The Fermi National Accelerator Laboratory is a U. S

Slides:



Advertisements
Similar presentations
Conduct of Operations – Operations Aspects of Unique Processes Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
Concept & architecture of the machine protection systems for FCC
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
CRYOGENICS AND POWERING
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
March 2011Particle and Nuclear Physics,1 Experimental tools accelerators particle interactions with matter detectors.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Proposals of high efficiency accelerator components from AAA Green-ILC WG H. Hayano, KEK
University of Palestine software engineering department Testing of Software Systems Testing throughout the software life cycle instructor: Tasneem.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
F Project X Overview Dave McGinnis October 12, 2007.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
I & C.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Anatomy of Accelerators Marty Peters Summer 2006.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Fermilab’s TRAC Summer Experience Joshua Louis Naperville District 203.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Makara, Aug. 17, Cryo Dept. Shutdown Status.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
SRF Operating Experience at JLab
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Machine operation and daily maintenance management in SOLEIL
IT-4189 Supply and installation of a cryogenic distribution system
Minimum Hardware Commissioning – Disclaimer
Project X: Cryogenic Segmentation Issues
The LHC - Status Is COLD Is almost fully commissioned
CRYOGENICS – strategy, unavailability root causes and limitations
Cryogenic Risk Assessment in LHC
CLIC-ILC BDS & MDI work.
The Refrigeration Cycle (Air Conditioners)
Mathew C. Wright October 2016
Machine Protection Xu Hongliang.
Mathew C. Wright January 26, 2009
Reorganizations, Program Changes and Reduced Funding
LHC Beam Operations Past, Present and Future
Cryogenics – The Basics
Operation of Target Safety System (TSS)
Review of hardware commissioning
Presentation transcript:

Experience with Cryogenic Operations During the Fermilab Collider Program The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory, operated under DOE contract by Fermi Research Alliance (LLC), a joint partnership of the University of Chicago and the Universities Research Association (URA).

Stanley R. Johson - Fermilab - WAO 2012 Topics to Cover History of the Tevatron and the Fermilab Collider Program Overview of the Cryogenics Systems at Fermilab Responsibilities for Cryogenic System Operations How the Cryogenics affected Operations Lessons learned during the last decade of collider operations Questions 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

History of the Tevatron and the Fermilab Collider Program 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 The Tevatron History First large scale superconducting accelerator Construction started in the early 1980s First beam in 1983 Anti-Proton Source construction also happened at the same time First Proton / Anti-Proton Collisions in 1985 First Collider engineering run in 1988 (1 year) Split time between fix-target and collider running, with the last decade being exclusively collider. Turned off October 2011 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 The Tevatron Numbers 4 miles in circumference (6.4 km ) ~775 magnets (This number changed over time as the machine was modified) Split into 6 sectors RF, Injection, Extraction, and Detectors were installed between the sectors Each sector was further sub-divided into 4 houses. This also matched the cryogenic system. 24 houses total 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

