Introduction to Transportation Engineering

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Intro to B & W Photography, silver based for non Photo Majors.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
3 hr 5 hr 8 hr Hours worked Charge
Agenda of Week VII. LP V LP Application 2 Time assignment Beggar family LINGO illustration Understanding LP LP interpretation Week 6 1 LP Sensitivity Analysis.
ThemeGallery PowerTemplate
Athlete or Machine? A STEM Resource
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Ozone Level ppb (parts per billion)
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter 8 Markups and Markdowns: Perishables and Breakeven Analysis.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Chapter 3: Utilization and Volume. 26 Chartbook 2000 Community hospital acute care admissions declined 15 percent between 1980 and 1994 and then began.
Preview Warm Up California Standards Lesson Presentation.
How Much Money Do I Need To Make?. Monthly Budget.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
1 More Standard Costing & Variance Analysis Week 10.
WHO WANTS TO BE A MILLIONAIRE? CAPACITY STYLE.
Who Wants To Be A Millionaire? Mrs Mances Edition.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Year 10 Exam Revision Groups of 4 Pupil A,B,C,D 1 point for each pupil.
INTRAVENOUS DOSAGE CALCULATIONS TUTORIAL.
INSTALLMENT BUYING Chapter Fourteen McGraw-Hill/Irwin
Problem1; Admission Flow
COST-VOLUME-PROFIT (CVP) ANALYSIS
Case Study.
Using the Parkride2.mac Macro to Model Park and Ride Demand in the Puget Sound Region 22 nd International Emme Users Conference September 15-16, 2011,
Modal split to be estimated on an interzonal basis.
ENERGY STAR ® Qualified Fenestration Products ENERGY STAR Meeting – June 4, 2008 Steve Hopwood Office of Energy Efficiency.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Analysis grid superimposed 2D Street Grid Calculating Travel-Time …vector to raster conversion Note that a 100 row by 100 column analysis grid (10,000.
Mass Transit OSullivan Chapter 11. Outline of the Chapter Analyze some empirical facts about public transit in the United States Analyze the commuters.
Innovations in Multi-Modal Transit Mapping Margaret Carragher E.I.T Advisor: Dr. Kari Watkins P.E. October 16, 2013 GIS in Transit Conference, Washington.
How LRT affect Kayseri Feyzullah GUNDOGDU Kayseri Light Rail System Fixed Installation Manager
NUMBER & ALGEBRA REVIEW (With your built-in calculator!) By Mr. Barnard.
1 Chapter 10 Multicriteria Decision-Marking Models.
Decision Analysis (Decision Trees) Y. İlker TOPCU, Ph.D twitter.com/yitopcu.
Cost-Volume-Profit Relationships
Simple Interest Lesson
In Portland, Oregon TRB Planning Applications Conference Reno, Nevada Mark Bradley Research & Consulting.
August 16, 2014 Modeling the Performance of Wireless Sensor Networks Carla Fabiana Chiasserini Michele Garetto Telecommunication Networks Group Politecnico.
Roghibin's blog EQUILIBRIUM OF RIGID BODIES KESETIMBANG AN BENDA TEGAR.
Figure 1. PX Prices and Total ISO Load (May 15 - August 31, 2000) MW $/MWh.
Part 3 /3 High School by SSL Technologies Physics Ex-38 Question-1 A force of 12 N, acting 60 o from the horizontal, is applied to a 20 kg cart initially.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Lesson Menu Five-Minute Check (over Lesson 5–7) Main Idea and Vocabulary Key Concept: Percent of Change Example 1:Real-World Example: Find Percent of Change.
23-8 3x6 Double it Take Away 6 Share By 9 Double it +10 Halve it Beginner Start Answer Intermediate 70 50% of this ÷7÷7 x8 Double it Start Answer.
DISTANCE: (d=rt).
Mode, Median and Mean Great Marlow School Mathematics Department.
Equal or Not. Equal or Not
Slippery Slope
Transparency 7 Click the mouse button or press the Space Bar to display the answers.
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
$100,000 Pyramid A Fun Vocabulary Game! CAN YOU GUESS ALL SIX WORDS IN 1 MINUTE? Player 1: Sees the word and defines/describes it without saying the word.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Partial Products. Category 1 1 x 3-digit problems.
Distance, speed and acceleration
TRAVEL MATHS D T S SPEED DISTANCE TRAVELLED JOURNEY TIME.
Select a time to count down from the clock above
Speed Distance Time. Intermediate 1. Unit 2..
The second kind of control structure in GWBASIC is condition or decision making. In GWBASIC we use If.. Then.. Else statement. 2 ) If.. Then …Else The.
Planes, Boats & Planograms Howard Bergman. The Power of the Customer There is only one boss. The customer. And he can fire everybody in the company from.
Mode Choice Lecture 10 Norman W. Garrick. Mode Choice The introduction of congestion charging in London in 2003 is one example of a situation where mode.
Norman W. Garrick Mode Choice The introduction of congestion charging in London in 2003 is one example of a situation where mode choice modeling is needed.
Travel Demand Forecasting: Mode Choice
Introduction to Transportation Engineering
Trip Distribution Lecture 8 Norman W. Garrick and Hamed Ahangari
Presentation transcript:

