By EAHC COORDINATOR Peter You

Slides:



Advertisements
Similar presentations
Southeast Asia Least Reached Peoples by Nations. Reached Progress by Nation? Based on Joshua Project data 2007,
Advertisements

Education and Training Linkages, Opportunities and Challenges The Southeast Asian Ministers of Education Organization.
7 th Meeting of the Inter Regional Coordination Committee IHB Report IRCC7-05B.
13 th Capacity Building Sub-Committee Capacity Building Development - Customized Capacity Building Programmes - East Asia Hydrographic Commission(EAHC)
Chung Hwa Middle School
MACHC16, December 2015 Hydrographic Service Leendert Dorst Structured MACHC reporting to IRCC and IHB over 2015.
MACHC CAPACITY BUILDING COMMITTEE MEETING Presented by UKHO.
PACIFIC AREA STANDARDS CONGRESS (PASC) APEC SCSC – SRB Workshop 23 June 2007 Convention Centre Cairns.
WWNWS Report to the IRCC Abu Dahbi, May, Membership and Meeting Members: Argentina, Australia, Brazil, Canada, Chile, France, Greece, India, Japan,
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
1. SCOPE EAHC Member States EAHC Meetings & Working Group EAHC Capacity Building Activities EAHC Products Action for IRCC 2.
Regional project for Capacity Building
South West Pacific Hydrographic Commission (SWPHC)
National Report – Republic of Korea
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Capacity Building Sub Committee Meeting Report for MACHC
Report of the Capacity Buildung Sub-Committee
EAHC Technical Visit to Timor-Leste 6 December 2016
Report by the IHO Secretariat
Stephen Bennett; Vice-Dean IALA WWA
NATIONAL REPORT FOR KIRIBATI
Presentation by Dr Parry Oei, Chair (CHC)
CBSC16 Goa, India, 30 May - 1 June 2018 IHO Secretariat Report
The Training in Hydrographic Survey for Disaster Management and Relief will be held in Jakarta from 11 to 15 September Venue : Mercure Hotel.
7th EAHC TRDC-BOD MEETING
1st Emergency Response Workshop Singapore, 18th October 2016
South West Pacific Hydrographic Commission (SWPHC)
10 th MEETING OF THE IHO INTER-REGIONAL COORDINATING COMMITTEE
EAHC Representative at new IHO Council
Update on the IHO CBSC 15 Peter YOU EAHC CB Coordinator
b. Training For Trainers (Hydrography)
Report on IRCC9 Key Issues Relating to EAHC
GUSTAVO ADOLFO GUTIÉRREZ LEONES
ESTABLISHMENT OF EAHC MSDI WG
GUSTAVO ADOLFO GUTIÉRREZ LEONES
Eastern Atlantic Hydrographic Commission (EAtHC)
IRCC work is guided by the IHO Work Programme 3
IHO-European Union Network Working Group (IENWG)
CBSC-16 Towards a new implementation of the CB strategy in the EAtHC region and a strengthened involvement of the IHO GOA, India, 30 May – 1 June 2018.
South West Pacific Hydrographic Commission (SWPHC)
Inter-Regional Coordination Committee
Jung Hyun Kim Republic of Korea EAHC Capacity Building Coordinator
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
South West Atlantic Hydrographic Commission (SWAtHC) Report
NATIONAL HYDROGRAPHY REPORT BY THE KINGDOM OF TONGA
Hak Yoel (Peter) YOU Republic of Korea
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
BRUNEI MEMBERSHIP STATUS
Report from TRDC BOD6 Meeting
South West Pacific Hydrographic Commission (SWPHC)
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
RSAHC REPORT TO IRCC8 30 MAY 2016
MACHC Capacity Building Update
Satellite derived bathymetry (SDB) – Risk assessment
Training, Research and Development Centre BOARD OF DIRECTORS
Report on 9th TRDC-BOD Meeting
14th South West Pacific Hydrographic Commission Conference 30 November – 2 December 2016 NOUMEA National Report Samoa.
IRCC work is guided by the IHO Work Programme 3
East Asia Hydrographic Commission (EAHC) Three Year Work Plan
EAHC-MSDIWG1 Report Presented by Mr.Jun-Shik Lee IHO MSDIWG10
EAHC-MSDIWG1 Report EAHC SC6 BALI, INDONESIA February 2019
What is Capacity Building?
10: Capacity Building 10.1 Report in the IHO CBSC Meeting & Actions
EAHC Report IRCC C Japan EAHC Chair
NATHALIA MARÍA OTALORA MURILLO
CBSC17 Genoa, Italy, May 2019 IHO Secretariat Report
Peter YOU EAHC CB Coordinator
Peter YOU EAHC CB Coordinator
Eastern Atlantic Hydrographic Commission (EAtHC)
Report of the FIG/IHO/ICA IBSC to the IHO IRCC11
Presentation transcript:

By EAHC COORDINATOR Peter You EAHC Report Marine traffic By EAHC COORDINATOR Peter You

Assessment of Capacity Building Phase Stage of Coastal States Introduction Assessment of Capacity Building Phase Stage of Coastal States Activities completed since CBSC15 Activities planned for 2018 EAHC comprises of 10 Member States; Brunei Darussalam, China, Democratic People’s Republic of Korea, Indonesia, Japan (Vice Chair), Malaysia (Chair), Philippines, Republic of Korea, Singapore and Thailand. In addition, Vietnam became an IHO Member State in March 2015, and is waiting for the approval of EAHC Membership.

EAHC Webpage : http://home.eahc.asia http://trdc.eahc.asia/

Democratic people's Republic of Korea Assessment of Capacity Building Phase Stage of Coastal States Country / Territory NHC or NHCC CB Phase 1 CB Phase 2 CB Phase 3 Last TV Brunei Darussalam 1 2014 China 4 N/R Democratic people's Republic of Korea -1 Indonesia Japan 2 Malaysia Philippines Republic of Korea Singapore Thailand Cambodia* 2017 Timor-Leste* 2016 Vietnam** * Impending IHO MSs ** IHO MS but impending EAHC MS

Activities completed since CBSC15 IHO CB Activities s/n Title Venue Date Status 1 ROK Category B Programme (3rd Phase) ROK (TRDC) 3 – 28 Jul. 2017 Completed 2 Hydrographic Survey for Disaster Management and Relief Indonesia 11 – 15 Sep. 2017 3 2nd Training for Trainers- Basic Hydrography (TFT Hydro) 4 – 15 Dec. 2017 4 LiDAR and Satellite Derived Bathymetry Workshop Japan 30 Jan. – 1 Feb. 2018

Non-IHO CB Activities Activities completed since CBSC15 1 s/n Title Venue Date Status 1 EAHC Marine Spatial Data Infrastructure Symposium ROK 22 – 23 Nov. 2017 Completed 2 Training for Ocean Observation and Hydrographic Surveying 31 Aug. – 23 Sep. 2017

Activities planned for 2018 s/n Title Venue Date Status Use of GNSS for Tide Correction for Survey Indonesia 9 – 13 Jul. 2018 Planned 2 Carto Production DB System Development Workshop China 3Q 2018 ( Subject to IHO CB Funding) 3 Technical Visit to Timor Leste Nov/Dec.

Many training activities were delivered in 2017 in the region Conclusions Many training activities were delivered in 2017 in the region but there is still a significant level of technology gap among the ten MSs. Developing countries need continuous CB activities to enhance their basic capacity in hydrographic surveying and charting. EAHC region is one of the areas with largest marine traffic in the world, Capacity building in managing maritime safety information (MSI) and Risk assessment was raised and reflected in the submissions for 2019 CB activities accordingly.

Thank you