22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Portfolio Committee on Energy Securing financial sustainability (in response to lower tariff decision) May 2013.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
Eskom’s pricing proposal for the MYPD2 Nersa public hearings Jan 22, 2010 Dr. Miriam Altman Executive Director Centre for Poverty, Employment & Growth.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
Response to the Eskom Revenue Application for the Multi Year Price Determination for the period 2010/11 to 2012/13 (MYPD 2) Presentation by Business Unity.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
An Overview of Our Regulatory Proposal
09/09/20151 ESKOM’S PROPOSED REVENUE APPLICATION MULTI-YEAR PRICE DETERMINATION 2010/11 TO 2012/13 (MYPD2) NERSA’s PUBLIC HEARING 19 January Port.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
Carbon tax policy BUSA submission to Portfolio Committee on Trade and Industry August 2013.
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Towards an Affordable, Stable Electricity Supply MISSION CRITICAL FOR SOUTH AFRICA Public Presentation To NERSA by Nick Holland Chief Executive Officer.
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
The Institute for Municipal Finance Excellence NERSA HEARINGS 20 JANUARY 2010 Eskom’s Revised Revenue Application MYPD 2010/11 – 2012/13.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Green Connection - Southern African FAITH COMMUNITIES ENVIRONMENT INSTITUTE Liziwe McDaid.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Presentation to Select Committee on Economic Development
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
1 Tricorn Preliminary Results For year ended 31st March 2010.
MYPD2 APPLICATION 15 OCTOBER 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
1 The Eskom price adjustment Effective 1 July 2009.
System Status Update February Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What.
Just transition to a low carbon economy
Strategic Plan and Annual Performance Plan
ELECTRICITY DISTRIBUTION INDUSTRY DECISION
OVERVIEW OF ANNUAL REPORT PRESENTED TO THE PCOF / NCOP SC
Inquiry into the national electricity supply shortage and load shedding Presented to the Parliamentary Portfolio Committee on Minerals and Energy 28 May.
REFLECTED IN JAMAICA’S ENERGY POLICY
BULGARIA – ECONOMIC PERSPECTIVES
Integrated Resource Plan 1
2014 Adjustment Appropriation
Monetary Policy.
Meeting Standards and Expectations in the Water Industry
SECRET.
NERSA presentation at the PPC meeting held on 24 May 2006
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
Affordable Energy Production from Renewable Fuel
ELECTRICITY PRICING POLICY AND IMPACT ON THE MULTI YEAR PRICE DETERMINATION BY NERSA Matthews Bantsijang 7/6/2018.
Eskom Holdings Limited Reg. No. 2002/015527/06
Transmission: the Critical Link
DEPARTMENT OF MINERAL RESOURCES
Creating a ‘country compact’ to ensure a secure and sustainable future
Creating a ‘country compact’ to ensure a secure and sustainable future
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Creating a ‘country compact’ to ensure a secure and sustainable future
Creating a ‘country compact’ to ensure a secure and sustainable future
Translating political objectives into sound policy proposals
Creating a ‘country compact’ to ensure a secure and sustainable future
Creating a ‘country compact’ to ensure a secure and sustainable future
FFC Briefing to the Portfolio Committee on Energy
Transmission Pricing & Regional Electric Markets
progress of the water reform in bulgaria
SOUTH AFRICAN INSURANCE ASSOCIATION
Electricity Price Increase 2008/9
PRESENTATION TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITEE ON ENERGY
OUTLINE RE Programme Objectives Integrated Resource Plan
Minerals & Energy Parliamentary Portfolio Committee
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
NUM WESTERN CAPE SUBMISSION ON IRP 2018
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
OUTLINE Legislative context, NERSA vision and NERSA mission
Presentation transcript:

Creating a ‘country compact’ to ensure a secure and sustainable future Mr Mpho Makwana 11-22 January 2010 NERSA public hearings Eskom’s MYPD2 application

Creating a ‘country compact’ to ensure a secure and sustainable future Although we are dealing with this application in a 3 year context, it is important for continuity of supply to keep in mind the longer term requirements for the country As a country we need a long term perspective on what is required to achieve a sustainable and secure long term future for South Africa and its electricity industry The current reality is that: We have a low reserve margin which results in increased operating costs, and the need for significant additional capacity. The tariffs are too low to sustain the funding needs culminating in the current weak Balance Sheet. Eskom acknowledges that a strategic shift based on effective integration and alignment with stakeholders is required to achieve a successful outcome for Eskom and for South Africa.

