Project Appraisal Guidelines for National Roads

Slides:



Advertisements
Similar presentations
Workshop with EU Member States: Work Package B Session 4a – Cost-benefit analysis for transport investments 3 February 2011.
Advertisements

Open Days European Week of Regions and Cities Blue Book - Guide to cost benefit analysis in transport sector JASPERS: Bringing Major Projects to Maturity.
1 Ex post evaluation of the Cohesion Fund (including former ISPA) Work Package B: cost - benefit analysis of selected transport projects Jurate Vaznelyte,
Implementing information on the costs and benefits of adaptation in a portfolio –based decision framework Alistair Hunt Department of Economics, University.
Institute for Transport Studies FACULTY OF ENVIRONMENT SINTROPHER Workshop Bruges th April 2013 Making the Case for Urban Public Transport – the.
Worked Example: Highway Safety Modeling. Outline –Safety Modeling »Safety Modeling Process –Set-up for Worked Example –Develop / Build Safety Model »Project.
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
1 Investment Appraisal Geoff Leese Sept 1999 revised Sept 2001, Jan 2003, Jan 2006, Jan 2007, Jan 2008, Dec 2008 (special thanks to Geoff Leese)
Office of State Planning and Budgeting: Capital Construction and Information Technology Projects Review and Requests June 6, 2014 Laura Blomquist.
Construction Industry Council Economic Forum Stephen Dance UNCLASSIFIED.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT The Economic Evaluation of Transport Projects Seminar Madrid, November 2010 Current.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Distillate Workshop DfT Thoughts. There’s a lot going on (even more than usual) There’s a lot I’m not directly involved in I’ll try to take quick.
School of something FACULTY OF OTHER Institute for Transport Studies FACULTY OF ENVIRONMENT Evaluating cohesion by a MCA framework : application at a TEN-T.
Slide 1 Integrating Mobility Management and land use planning: Outputs Janina Welsch (ILS), Roberto De Tommasi (synergo), Tombo Rye (TRI, ENU), Aljaž Plevnik.
8 McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
ACT CANADA 2014: Using Business Cases To Get Great Projects Financed and Delivered December 1, 2014| Michael Sutherland.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
NRA Transportation Surveys Derek Brady & Nigel O’Neill, July 2011.
FM Guidance for Design Teams MEFMA Focus Group. Team Members Neil Blakey FM Consultant, Mace Macro Stuart Clayton Project Manager, Serco Middle East Ryan.
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
CREATING THE CASE FOR MORE TRAVEL CHOICES John Bartels, City of Port Phillip and Ainsley Nigro, GHD Cost Benefit Analysis for Implementing Separated Bike.
Technical Recommendations for Highways No 12 TRH 12
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
TRACECA PROJECT EVALUATION
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
OECD Short-Term Economic Statistics Working PartyJune Establishing guidelines for creating long time series for short-term economic statistics.
1 Credit Analysis New England Directors College 2007.
Selecting Rapid Transit Modes January 22 & 23, 2008, Skhirat, Morocco Sam Zimmerman, Senior Urban Transport Specialist World Bank.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Decision Support for Biosecurity: Valuation of Biodiversity Brian Bell.
The TIDE impact assessment methodology TIDE Final Conference Barcelona, September 2015 Wuppertal Institute for Climate, Environment and Energy Oliver.
EMME Users’ Group Meeting Recent toll patronage forecasting using EMME 27 May 2011.
Faisal Naru Head of Better Regulation DAI Europe Ltd November 2007 Washington London Johannesburg Ramallah RIA – An Art and not a Science.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
ClearCube markets an alternative to traditional desktop PCs. Primary Matters developed a Sales Tool that presented to ClearCube prospects the costs and.
DESIGN CYCLE Technology Class.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
TRAFFIC STUDY AND FORECASTING SHRI DEVI POLYTECHINIC
Road Investment Decision Framework
 The 20 Year Plan for the SW Peninsula Rail Network Philip Heseltine Head of Transport, Infrastructure and Investment, Plymouth City Council On behalf.
Typical farms and hybrid approaches
Short Training Course on Agricultural Cost of Production Statistics
EWG Study Tour, Galway, 18/09/2006
What must we do in each criteria?
GCE PROFESSIONAL BUSINESS SERVICES AS 3
Demonstration of the tool
Categorization of bike sharing systems
ROADS Services Training Group
Presented by Joy Davis, ITRE TRB Planning Applications Conference
DTTAS Common Appraisal Framework
Better mobility for older people
Global and Chinese IM Software and Apps Industry, 2018 Market Research Report View Complete
Activities of the Human Resources Working Group
Global and Chinese Digital Advertising Industry, 2018 Market Research Report View Complete
Global and Chinese Telephoto Zoom Lens Industry, 2018 Market Research Report View Complete
Worked Example: Highway Safety Modeling
KEYNOTE STAGE SPONSOR.
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Western Orbital: M11 J11 Park and Ride Provision
Cost Benefit Analysis in the Transport Sector… …and Evaluations
Presentation transcript:

