Check Run nbseuileventtempchiptrigger 2260008180K5V3-42,2k Test run (geometry10-7,9 cm) 2260018180K5V3-46,6k Beam align (geometri 8,5-7,9 cm) 22600281,8.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Master Budget and Responsibility Accounting
Copyright © 2013 Elsevier Inc. All rights reserved.
Addition and Subtraction Equations
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
MCQ Chapter 07.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
Midterm Review Part II Midterm Review Part II 40.
Before Between After.
 Find the difference between the two numbers on the red boxes.  If the difference of the red boxes matches the blue box say “deal” f not, it’s “no.
Figure 1. Oil Field Exporting to Pipeline (Data Type P) [36] Injected Water [34] Produced Water [35] Produced Water to Sea [1] Oil Production [4] Associated.
Subtraction: Adding UP
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
Lesson Menu Five-Minute Check (over Lesson 5–6) Main Idea and Vocabulary Example 1:Find the Part Example 2:Find the Percent Example 3:Find the Whole Concept.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Select a time to count down from the clock above
Doubling and Halving. CATEGORY 1 Doubling and Halving with basic facts.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Geometry—Ch. 11 Review 1) A line which intersects a circle in two points is called a ________________. 2) A segment which has one endpoint at the center.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

check Run nbseuileventtempchiptrigger K5V3-42,2k Test run (geometry10-7,9 cm) K5V3-46,6k Beam align (geometri 8,5-7,9 cm) ,8 M5V3-47,7kCenter on chip ,1 M5V3-47,6kCentrer betwwen 3& K5V3-41,2k Reference Plane set at 7V (before 5V) Back to sur chip K5V3-41,6k ,8 M5V3-41,3k X M5V3-45,6k Crash after 118 acq on 2919 X k5V3-45,7k Crash after 48 acq on k5V3-48k k5V3-47,6k DUT180k5V3-48k X DUT180k5V3-48k Crash after 73 acq on DUT PL6 180k5V3-41,2kFan power supply separeted X DUT180k5V3-41,2k Crash after 139 acq on k5V3-42,2k X DUT180k5V3-42,2k Crash after 38 acq on k5V3-42,2k

Run nbseuileventTempchiptrigger ,8 M 10V 3-42,2k k3-42,2k k3-42k ANGLE 28° k3-42k DUT 720k3-42k K3-42k k5V3-42,3k ANGLE 28° k3-42,4k ,8 M5V3-42kANGLE 36° ,5 M5V3-41,6k Center between 3& k5V3-41,6k k5V3-41,6k k5V5-61,6kCenter between 5 & k5V5-61,6k K5V k5V5-62,1kThreshold too low Acquisition in not multitreading mode

Run nbseuileventtempchiptrigger k5V5-62,1kThreshold too low ,5360k5V5-62,2k k5V5-62k k5V5-62,5 k40° k10V5-61,6k40° k5V1-2/2-31kCENTRE ENTRE 1& k5V1-2/2-31k k5V1-2/2-31K k5V1-2/2-31K ,8 M5V1-2/2-31k k5V1-2/2-31kPossible overflow k5V1-2/2-31k k5V1-2/2-31k k5V1-2/2-31k

Run nbseuileventtempchiptrigger k 5V1-2/2-31k Centré sur chip k 5V1-2/2-31k k 5V1-2/2-31K ,8 M 5V1-2/2-31K k 5V1-2/2-31k 36° k 5V1-2/2-31k k 5V1-2/2-31k k 5V1-2/2-31K k 10V1-2/2-31k 36° k 10V1-2/2-31k k 10V1-2/2-31K k5V5-61K Centré sur chip k5V5-61k k5V5-61K k5V5-61k k5V5-61K k5V5-61k

Run nbseuileventtempchiptrigger V3-41,2kGRAND ANGLE 60° SUR CHIP4 Sur semelle isolante V3-41,2k V3-41,2k k5V3-41,2k GRAND ANGLE 60° ENTRE CHIP3-4 Sur semelle isolante k5V3-41,2k k5V3-41,2k k5V3-41,2k k5V3-41,2k k5V3-41,2k M10V3-41,3k GRAND ANGLE 60° ENTRE CHIP3-4 Sur semelle isolante k10V3-41,3k k10V3-41,3k k10V3-41,3k

check runSeuileventtempchiptrigger X mV1M (480k) 5V3-4Initial Condition (1217/2500) X mV1M (240k) 5V3-4Vclp readjust (620/2500) X mV1M (620k) 5V3-4 (1563/2500) X mV1M5V3-4File too big (/) X mV160k (23k) 5V3-4 (58/400) X mV100k (~80k) 5V3-4Run with beam in EUDET3 (203/268) X mV100k (85k) 5V3-4Threshold on chip 3 readjust (213/250) mV100k5V3-4Threshold on chip 3 readjust X mV180k (110k) 5V3-4 (283/450) mV360k5V3-4 X DUT180k (26k) 5V3-4 (67/450) X DUT160k (79k) 5V3-4 (198/400) X DUT100k (12k) 5V3-4 (30/250) Noise RUN

check runSeuilEventtempchiptrigger mV500k10V mV500k10V mV180k5V mV180k5V mV180k5V mV180k5V mV180k5V mV40k5V ,5 mV40k5V mV180k10V mV180k5V mV180k5V mV180k5V k5V3-4 SEMELLE PLASTIQUE ET READJUSTEMENT OKF3_3 GRAND ANGLE k5V k10V3-4 SEMELLE PLASTIQUE ET READJUSTEMENT OKF3_3 GRAND ANGLE k10V3-4 Noise RUN