Creating a ‘country compact’ to ensure a secure and sustainable future This outcome cannot be guaranteed by Eskom on its own – we need a compact between all South Africans to work together to overcome our challenges Accordingly, Eskom’s revised application is based on this collaborative and integrated approach and will involve making choices and trade- offs as a country to ensure a sustainable energy future. Eskom has therefore changed its tariff application from 45% to 35%, but this choice increases the risk profile relating to sustainability and fundability. Eskom is committed to work in partnership with stakeholders to address these risks.

Eskom’s MYPD2 application is based on six pillars 1 The role of Eskom in the economy Resolving the funding model for the new build 2 3 Meeting the cost of keeping the lights on A sustainable economy, protecting the environment and mitigating climate change 4 5 Allowing for entrance of IPPs Addressing the impact on economically vulnerable communities 6

As a country, we need to make up for a long period of underinvestment 2 TVM-AAA123-20091125- As a country, we need to make up for a long period of underinvestment Real c/KWh (2008 base) 1983 - De Villiers commission scrapped the Capital Development Fund in response to high tariffs To be sustainable in the long term, electricity prices need to reflect the true cost of generation 32 2008 – lack of capacity results in load shedding 30 1972 - Capital Development Fund introduced to fund new build through tariffs 28 Period of underinvestment 26 24 High tariffs during the last build period 22 20 18 1957 1961 1967 1973 1979 1985 1991 1997 2003 2009 5

The current low reserve margin has major implications for Eskom and for the country Tighter reserve margin and rising costs since 2007/8 Reduced security of supply Constrained supply: Available capacity not able to meet increased demand Planned load shedding: balancing demand and supply require shedding specific users to prevent system collapse Increased opex cost base New power stations resulted in increased human capital costs due to new vacancies to be filled Ageing power station fleet and high utilisation results in increased maintenance costs Higher primary energy costs Higher volumes: Tight reserve margins require higher energy output from stations and therefore more coal volumes Higher coal price: Reliance on more expensive short-term coal contracts due to inadequate investment in new mines and depletion of Eskom mining reserves Higher transport cost: Under investment in new mines and depleting mine reserves resulting in coal imports from mines further away and transported by road 6 6

Eskom’s funding model, derives both tariffs and other funding sources Eskom’s regulated revenue (tariff) is intended to cover the cost of current electricity supply Recovery of prudently incurred costs - Primary energy - Operating expenditure Depreciation on existing assets Return on existing assets New plant should ideally be funded from sources other than tariffs - Retained earnings (reserves) - New equity from the shareholder - Borrowings 7 7

Average cost of R103bn p.a. during MYPD2 period We need massive capital expenditure to keep SA’s lights on for the future Generation Transmission Distribution Average cost of R103bn p.a. during MYPD2 period R&D Rbn R107bn R164bn Committed new power station projects include Medupi, Kusile, and Ingula Returning to service Mothballed power stations Allowance for additional investment decisions R131bn R86bn R104bn R125bn R112bn R108bn R96bn R96bn R70bn 24 18 18 15 12 10 11 13 15 17 9 6 5 5 4 4 5 FY09/10 FY10/11 FY11/12 FY12/13 FY13/14 FY14/15 8

New build will also drive increases in Eskom’s operating costs TVM-AAA123-20091125- TVM-AAA123-20091125- New build will also drive increases in Eskom’s operating costs New build drives the above inflation increase in operating costs (Rm) Over the MYPD2 period, operating cost increases in Eskom’s existing business will stay in line with inflation The overall 11% increase in Eskom’s operating costs during this period will be driven by building new capacity Compound annual growth rate +11% 42 656 2 809 +52% 38 780 1 609 1 882 -20% 35 621 2 275 1 521 6 853 +43% 31 312 3 028 DSM 5 637 800 Cost of cover 3 158 3 885 New 2 361 31 385 28 986 +8% 27 187 Existing 24 993 09/10 10/11 11/12 12/13 9 9

