® Flats Track for Periodicals, Catalogs & Printers Automating Flat Mail Preparation in the Future Anita Pursley – Worldcolor Brent Raney - USPS National.

Slides:



Advertisements
Similar presentations
Move Update & Compliance Fundamentals M & W Printers and United States Postal Service.
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
© Copyright 2004 United Parcel Service of America, Inc. UPS, the UPS brandmark, and the color brown are registered trademarks of United Parcel Service.
Chapter 10 Material Handling.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
1 Scheme Combination Product and Labeling Lists. 2 Agenda Scheme Combination Background Task Team 11 Current Update Process Interim Update Process Future.
ABC Technology Project
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Resource Management Unit 5.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
® Flats Symposium 2008 USPS Engineering - Future Technology National Postal Forum ® Walt O’Tormey Vice President, Engineering USPS National Postal Forum.
Addressing, Automation & Presort Lloyd M. Moss. Agenda Overview of how Addressing, Automation and Presort earn postal discounts Addressing Requirements:
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
Price Change Effective April 26, 2015 Northeast Area Mailing Industry Focus Group Meeting February 25,
® New MTAC User Groups/Work Groups/Task Teams Work Group #167: Solutions for Pieces Excluded from Service Measurement Start date: 1/21/2015 Target Completion.
Reduce Postage Costs and Improve Delivery, Combined Mailing Solutions PCC Mailers Forum 2014 September 10 th, 2014 Deborah Damore Fairrington Transportation.
FSS / DPP PROGRAM OVERVIEW Flats Sequencing System & Delivery Point Packaging Status Update February 2005.
® Flats Track for Periodicals, Catalogs & Printers Steve Forte Senior Vice President Operations, USPS Rosa Fulton Executive Director, FSS National Postal.
Background on USPS mail forwarding operations Overview of PARS
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
National Postal Forum April 12, 2010 National Postal Forum ®
Greater New York Postal Customer Council
Status of NDC Activations MTAC Briefing August 12, 2009.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
® MTAC 131 Workgroup Update. 2 MTAC 131 Charter Recap MTAC charter:  This workgroup will focus on the issues regarding communicating what separations.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report February 5, 2004.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Move/ Update Rules and the Printer’s Role 2010 National Postal Forum Nashville, April Greylock Associates Michael Winn, President Printers as “Mail.
MTAC Meeting February 23, 2005 Integrated Mail Management.
Optimizing Parcel Preparation & Entry for Seamless Acceptance Final Presentation MTAC Work Group # 109 Industry Leader: Wendy Smith USPS Leader: Jim Cochrane.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009.
® Flats Sequencing System (FSS) November 20, 2008 Rosa Fulton Phil Fabrizio.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
® Intelligent Mail Measurement Readiness. Letters - Automation Data Capture PointTechnologyTimelineBarrier Start the Clock: Induction Acceptance scans.
FSS PREP AND ENTRY (WG #115) MTAC, August FSS Prep and Entry Workgroup #115 August 1, 2007 Joe Schick – Quad Graphics Rod Barbee – USPS Engineering.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
® Intelligent Mail Measurement Readiness June 13, 2007 Full WG Meeting.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
MTAC Flats Sequencing Systems (FSS) New Area of Focus.
MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.
® Flats Sequencing System (FSS) February 2009 Cathy MoonPhil Fabrizio FSS Project Office MTAC Meeting.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
FLAT MAIL PREPARATION OPTIMIZATION WORK GROUP #81 MTAC Report May 6, 2004.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Workgroup # 96 Developing An Interface To The AFSM 100 Automatic Induction Process POSTAL CO-CHAIR DAVE WILLIAMS INDUSTRY CO-CHAIR MIKE WINN.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Maximizing Postage Savings and Delivery for Small-Volume and Local/Regional Periodicals Max Heath, National Newspaper Association Susan Thomas, Mailing.
Panel 2: Flats Containerization
Presentation transcript:

® Flats Track for Periodicals, Catalogs & Printers Automating Flat Mail Preparation in the Future Anita Pursley – Worldcolor Brent Raney - USPS National Postal Forum ®

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Volume Reduction is driving changes to: Distribution Network Delivery processes Processing operations Mail preparation Mail entry locations Mail arrival times How does this impact you and your business? Agenda

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® RPW Flat volume decline FY % FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually FY 2005 – FY 2009 Flat volume decline 26% 14.3 billion fewer flats annually Declining Volume -- Action Imperative

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Flats Process Today Mailers Bundle DistributionBundle PrepPiece DistributionDelivery

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Eliminate Non-Value Added Work/Processes Mailers Bundle DistributionBundle PrepPiece DistributionDelivery

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Flats Process Future Mailers Flats Sequencing Delivery Automated Bundle Preparation

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® USPS & Industry Focus of process improvements Overview of Flat Process Print Create Mailing Bind Personalize Stitch/Staple Strap / Wrap Strap/wrap bundles Palletize Load bundles & wrap pallets Design Mailing Mailer Deliver Integrate flats / letters & deliver Sort & Sequence Piece distribution Manual / AFSM & FSS Flat Prep Unwrap / un- strap bundles Dump & Sort Bundle Distribution APPS / SPBS Unload & Transfer Flow to bundle distribution or dock transfer Mail OwnerMail Preparer USPS

