Management of Change Report Errors to Management.

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Contractor Safety Management
Auditing Computer Systems
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Temporary Configuration Change Mike Hayes Exelon Nuclear.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Controlling Hazardous Energy
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
BUILD WITH US. ™ Contractors
SQF ISO FSSC GMP Programs
EHS Management System Elements
West Virginia University Laboratory Training Module 1. OSHA Laboratory Standard.
Elements of Process Safety Management
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
Process Safety Management
Company duties under the ISM Code
Section 54’s 54.Inspector’s power to deal with dangerous conditions – (1) if an inspector has reason to believe that any occurrence, practice or condition.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Presentation on Preventive Maintenance
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Unit 4: Operational Phases and Implementation. Unit 4 Objectives  Explain the four phases of continuity and relate their application to the continuity.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.

External Provider Control
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
Incident Reporting And Investigation Program
Managing Safe Work Permits
Lock Out & Tag Out.
Inspector's Role and Responsibilities
National Standards for Athletic Coaches
CHANGE CONTROL.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Energy Control Procedures Lockout/Tagout 29 CFR
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Occupational Radiation Protection during High Exposure Operations
Inspector's Role and Responsibilities
Lock out / Tag out Regulations (Standards - 29 CFR)
(Additional materials)
Clinical Engineering Lecture (3).
Safety and Security of Radiation Sources
Inspector's Role and Responsibilities
Introduction In the first lesson we demonstrated the following:-
Aviation Maintenance Risk Management Maintainer Checklist
SQF ISO FSSC GMP Programs
Incident Reporting And Investigation Program
OHS–Occupational Health & Safety
Oleh : Ir. Sjaifuddin Thahir, MSc.
Regulatory Oversight of HOF in Finland
EMS Checklist (ISO model)
Control of Hazardous Energy
Operationalizing Export Certification and Regionalization Programmes
Aviation Maintenance Risk Management Maintainer Checklist
How to conduct Effective Stage-1 Audit
Lock Out Tag Out.
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
Final Rule on Foreign Supplier Verification Programs
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Management of Change Report Errors to Management

Management of Change This presentation explains methods by which changes to the facility, process or utility, other than "like for like" substitution, will be properly evaluated for their impact on quality, safety, health, loss prevention and the environment prior to implementation and that such changes and evaluations will be properly documented. Report Errors to Management

Management of Change Types Replacements in Kind A "like for like" replacement (meets design specifications) of a system, a piece of equipment or a procedure with one identical to the one being replaced.  Process Change An alteration, whether temporary or permanent, that could affect the control or integrity of a process that goes beyond the established safe operating range, recipe or proven raw material supplier. Report Errors to Management

Management of Change Process Changes  Process Technology, such as: Raw materials, Process chemistry, Process controls or conditions, Process recipes, Order of addition, Equipment design or material of construction, Piping or equipment specifications, Process safety information. Procedures Simple edits of procedures that do not change the actual procedure itself can be done without requiring an MOC. i.e. a name change, changes in terminology, etc. Report Errors to Management

Management of Change Process Changes Operating Discipline, such as: Computer controls, Additions or deletions of alarms. Bypassing safety systems, interlocks or controls.   Modifications, such as: Addition or removal of process equipment, Addition or removal of piping, Operating conditions, e.g. impeller size, Packaging procedures. Services, such as: Equipment, Warehouse. Report Errors to Management

Management of Change Process Changes   A Process Change is NOT: A change of set points within the range prescribed in procedures, Replacement with "like for like" equipment, A change, during an emergency, that is made to allow the safe shutdown of the process or unit. This type of change needs to be documented in unit or process logbooks and returned to the pre- change status as soon as possible, Preventative or routine maintenance, if care is exercised to prevent inadvertent change, Personnel changes. Report Errors to Management

Management of Change Requirements  All changes to a process, facility or utility shall require proper documentation prior to implementing the proposed change. The proposed change might be as simple as increasing the inventory of a certain chemical or as severe as bypassing an equipment interlock due to an outage. Generally, any change will require the origination and approval of proper forms An entry in an “operations log book” does not qualify as proper documentation of change. Once approved, the forms will be routinely reviewed. Copies of the approved forms shall be maintained to facilitate these reviews. Report Errors to Management

Management of Change Forms Maintenance Work Order Form: A written work order system shall be used for all routine cases of repair, in kind replacement or similar actions. The work order shall include an inspection component to give the originator an opportunity to identify a true “change.” Proper documentation of this type of work is necessary to ensure that all employees can routinely identify when it does occur. The Work Order Form may be originated by any employee, and must be approved by the Facility Manager or his designate. The “Manager’s Section” may only be completed by the Facility Manager.   Report Errors to Management

Management of Change Procedure Submitting a Management of Change Request A “Management of Change” form must be completed: When there is an obvious change proposed. When individuals are not confident that they have the knowledge or skills to render a proper decision. Any employee may originate this form, that must be approved by two managers. Authority to release a proposed change for implementation is prohibited until the Facility Manager confirms that approval has been achieved. All Work orders must be closed out in a timely fashion, and retained for auditing purposes. Report Errors to Management

Management of Change Procedure  Conditions of Approval: In certain circumstances supplementary conditions may be required for MOC approval. These conditions will be documented and returned with the approved MOC. All the delineated conditions must be met as a condition of approval RESPONSIBILITIES   Any individual responsible for a function may assign or delegate performance of that function to other suitably qualified people. The individual originally assigned shall retain responsibility and accountability for proper execution of the delegated activity. Report Errors to Management

Management of Change Procedure The Facility Manager shall:  Submit the MOC to the appropriate manager for approval.  Provide training to enable employees to recognize change.  Involve employees by providing the opportunity for their input in analyzing change for hazard analysis and process operability. CSP uses the following mechanisms to communicate and embrace changes: Work Orders Change notification Routinely Tuesday meetings Ad hoc meetings as needed Report Errors to Management

Management of Change Procedure The Facility Manager shall:  Properly modify operating documents and instructions so as to comply with requirements of this procedure.  Train all affected employees on the change, and their responsibilities resulting from the change. In the case of a temporary change, ensure the affected equipment/area is returned to its “pre-change” status  Document and properly maintain necessary MOC files. Report Errors to Management