OFFICE OF SCIENCE Kurt W. Fisher Review Committee Chair Office of Science, U.S. Department of Energy 1 Closeout Report.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Closeout.
Advertisements

OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
OFFICE OF SCIENCE Review Committee of Critical Decision 1 for the Accelerator Project for Upgrade of the LHC (APUL) at Brookhaven National Laboratory January.
DOE Office of Science Budget Overview
Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.
OFFICE OF SCIENCE Review Committee for the NuMi Off-Axis Neutrino Appearance (NO A) Experiment at the Fermi National Accelerator Laboratory August 9, 2011.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE Kin Chao, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review Committee.
OFFICE OF SCIENCE Review Committee for the LHC ATLAS Detector Upgrade Project Brookhaven National Laboratory (review conducted at Fermi National Accelerator.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
OFFICE OF SCIENCE Review of Critical Decision 1 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
OFFICE OF SCIENCE Review of Critical Decision 2 /3a for the Large Liquid Argon Detector for Neutrino Physics (MicroBooNE) at Fermi National Accelerator.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
FACULTY MEETING September 26, 2008 Marty Wood Assistant Dean for Undergraduate Education Chair, SOE Curricula & Courses Committee.
OFFICE OF SCIENCE Review Committee for the NuMi Off-Axis Neutrino Appearance (NO A) Experiment at the Fermi National Accelerator Laboratory August 9, 2011.
U.S. Department of Energy Project Management: Communicating Progress – Celebrating Success Paul Bosco, PE, PMP, CFM, LEED-AP Director, Office of Procurement.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE Review Committee (CD-1) for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory October 30-November.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Closeout.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
OFFICE OF SCIENCE Review Committee for the LHC CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 26-27, 2013 Kurt Fisher Review.
OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
OFFICE OF SCIENCE Review Committee for the Muon to Electron Conversion (Mu2e) Experiment Project Fermilab June 5-7, 2012 Daniel R. Lehman Review Committee.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Closeout Report on the Review Committee (CD-1) for the Long Baseline Neutrino Experiment (LBNE) Project at Fermi National Accelerator Laboratory October.
OFFICE OF SCIENCE Review Committee for the NuMi Off-Axis Neutrino Appearance (NO A) Experiment at the Fermi National Accelerator Laboratory May 8, 2012.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Anthony Indelicato DOE-Princeton Site Office October 2013 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
Office of Baseline Change Proposal (BCP) Approval or Brief Presented by: Draft version Jun 16, 2015.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
LCLS II FNAL Niobium Pre- Procurement Review - Overview Camille M. Ginsburg, FNAL April 17, 2014.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
OFFICE OF SCIENCE DOE/SC CD-2/3b Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory February 4,
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
1 DOE Independent Project Review Critical Decision-3a Long-Baseline Neutrino Facility/ Deep Underground Neutrino Experiment (LBNF/DUNE) Project DOE Executive.
OFFICE OF SCIENCE CD-1 Review for the LHC ATLAS Detector Upgrade Project Brookhaven National Laboratory (review conducted at Fermi National Accelerator.
LCLS Linac Technical Design Review Charge
Preparations for a Lehman Review
PULSE Building Renovation
Details supporting the increase
Department Of Energy Review Linac Coherent Light Source Project
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

OFFICE OF SCIENCE Kurt W. Fisher Review Committee Chair Office of Science, U.S. Department of Energy 1 Closeout Report on the Review Committee for the Muon g-2 Project Fermi National Accelerator Laboratory September 18, 2013

OFFICE OF SCIENCE 2.1 Beamline R. Gerig, ANL* / SC Does the conceptual design satisfy the performance requirements? 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations

OFFICE OF SCIENCE Storage Ring M. Ross, SLAC* / SC-2 1.Does the conceptual design satisfy the performance requirements? 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations

OFFICE OF SCIENCE Detectors W. Wisniewski, SLAC* / SC-3 1.Does the conceptual design satisfy the performance requirements? 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations

OFFICE OF SCIENCE 5 1.Does the conceptual design satisfy the performance requirements? 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations 2.4 Engineering K. Fouts, SLAC* / SC-4

OFFICE OF SCIENCE 6 2.Do the conceptual design report and documentation appropriately support the stated cost range and project duration? 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations 3. Cost and Schedule E. Merrill, DOE/SC* / SC-5

OFFICE OF SCIENCE 7 PROJECT STATUS Project TypeMIE / Line Item / Cooperative Agreement CD-1Planned:Actual: CD-2Planned:Actual: CD-3Planned:Actual: CD-4Planned:Actual: TPC Percent CompletePlanned: _____%Actual: _____% TPC Cost to Date TPC Committed to Date TPC TEC Contingency Cost (w/Mgmt Reserve)$_____% to go Contingency Schedule on CD-4b______months_____% CPI Cumulative SPI Cumulative 3. Cost and Schedule E. Merrill, DOE/SC* / SC-5

OFFICE OF SCIENCE 8 3.Does the proposed project team have appropriate management experience, design skills, and Laboratory support to produce a credible technical, cost and schedule baseline? 4.Are ES&H aspects being properly addressed and are future plans sufficient given the projects current stage of development? 5.Is the documentation required by DOE, satisfying Order 413.3B, ready for approval of CD-1? Findings Comments Recommendations 4. Project Management D. Green, Retired FNAL* / SC6