Project Appraisal Guidelines for National Roads TII Roadshow 2017 Project Appraisal Guidelines for National Roads Eoin Gillard Head of Strategic & Transport Planning Transport Infrastructure Ireland Transport Planning Society 22nd November 2017

Introduction

Strategic & Transport Planning Section What we do Strategic & Transport Planning Section Project Appraisal Guidance Audit of National Roads Projects Appraisal of Light Rail projects National Transport Model

TII Project Appraisal Guidelines for National Roads Objective: To ensure consistent appraisal of all TII projects and compliance with DTTAS and DPER requirements What is PAG? ‘How to’ guidelines Detailed guidance on: Transport modelling Economic appraisal MCA Standard parameters for model inputs

TII Project Appraisal Guidelines for National Roads

Structure of PAG Unit Topics discussed Detailed Info 1.0 Introduction 2.0 Appraisal Deliverables Project Appraisal Plan 3.0 Project Brief PB Template 4.0 Consideration of Alternatives 5.0 Transport Modelling Construction of Models Data Collection Forecasting Sample TM Report 6.0 CBA Scheme Costs TUBA & COBALT Sample CBA Service Areas Wider Impacts Reliability & Quality National Parameter Values 7.0 Multi-Criteria Analysis MCA Guidance PABS Template 8.0 Business Case BC Template & Sample 9.0 Post Project Review 12.0 Minor Projects (€5m-€20m) Simple Appraisal Tool 13.0 Walking & Cycling Facilities 14.0 Minor Projects(€0.5m-€5m) Minor Project PABS Template 16.0 Data Analysis Techniques Estimating AADT Expansion Factors for Short Period Counts

Minor Projects (€5m - €20m)

Structure of PAG Unit Topics discussed Detailed Info 1.0 Introduction 2.0 Appraisal Deliverables Project Appraisal Plan 3.0 Project Brief PB Template 4.0 Consideration of Alternatives 5.0 Transport Modelling Construction of Models Data Collection Forecasting Sample TM Report 6.0 CBA Scheme Costs TUBA & COBALT Sample CBA Service Areas Wider Impacts Reliability & Quality National Parameter Values 7.0 Multi-Criteria Analysis MCA Guidance PABS Template 8.0 Business Case BC Template & Sample 9.0 Post Project Review 12.0 Minor Projects (€5m-€20m) Simple Appraisal Tool 13.0 Walking & Cycling Facilities 14.0 Minor Projects(€0.5m-€5m) Minor Project PABS Template 16.0 Data Analysis Techniques Estimating AADT Expansion Factors for Short Period Counts

Minor Projects (€0.5m - €5m) – Unit 14.0

Common Issues

Common Issues in Appraisals / Business Cases Problem Definition Objective Setting Options and Alternatives Multi-criteria analysis Lack of consideration outside of Economic Evaluation

Challenges

Value of Time Dominates Average Breakdown of Road Scheme Benefits Time Savings are key High volume routes => More Benefits Potential Issues for scheme selection AADT Time Saving per user (hrs) Total Time saving (hrs/day) VoT Total Benefit (€/day) Annual Benefit (€) M50 160,000 0.0167 2667 € 11.86 € 31,626.67 € 11,543,733.33 M4 27000 450 € 5,337.00 € 1,948,005.00 N5 5,600 93 € 1,106.93 € 404,030.67

Discount Rates – International Comparison What is the value of €1M in 30 years? Country Discount Rate Value World Bank 12.0% €37,383 New Zealand 8.0% €107,328 Australia 7.0% €140,563 USA Ireland 5.0% €242,946 Sweden 3.5% €368,748 UK Germany 3.0% €424,346 Netherlands 2.5% €488,661

Discount Rates – Alternative for Road Schemes? TII research on the use of hyperbolic discounting as transport projects have a longer lifecycle  M4/M6 Worked Example Exponential 30 years Exponential 60 years Hyperbolic 60 years Combined 60 years PV Benefits 1,357 2,846 2,959 3,576   PV of Capital Costs 1,490 NPV -133 1,356 1,469 2,086 BCR 0.91 1.91 1.99 2.40

Future Considerations How to justify low volume road schemes in complex environments Appraisal of technology in transport – is VoT the answer? Cross cutting effects – transport influenced by or enabling other policies Is transport appraisal a victim of its own success?

Thank You