Introduction to Transportation Engineering Instructor Dr. Norman Garrick Hamed Ahangari 6th March 2014

Trip Distribution

Gravity Model

Example 1 P=800 A= 10 P=1500 P=200 A= 20 P=1200 A= 2 Zone 1 Zone 2 Calibration Factor, c = 1.5 Socio-economic factor, kij = 1.0

Target-Year Inter-zonal Impedances, {Wij}-Given TAZ 1 2 3 4 5 10 20 25 100 50

Step 1- Calculate Friction Factors, {Fij} TAZ 1 2 3 4 0.0894 0.0316 0.0112 0.0080 0.0010 0.0028

Step 2- Find Denominator of Gravity Model Equation {AjFijKij} TAZ 1 2 3 4 Total Σ(AjFijKij) 0.17889 0.63246 0.1118 0.31623 1.23937 0.06325 1.78885 0.08 0.01 1.9421 0.02236 0.16 0.89443 0.02828 1.10507 0.02 1.00596

Step 3- Find Probability that Trip i will be attracted to Zone j, {pij} AjFijKij pij = Σ(AjFijKij) TAZ 1 2 3 4 Total 0.144 0.510 0.090 0.255 0.033 0.921 0.041 0.005 0.020 0.145 0.809 0.026 0.063 0.028 0.889

Step 4- Find Trip Interchanges, {Tij} Tij = Pipij TAZ 1 2 3 4 Total 173 612 108 306 1200 7 184 8 200 30 217 1214 38 1500 50 16 22 711 800

Zone 1 Zone 2 612 7 173 50 1 16 108 30 306 Zone 4 Zone 3 38 22

Example 2 UConn. UConn Buckland Hill Westfarm Mall Eastbrook Mall

Calibration Factor c = 2.0 Socioeconomic Adj. Factor K = 1.0 Uconn. P1=2000 Eastbrook A1: 10 t1: 10 min Buckland Hill A2: 60 t2: 20 min Westfarm A3: 80 t3: 40 min Calibration Factor c = 2.0 Socioeconomic Adj. Factor K = 1.0

Calculations-1 0.10 0.15 0.05 0.30 J Aj t1j F1j=tij^(-2) Aj*F1j 1 10 1/100=0.01 0.10 2 60 20 1/400=0.0025 0.15 3 80 40 1/1600=0.000625 0.05 Total 0.30

Calculations-2 J Aj*F1j P1j= Aj*F1j/(∑Aj*F1j) T1j= P1*p1j 1 0.10 0.1/0.30=0.333 2000*0.33=667 2 0.15 0.15/0.3=0.5 2000*0.5=1000 3 0.05 0.05/0.3=0.167 2000*0.167=333 Total 0.30 1.000 2000

