Design = 4 Months DEQ Review = 2 Months Bidding = 1 Month Construction = Up to 4 Months, Completed in Fall, 2020

Questions and/or Comments?