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® 1. MTAC 58, 2000 – 2002 Preparing Flats Using Alternate Packaging 2. MTAC 71, 2002 – 2003 Flats Container Development 3. MTAC 81, 2003 – 2005 Flat Mail Preparation Optimization 4. MTAC 96, 2005 – 2007 Develop Interface to AFSM 100 Auto-Induction Process 5. MTAC 101, Address Location for Flats Sequencing System 6. MTAC 115, 2007 – 2009 Requirements for preparation and entry of flat mail in the Flats Sequencing System (FSS) environment. 7. MTAC 134, TBD Implementing FSS Presort Parameters Joint USPS / Industry Workgroups

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Mailer Logs (MTAC WG71) Ft. Myers Idea Create logs of finished books similar to signatures (pages) used in binding process Issues Required Counter-stacking of books within log Required change to finishing lines Required Mailer Development/Investment of new equipment History of Flat Prep Optimization Output: Standardized Prep and Ai at the AFSM100

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Ship Mail in ACTs/Dollies (MTAC WG96) Idea Mailers prepare and ship flats in ACTs on Dollies or on pallets Issues Not as cube efficient as pallets, could double trucking requirements Required large space to store empty stock at mailer plants MTAC Workgroups Refined Solutions Output: Ship Bundles on the Auto-Ready Pallet

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Standard Size Bundles (MTAC WG115) Idea Mailers prepare and ship flats in standard size bundles on pallets with strap-only or belly band Benefits Combining multiple flats flows on one pallet lead to shipping efficiencies Utilized existing equipment in mailer plants Paved way for new efficiency opportunities Solution: Single Flats Flow Output: Multi-Scheme Pallets and Automated Flat Prep

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Adopt Auto-Ready Pallet Finishing Process …preferred method for the Ai environment as we move toward FSS The Auto Ready Pallet considers the output of a mail preparer as the input to a piece of postal automation – either AFSM- ai or FSS. 6 sort plans Outcome of MTAC Efforts

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® 3.5 – 5.5 (+-.5) bundles Bindings aligned within the bundle Barcoded Flats – 11 digit IMB or Postnet Multiple schemes per pallet Cross-Strap (2) preparation - Centered ± 2 Counter-stacking of bundles on pallets allowed for stability Auto-Ready Pallet

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Automated Flats Processor Developed a prototype system Automated Flats Processor (AFP) to improve: Productivity of bundle processing Equipment space required to process daily volume Capability to accept multi-zone pallets Flats auto processing – induction to piece sorting

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Automated Flat Processor Key Functions Auto Depalletize Bundles – automatically unloads bundles from pallets Distribute Bundles - based on sort plans with OEL readability – convey & prep bundles for processing Process Bundles – cut and remove bundle strapping and load bundles into ACTs Make Dollies – produce sort plan based dollies Dispatch Dollies – full ACTs, produced for specific sort plans, released for induct into flats sorting equipment

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Automated Flat Processor Overview De-palletized bundles Bundle Buffer/Sort Make Dollies Stack ACTs Cut Straps and Load ACTs

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® VIDEO

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® AFP Bundle/Containers Tested Bundle / Container testing: Built on auto-ready pallet concept Evaluated – uniform bundle heights, compensation of bundles, containerization, and bundle securing methods Determined counter-stacked bundles of uniform height travel well through transportation / distribution system

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® AFP Bundle/Containers Tested Bundle securing methods tested: Two cross-straps around length and girth Shrinkwrap bellyband with a single-strap as alternative to strap only Shrinkwrap bellyband only

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Workgroup Activities Evaluated potential pallet makeups: Pure FSS (single scheme) Pure FSS (multiple schemes) Combined FSS and non-FSS Assessed impact of volume reduction Volume reduction has required more ZIP Codes and FSS sites than original plan Some original sites receiving fewer machines Volume reduction makes preparation of FSS single-scheme pallets more difficult Considered single preparation solution Lowest end-to-end cost achieved with one bundle preparation method Prep compatible with FSS and AFSM process

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Test Findings Auto-ready pallet prep will allow bundles to flow directly to the bundle prep operation and bypass APPS processing Multiple sort plans (up to 6) can be accommodated by AFP Bundles with optimal heights of 3, 4 and 6 processed with no issues Bundles with cross-straps (± 2 from center) processed with no issues Bundles with one strap and one bellywrap processed with few issues

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® 22 Automated Pallet Unloader Cut, Stack & Load Dolly Maker ACT Stacker/Destacker Bundle Handling System Tray Handling System Production Automated Flat Processor Configuration

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® Whats required to earn a certificate? Attend five workshops of the Flats Track for Periodicals, Catalogs and Printers How do I get my certificate? Register for your certificate on the National Postal Forum Website before July 31, Answer the three true/false questions for each of the five sessions you attended Certificates will be mailed upon certification Flats Track Certificate Program

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ® True or False: 1. Uncompensated bundles are bundles with straps only? 2. The Auto Flat Prep (AFP) allows for more pallets to by-pass any upstream bundle distribution process? 3. An auto ready pallet will provide the capability to accept pallets made with mail for multiple different zones? Flats Track Certificate Program TRUE FALSE

Flats Track for Periodicals, Catalogs & Printers – NPF National Postal Forum ®