Progress on Funding the operations and capacity In the first instance we have explored the alternative funding options to the tariff increase, these are: Equity/quasi equity: Government has provided R60bn and approved exploring additional equity options Borrowings: Three ECA transactions totalling R27bn AfDB of R20,7bn Ongoing negotiation with World Bank (USD $3.75bn) Guarantees: R176bn government guarantee We tailored our cashflow to ‘live’ within our means, which translates to deferral and savings in opex and capex of R22bn by March 2010. Eskom still has a R14bn cash shortfall within the MYPD 2 Period

Ultimately, electricity tariffs need to be aligned with long term economic growth Existing capacity added New capacity to come online Total system capacity added per 5-year period MW The MYPD2 application only deals with the next 3 years The country will need to decide how much of this Eskom will build For this to happen, tariffs need to be both economic and competitive 17 307 11 438 10 699 9 008 7 162 7 000 6 904 4 081 3 397 2 852 1969- 1975 1976- 1980 1981- 1985 1986- 1990 1991- 1995 1996- 2000 2001- 2005 2006- 2010 2011- 2015 2016-20202016-2020 2021-20282021-2028

Eskom’s tariff proposal 35% per year over three years Price increase over period to 82c/kWh R14bn cash shortfall for Eskom in 2011/12 and R8bn in 2012/13 Eskom will look into other funding interventions to address the expected shortfall A re-opening of the application may be necessary if our funding and other assumptions do not materialise 12

The country’s wish for a lower tariff increase will thus mean making choices and trade-offs Areas of opportunity Demand reduction Responsibility for new capacity and re-phasing Cost reductions Additional funding 13 JOH-ESK029-20091019-AG-P1 13

Choices and assumptions: Demand Demand forecast Sales forecast reduced to include 8.5TWh in savings from DSM over five years (roughly equivalent to the full output of half of a big coal station in one year) Lower electricity demand helps reduce SA’s carbon footprint and is crucial to ensuring security of supply All South Africans will need to work together to save electricity 14 JOH-ESK029-20091019-AG-P1 14

Choices and assumptions: Supply Responsibility for new capacity and re-phasing *Where cashflows are deferred, it implies that the project, if required to be built by Eskom will be built later. Where the IRP calls for capacity, & if such capacity is to be built by another party, the timelines would remain unaffected. In addition, if any recommendation regarding deferral of cashflows is not aligned with the expectations of Eskom’s role in terms of the final IRP, additional funding may be required to ensure complete alignment. *All choices made in the revised submission are subject to government’s final Integrated Resource Plan Introducing more IPPs after the MYPD 2 period, in a longer term plan, means capital expenditure for the following projects is now excluded from MYPD2 Coal 3 Nuclear We will optimise the following build projects within reasonable timeframe given contractual and funding constraints Kusile power station Sere (wind) power station We recommend delaying DoE’s IPP until after MYPD2, based on our revised demand forecast All choices made in the revised submission are subject to government’s final Integrated Resource Plan 15 JOH-ESK029-20091019-AG-P1 15

Choices and assumptions: Operating costs Cost Reductions During the MYPD2 period, Eskom will work to reduce its overall costs by >R12bn We will further reduce operating costs by R6.9bn Reduced demand from DSM will result in R3,4bn in projected primary energy savings over the period We will further reduce primary energy costs by R1.6bn Maintenance and road repairs to be excluded after the first year, and covered by provincial government or SANRAL (Eskom to pay a shadow road toll for coal haulage) These are highly ambitious stretch targets 16 JOH-ESK029-20091019-AG-P1 16

Choices and assumptions: Additional funding New sources of funding We have assumed total borrowings of R123bn over the MYPD2 period: R40bn in 2010/11 R43bn in 2011/12 R40bn in 2012/13 Compared to our September submission, we are assuming additional borrowings of R8.5bn We also assume we will source private sector equity of at least R20bn within 24 months – and our target will be R40bn if possible However, the current funding plan still requires an additional R7bn for FY10/11 and FY11/12, to close the R14.1bn cash shortfall Interest cover will reach the targeted ratio of 3 by FY12/13, improving financial flexibility 17 JOH-ESK029-20091019-AG-P1 17

