Water Services Trust Fund

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

Sanitation is Business
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
ENVIRONMENTAL MANAGEMENT PLAN
Water Services Trust Fund UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot & household.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
UBSUP : Area Assessment and Site Selection Prepared by the UBSUP Team July 2014 WATER SERVICES TRUST FUND (WSTF) 1 ‘’Good area assessment and selection.
Water Services Trust Fund Training Workshop for Field Monitors Team Hierarchy, Communication within the Field Monitors Team & Communication with the WSTF.
Water Services Trust Fund SafiSan Projects: The Project Task Team
Water Services Trust Fund UBSUP Projects: The Project Task Team
Water Services Trust Fund The Urban Projects Concept (UPC) Fast-tracking & up scaling provision of water and sanitation services to the urban poor Eng.
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition and main Roles and Responsibilities 1 Project Task Team: Multi-stakeholder,
Designing Public Participation in Environmental Impact Assessment Presentation & Exercise.
Water Services Trust Fund Tools for the County Resident Monitor The SafiSan Toolkit 1 posters, workshops, procedures, banners, programmes, pictures, pee,
Water Services Trust Fund Social Animators & Field Monitors Training Workshop The Water Services Trust Fund: Functions, Mandate, Urban Window, WSTF Support,
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
The Sanitation Team Business Model Water Services Trust Fund.
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition, Roles and Responsibilities 1 Project Task Team: Multi-stakeholder; composed.
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
Water Services Trust Fund (WSTF) UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot &
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
Regional Seminar 2005 EVALUATING POLICY Are your policies working? How do you know? School Development Planning Initiative.
Water Quality Training for Small Systems: Working Together to Develop a Common Sense Approach Bill Schutzman Government of Canada Water Safety Conference,
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Water Services Trust Fund The Financing Contract Clarine Bowa 1.
Assessment of Technology Options 1 Naomi Radke, seecon international GmbH.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Planning & Presence Operation of water supply schemes for the urban.
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Finance & Business Models Prepared by the UBSUP Team.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) UBSUP Finance & Business Models The UPC Team 26 th June 2014.
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
WEDNESDAY 27 NOVEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB.
FRIDAY 29 NOVEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
UEmploy Consultancy for Employment Inclusion
Pre-planning Planning to plan (and adapt) Implementation starts Here!
Water Services Trust Fund Field Monitors Training Workshop
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
Sanitation is Business
Objectives of the Training
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
The Sanitation Team Business Model
Up-scaling Basic Sanitation for the Urban Poor (UBSUP) in Kenya
Module 1 Assemble the WSP team
Fiscal Mapping Community of Practice
The Key to Hiring Excellence “The act of working together to achieve a common purpose.” —Oxford Dictionary.
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Product Development Scenario Overview
Communication and Consultation with Interested Parties by the RB
DTF implementation Roles and responsibilities
WATER SECTOR TRUST FUND
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
The UBSUP/SafiSan Programme
Water Sector Trust Fund
WWater reuse Water Directors 24/11/2014 Nicola NOTARO
Chapter 16 Planning and Management of Health Promotion
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Introduction to the Review of the SI MQs NatSIP Associate/Scrutiner
Hannah Clarke, sparqs Steph Kirkham, sparqs
New Tyre Industry Career Pathing Research 16 April 2019
Service Requests New Proposal CSA Service Requests AA Service Requests
Technology Maintenance
Service Requests New Proposal CSA Service Requests AA Service Requests
Energy & Materials Flow & Cost Tracker (EMFACT)
Presentation transcript:

Water Services Trust Fund DTF Site Selection and Design Adaptation Workflow and Stakeholders 11/15/2018

Content Introduction Project Initiation Awareness Meeting Feedback Meeting DTF introduction, Site Selection and Surveying Training Site Selection and Surveying Site Approval Detailed Site Surveying DTF Design Adaptation Training 11/15/2018

Introduction DTF is intended to enhance public health conditions in low income urban areas DTF is intended to close the sanitation value chain by treating the human waste generated in low income areas (also the UDDT matter) Most neglected and most important component of the sanitation value chain Purpose of the presentation Understand the different stakeholders that are relevant in the site selection and design adaptation workflow stages 11/15/2018

Step 1: Project Initiation Set up of the WSP internal DTF Technical Team Set up of a WSP internal “DTF technical team” within the company comprising of staff with the required mix of competencies by the MD If required, external consultants e.g. surveyors are incorporated in the DTF technical team Establish a close collaboration with required external stakeholders Tools required: Site selection and surveying Stakeholders: MD, WSP DTF technical team 11/15/2018

Step 2: Awareness Meeting DTF Technical Team in collaboration with the Pro-Poor unit (Sanitation Department) initiates identification of LIA that requires a DTF Pro-Poor unit together with DTF technical team consults with local key stakeholders about their perception of having a DTF in their vicinity as well as identifying potential locations Stakeholders: Pro-Poor unit, DTF technical team, Area Chief, Elders, Residents, PHO, NEMA and WRMA 11/15/2018

Step 3: Feedback Meeting Pro-Poor unit and DTF technical team present the opinions of the residents of the targeted LIAs regarding having a DTF and proposed potential sites to the WSP top management Stakeholders: Pro-Poor unit, DTF Technical Team, Managing Director, Technical Manager, Financial Manager, Commercial Manager 11/15/2018

Step 4: DTF Introduction, Site Selection and Surveying Training WSTF trains DTF technical team on DTF introduction and Site Selection Surveying Tools required: “DTF introduction” and “Site Selection and Site Surveying” Stakeholders: DTF technical team and WSTF 11/15/2018

Step 5: Site Selection and Surveying DTF Technical Team selects site by using the site selection and surveying tool in collaboration with required stakeholders EIA is carried put by a registered environmental expert. Once approval is provided by NEMA, the selected site including the filled decision matrix is presented to the MD of the WSP Tools required: Site selection and Surveying Stakeholders: CRMs, PHO, NEMA, WRMA, WSTF Flying squad (on demand) 11/15/2018

Step 6: Site Approval The WSP analyses the site selection results. MD confirms results and forwards the proposal to the WSTF The WSTF checks proposal including the DTF site selection analysis report, target group and then gives no objection Tools required: Site Selection and surveying (signed decision matrix) Stakeholders: MD, WSTF 11/15/2018

Step 7: Detailed Site Surveying If required, DTF technical team gather more details on site characteristics (baseline data for design adaptation) Tools required: Site Selection and surveying Stakeholders: DTF technical team and flying squad (on request) 11/15/2018

Step 8: DTF Design Adaptation Training DTF technical team attends design adaptation training equipped with detailed baseline data WSTF coaches DTF technical team on adaptation of technical drawings and Bill of Quantities (BoQ’s) to come up with a detailed design based on local conditions Tools required: Generic technical drawings and BoQ’s Stakeholders: DTF technical team and WSTF 11/15/2018

Any further stakeholders? Poster discussion in groups (10 mins) Identification of further stakeholders that could be involved in the workflow 11/15/2018