View of the Tevatron Tunnel 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Overview of the Cryogenic Systems at Fermilab Largest in the world when built Named a International Historic Mechanical Landmark in 1993 Accelerator cryogenics has it’s own support department. Separate experimental cryogenics support. Cryogenics support included engineering, technical, and operational support. 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Cryogenic Numbers Cryogenic system uses liquid helium with a liquid nitrogen shield to cool the magnets 4.4K to 4.6K at the magnet coils One large central helium liquefier 24 satellite refrigerators around the machine 6 locations with either 4 or 8 helium compressors Other cryogenic equipment in the accelerators also supported 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Cryogenic Theory in 1 minute 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Responsibilities for Cryogenic System Operations The Cryogenics Support Group is responsible for: Operating the Central Helium Liquefier, which is manned around the clock Engineering support for any modifications Cryogenics inventory Technical support and maintenance of the satellite refrigerators and helium compressors On Call operational support to the Main Control Room 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Central Helium Liquefier 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Operations Group support for cryogenics Operate and monitor the Tevatron Cryogenics systems. Done with support from the Cryogenics group Monitor system to insure parameters are in operational tolerance Recover the machine from a magnet quench (superconductor going normal) Insure cryogenic operations before machine turn on Assist as needed with cryogenic repairs Assist as needed with cryogenic emergencies. The accelerator tunnel and some building are ODH (an Oxygen Deficiency Hazard) 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Global Schematic of Tevatron Cryogenic System 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Shared effort between Groups Manpower on the evening and overnight shift. Cryogenics engineers would provide training classes as needed. Cryogenics group would provide documentation and procedures for the system. Cryogenics and operations worked together with the Controls group to insure the proper operational software was available. Good communication between the groups 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Interactions between the Operations Group and the Cryogenics Group During machine operation, both groups had a control room manned around the clock. The Main Control Room (MCR) for operations, and the Central Helium Liquefier (CHL) control room for Cryogenics. Only the Main Control Room was manned during long maintenance periods. Both groups maintained a electronic log book that was readable by the other control room. Cryogenics provided an on-call engineer as a single point of contact for problems . 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Question: How can interactions between the groups affect operations Communication between the groups is critical since failures can be very time consuming. Two Control Rooms means areas of responsibilities must be clearly defined, but it also allows for cross training and manpower swaps when needed. Single point of contact for the Main Control Room to the On-Call Cryogenic Engineer was critical during failures. 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Cryogenics, Machine operation, and Success The accelerator has to be running reliably for there to be a successful physics program In a superconducting machine the cryogenics must be reliable for the machine to operate. Failure can happen in the cryogenic system itself or in some system that affects the cryogenic system. In a superconducting accelerator almost everything affects the cryogenics 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Definitions Quench – When the superconductor in the magnet goes normal and it is no longer safe to power the magnet system. Quench Protection System (QPM) – System designed to detect a quench, de-power the accelerator, and spread out the heating in the magnet string. The system would also signal the cryogenic system to start recovery. Refrigerator recovery – The process of cooling the magnet string down to an operational temperature. Failure – For the purpose of this talk, it is any thing that causes the Quench Protection System to de-power the machine 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

How was cryogenic operations different from other sub-systems? Duration of failures. Most failures had a long recovery time. Once the failure was fixed, the system needed to be recovered. Quench Protection system always assumed worst case Quenches always had the potential to break something Injection field quench recovery 15 to 30 minutes High Field quench recovery 2 to 3 hours Low beta magnet insertion at high field 4 + hours Complete helium expansion engine overhaul 8 to 12 hours 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Causes of Quenches Beam induced quench. Beam is steered into a magnet inducing heating. Magnet / Component Failure. Long recovery time. Failures in other interacting system that induce a quench or is interpreted as a quench Failures in the cryogenic system itself. 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Beam Induced Quenches Beam or beam loss induces a quench in the system Beam is steered into cryogenic magnet Beam losses during acceleration Beam loss due to tight aperture 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Reduction of Beam Quenches Automatic beam orbit correction between beam stores Magnet alignment during maintenance periods Collimation at loss points Better simulations to help with orbit tuning 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Failures in other systems that affect cryogenics Power supply failure can induce a quench Loss of regulation in the power system usually resulted in a quench Power system shutting down usually would not induce a quench but could if conditions were right. Correction element power supply failure or other power supply failure usually resulted in a beam induced quench. Failure in the quench protection system The quench protection system tried to protect against itself. It monitors for hardware failure and could induce a quench depending on the failure 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Magnet /Component Failure Components usually fail during a quench Quenches and component failures were both documented and analyzed. Long term solutions that are critical for stability At least once lead to a redesign and modification of the Tevatron magnets At times has lead to changes in the way we operated the Tevatron 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Cryogenic system failures The cryogenic system has a large number of moving mechanical components: helium compressors, expansion engines, and cold compressors. Moving components regularly fail and required maintenance. Regular inspection helped catch failing components and could reduce repair times. Regular cryogenic maintenance improved the collider uptime. This was not historically how we scheduled maintenance on other systems. Failures are time critical 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Lessons Learned Need a stable accelerator to be successful Cryogenic failures are time consuming Communication is critical Maintenance of the cryogenic system should be planned Protect the cryogenic component by knowing the beam orbit and controlling it Analyze failures and make long term fixes 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Measure of Success 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Questions

Stanley R. Johson - Fermilab - WAO 2012 Extra Pictures 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Satellite Refrigerator Building 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Ice Ball 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Damage from an Ice Ball 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Ice Ball at Turnaround Box 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Cryo Leak 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Beam Damage 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Frig Control Summary 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012

Stanley R. Johson - Fermilab - WAO 2012 Control Loop 11/17/2018 Stanley R. Johson - Fermilab - WAO 2012