Trip Distribution Results UConn Buckland Hill Westfarm Mall Eastbrook Mall 1000 trips 333 trips 667 trips

Mode Choice

Example 1 Calculate the mode shares for auto and light rail transit (LRT) using the utility function given. uk = ak – 0.045 Ta – 0.03 Tw – 0.01 Tr– 0.005 C where: Ta - access time, Tw - waiting time, Tr - riding time, C - out of pocket cost

Modes Specifications Mode a(k) Ta Access time Tw Waiting time Tr Riding time C Out of pocket cost LRT -0.04 15 50 40 Auto -0.025 10 20 100

Key formulas 𝑈 𝑚 = 𝑎 𝑚 −𝑎1∗ 𝑋 1 −𝑎2∗ 𝑋 2

Utility Calculations uk = ak – 0.045 Ta – 0.03 Tw – 0.01 Tr– 0.005 C Mode Calculations Utility LRT =-0.04-0.045*15-0.03*15 - .01*50- 0.005*40 -1.865 Auto =-0.025-0.045*10-0.03*0 - .01*20- 0.005*100 -1.190

Mode choice Estimation Uk e^(Uk) Probability of selecting LRT -1.865 0.1548 0.337 Auto -1.190 0.3042 0.663 Total 0.4841 1.000

Policy Analysis Which policy may promote transit? 1-Applying congestion pricing for Auto mode ( Increase the cost of auto to 120) 2- Improving transit by decreasing waiting time to 5 minute

Increase Train Frequencies Scenario Analysis Congestion Pricing Increase Train Frequencies Mode Uk e^(Uk) Prob. of selecting LRT -1.865 0.1548 0.360 Auto -1.290 0.2752 0.640 Total 0.4301 1.000 Mode Uk e^(Uk) Prob. of selecting LRT -1.565 0.2091 0.407 Auto -1.190 0.3042 0.593 Total 0.5233 1.000

Comparing Results

Example 2 Mode choice: Storrs to NYC Available modes: Auto (Private car ) Bus Train (From New haven) uk = ak – 0.0075 X1 – 0.012 X2 X1: Travel Cost X2: travel Time

Mode Characteristics - Auto Cost Analysis Gasoline Cost (300 miles round trip) 35 $ Tool Cost 15 $ Parking Cost 40 $ Total Cost 80 $ Time Analysis Round trip 150*2=300 min Parking 20 Total time 320 min

Mode Characteristics - Bus Cost Analysis Ticket Cost Round trip 25*2= 50 $ Time Analysis Waiting time 15*2= 30 min Round trip Travel time 210*2=420 Total time 440 min

Mode Characteristics - Train Cost Analysis Gasoline Price 12 $ Parking 8 $ Train Ticket 27 $ Total Cost 47 $ Time Analysis Driving from Storrs to New Haven 55*2=110 min Parking 20 min Transfer time 2*15= 30 min Train from New Haven to NYC 100*2=200 min Total time 360 min

Modes Characteristics Total Cost Total Time a(k) Auto 80 320 -0.3 Bus 50 460 -0.5 Train 47 340 -0.2

Utility Calculations Mode Calculations Utility Auto =-0.3-0.0075*80-0.012*320 -4.740 Bus =-0.5-0.0075*50-0.012*450 -6.275 Train =-0.2-0.0075*47-0.012*340 -4.873

Mode choice Estimation Uk e^(Uk) Probability of selecting Auto -4.740 0.008738 0.478 Bus -6.375 0.001883 0.103 Train -4.773 0.007654 0.418 Total 0.018275 1.000

Scenario 2- New Utility Function (Sensitive to Out of Vehicle time) uk = ak – 0.0075 X1 – 0.012 X2 – 0.036 X3 X1: Travel Cost,X2: in vehicle travel Time X3:out of vehicle travel Time

Modal Choice in Scenario 2 Mode Uk e^(Uk) Probability of selecting Auto -5.22 0.005407 0.627 Bus -6.995 0.000916 0.106 Train -6.0725 0.002305 0.267 Total 0.008629 1.000