Country risks as a result of these choices Implication Demand Faster recovery in economic growth and electricity demand Potential insufficient capacity to meet demand Potential delays to Kusile, Sere, Nuclear 1, Regulatory framework for IPPs not put in place in time Potential insufficient capacity to meet demand Capacity Primary energy Dependency on 3rd party for road quality (timing and safety) Coal delivery, safety and power outages Financial risk of not realising efficiency gains sustainably Slowdown in maintenance activities Further cash flow challenges Compromising maintenance and security of supply Cost reductions Additional Funding Assumed high level of borrowings Access to equity Cash flow challenges Need to re-phase capital investment programme Participation of all stakeholders necessary to manage risks, as not all risk within Eskom’s control Last resort, to re-open price determination 2018/11/17 18 JOH-ESK029-20091019-AG-P1 18

What the tariff increase will mean for Eskom’s customers 6 What the tariff increase will mean for Eskom’s customers Average monthly electricity charges Rand FBE excluded Typical township household 2 386 Typical suburban household 1 777 1 326 7 172 5 344 3 989 2 980 Typical small farm 2 258 18 036 13 457 10 063 7 532 5 911 Small-medium commercial 2008/09 09/10 10/11 11/12 2012/13

The role of Eskom and stakeholders Government Publish a country electricity plan for the next 20 years, clarifying the role of Eskom and IPPs Clarify policy on renewable and nuclear energy Create an enabling framework for funding and implementing DSM Promulgate regulations to implement PCP Ensure funding to maintain roads to transport coal Take account of the key role Eskom plays in the economy NERSA Approve and publish rules for the following Cost recovery mechanism (approved on 26 November 2009) Procurement for renewable energy Power conservation programme Set a tariff path for completing the build programme and introducing IPPs SANRAL/ provincial government Ensure repairs and maintenance of roads on which coal for certain power stations is transported

The role of Eskom and stakeholders Independent Power Producers Commission the capacity indicated in the medium-term power purchase programme and the first phase of the renewable energy feed-in tariff programme Commission the required capacity on time, based on the country plan Ensure 86% energy availability is achieved for current power stations (excluding RTS) Commission return to service plants as planned Finalise power purchase agreements for IPPs (subject to cost recovery mechanisms and tariff level) Implement DSM programmes Support customers with education on energy efficiency Eskom Customers Large industrial and commercial customers to confirm their energy base-line and targeted savings to provide greater demand certainty Make changes in behaviour and technology to bring down electricity utilisation Consider an overall target of 8 - 15% energy efficiency improvements for the country over five years

Managing these trade-offs will require a compact involving all stakeholders Develop a country electricity plan Put all required regulation in place Enable demand side management programmes Change behaviours to save energy Customers Approve funding mechanism and tariff path to complete the new build Government NERSA Ensuring a secure and sustainable future SANRAL/ provinces IPPs Invest in new capacity, based on the country plan Ensure maintenance of roads on which coal is transported Eskom Build new plants on time Run plants efficiently Finalise IPP purchase agreements

MYPD2 needs to be seen in the context of a long-term country vision South Africa needs to define overarching objectives for the long term success and sustainability of the economy and the electricity industry The contribution of various parties to the solution is required, and their respective roles should be made clear An enabling environment is also required to attract new entrants to the market A collaborative effort is required between Government, Eskom and all stakeholders - including business, communities and customers Eskom should focus on what is within its own capability and capacity, while other role players execute their own specific mandates 23 JOH-ESK029-20091019-AG-P1 23

Conclusion The value proposition of this application remains unchanged Ensuring continuous supply of power Setting a foundation for a cleaner and greener future Building capacity for SA’s future needs Empowering industrial development and economic growth Creating employment opportunities Building confidence in the future

Thank you

Depreciation MYPD1 Vs MYPD2 R’bn 2006/7 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13 MYPD 1 2,8 3,9 5,6 6, 2 MYPD2 30,3 32,8 37,2 Table on page 86 of ESKOM’s application. There’s a number of variables at play It is a complex matter that ESKOM still requests time to respond in detail. Regulator should allow allow prudently incurred costs and a reasonable return to ensure investment into the industry and sustainability The regulatory framework and methodologies should achieve these objectives in an effective manner Issue is what is best mechanism to achieve objectives