CMS Goal of the experiment

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
ATLAS experiment Paula Eerola ATLAS presentation Prof. Paula Eerola Division of High Energy Physics Fysiska institutionen,Professorsgatan 1,
The CMS Muon Detector Thomas Hebbeker Aachen July 2001 Searching for New Physics with High Energy Muons.
1. 2 CERN European Organization for Nuclear Research Founded in 1954 by 12 countries – Norway one of them Today: 20 member states, around 2500 staff –
03/27/'07T. ISGC20071 Computing GRID for ALICE in Japan Hiroshima University Takuma Horaguchi for the ALICE Collaboration
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Particle Physics Quiz EPPOG Hands on Particle Physics Masterclasses 2011.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HPS – ECal Detector - TECHNICAL PARAMETERS The experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for precise momentum.
Collider Detector at Fermilab Sung-hyun chang High Energy Physics lab. KNU.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
Discovering the Higgs Boson J. Pilcher Talk for Graduate Students January 9, 2004.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
ATLAS micromegas activities (MAMMA)
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
Searching for New Matter with the D0 Experiment Todd Adams Department of Physics Florida State University September 19, 2004.
Sep/19/2008 Su Dong Stanford Student Orientation: Accelerator based Particle Physics1 Accelerator Based Particle Physics Su Dong Stanford Student Orientation.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PERG Seminar Warsaw University of Technology, Collaboration of particle physicists with electronics engineers Grzegorz Wrochna Soltan Institute.
1 A collision in the CMS detector Particle trajectories are reconstructed with precision of few microns (1 μ = m)
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
LHC Science Goals & Objectives
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Results achieved so far to improve the RPC rate capability
The LHCb Installation Story
Financing of LHC projects and CMS
Prospecting for Gold: Particle Detectors
CERN R&D plans and Infrastructures
Resolution Studies of the CMS ECAL in the 2003 Test Beam
China at LHC Institutional participation Resources of Fund
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
CMS muon detectors and muon system performance
@tarashears.
LHC DATA ANALYSIS INFN (LNL – PADOVA)
Mini-drawers, FE-ASIC , Integrator
Status of CMS and the Austrian Contribution to the Trigger System
MicroMegas Mechanical Meeting --- Cern April 2014
Kevin Burkett Harvard University June 12, 2001
The ATLAS Experiment at the LHC
Particle Physics at the CERN Large Hadron Collider
ATLAS Collaboration 3000 Physicists including 1000 students.
Pine cove pit time lapse drone photos
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
by M. Della Negra, P. Jenni, and T. S. Virdee
Collaboration Board Meeting
L H C A T L A S International Collaboration on the LHC Project
AMICI WP1 – Management, coordination and dissemination
TSF Upgrade Project Overview Resources Plans and Timetable
McDonald’s calendar 2007.
February 2007 Note: Source:.
RPC Detector Control System
The ATLAS Experiment at the LHC
SHLC INFN Road Map Working Group 11/01/2006
McDonald’s calendar 2007.
Plans for the 2004 CSC Beam Test
2015 January February March April May June July August September
CMS Institutes: 202 Institutes in 46 countries
Presentation transcript:

CMS Goal of the experiment To explore the physics of p-p collisions at 14 TeV center-of-mass-energy of LHC. The main goal of CMS will be the search and study of the Higgs boson and of the super-symmetric partners of the known particles. The scientific program includes also detailed studies of the top quark and precision measurements of CP violation parameters in the b-system. The physics of heavy ion collisions to identify the signature and study the properties of quark-gluon plasma will also be addressed. Physics achievements in 2001 The experiment is still in construction, therefore no physics result has been achieved in 2001. Important results have been obtained from the R&D activity carried on for all the sub-systems of the experiment, including computing. INFN contribution to the experiment in terms of manpower and financial support INFN researchers are involved in the following sub-detectors: Solenoidal Magnet, Tracker, Electromagnetic Calorimeter, Muon System and Computing. The total number of physicists and engineers working in CMS in 2001 is 221. They come from 12 INFN Laboratories and account for about 15% of the total number of CMS collaborators. Technicians are not included in these figures. The INFN financial support for CMS deliverables amounts to about 55 MCHF over an estimated total cost of the experiment around 466 MCHF. Funding foreseen in the 2002 Budget: 8141 kEuro

Number of publications in refereed journals ~ 30 Number of talks to conferences (from INFN) ~ 20 Number of undergraduate and doctoral thesis on the experiment 17 undergraduate students and 6 doctoral thesis Leadership role in the experiment - Lorenzo Foa‘ : Chairman of the Collaboration Board - Fabrizio Gasparini: Project Leader (Muon) - Rino Castaldi: Deputy Project Leader (Tracker) - Cristiana Peroni: Finance Board - Guido Tonelli: Management Board and Finance Board Innovative instruments 4T magnet; large area RPC’s; radiation-hard silicon detectors and read-out electronics; analog optical links; new crystals and APDs; new approach on trigger, data handling and computing. Competing experiments ATLAS for the entire physics program. CDF and LHC-B for part of the program; Alice for Heavy Ions physics. International committees which have reviewed the experiment The most important one is the LHC Committe at CERN.

Milestones 2001 MAGNET Winding of the prototype July Completion of CB-2 module December RPC Production of front-end chips July Production of front-end boards September Production of 70% of stations of the 1st wheel December ECAL Construction of the 1st module in INFN/ENEA RC December Production and test of module 0 December MUONS DT Completion of production lines in LNL March 5 DT chambers produced June Completion of the tender for trigger ASICs (BTI, BTIM) October 15 DT chambers produced December TRACKER Construction and test of a pre-series of 200 modules June Start of series production of detectors and mechanical structures December

Milestones 2002 MUONS 8 MB3 May Further 8 MB3 October Production lines in Torino ready September Assembly test of the first mini-crate October RPC Decision on mass production January Production and test of the front end chips February Production stations 2 and 3 CW June HV system prototype ready July Production and test of all FE boards September Production station 1 CW October ECAL Quality check on 2000 crystals June* • Quality check on 6000 crystals (20% of the total) December* Assembly and test of 5 modules June* Assembly and test of 12 modules (15% of the total) December* • Test of 12 HV boards June • Test of 36 HV boards (25% of the total) December Production of 26 grids June • Production of 52 grids (36% of the total) *These items are subject to the delivery in time of parts (like crystals or photo-detectors) supposed to be delivered by other Institutions.

Milestones 2002 TRACKER 40 modules M200 produced January System test (6 modules in a string) March Final specifications optical hybrid May Start-up of module production June Final specifications Power Supply October 400 modules produced December Layer 1 mechanical structure December MAGNET Impregnated prototype ready January Module CB-2 impregnated April Module CB-1 impregnated July Module CB0 impregnated October COMPUTING All sites operational March One half of the sites working in integrated mode April Test of Data Base distribution within sites June 4 Tier2 initial prototypes ready October MC production of 20% of the events needed by CMS December