Copyright 2010-2011, Facade Works Inc - www.facadeworksinc.com Drained/Back-Ventilated Rain Screen System.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Exterior Window and Door Frames
Common Components of a Traditional Wood Framed Building
Unit 43 Wall Framing Wood-framed Wall Components • Constructing Wood-framed Walls • Sheathing Exterior Walls • Weather Barriers • Rainscreen Walls • Structural.
The Building Skin: SPAIGR
Chapter 16 Roofing. First line of defense against the weather Precipitation (Rain, snow) Sun Thermal Transmission Subjected to extreme heat and cold Surface.
Moisture Control. Indications of Excessive Moisture Condensation,frost or ice on the inside surface of windows Damp spots on ceilings or inner surfaces.
Introduction To Trim Copyright © Texas Education Agency, All rights reserved.
HVAC523 Heat Sources.
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
FACADE CLADDING TEAM: ERZ BUILDING TECHNOLOGY 4
Masonry Veneer Curtain Walls
Welcome to Hardie 101 Basic Training
Showroom and Design Center 5300 E Arrowhead Parkway Sioux Falls, SD
What is Cornice?.
Basic Refrigeration Cycle
Designing Cladding systems
Installation. Indoor Unit Installation Typical Installation.
Building Enclosure Moisture Management Institute (BEMMI)
Fiber Cement Panels as Rain Screens
Walls Ron Gatepain constructionsite.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
The Benefits and design of Rain Screen Wall Systems
Finishes and Features.  Shingles are small units of roofing that are laid on a roof  There are many types of shingles: 1.Wood shingles  They last between.
October 3, 2006 PARAPET TERMINALS 1 This slide series addresses post spacing and barrier terminal issues. Bright coloration of the following slides is.
DESIGNING WITH CURTAINWALL AND STOREFRONT
Aluminum Extrusions 21 Cladding With Metal and Glass
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
Lecture 22- Exterior Cladding Systems a.k.a skins ARCH 330 Materials & Methods Fall 2008.
IND 5615 – B UILDING S YSTEMS FOR I NTERIOR D ESIGNERS C ASE S TUDY : CHAPMAN GRADUATE SCHOOL OF BUSINESS Thermo Comfort: Heating & Cooling Systems A SSIGNMENT.
Condensation Piping and Installation Drain Pans
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Attic Ventilation WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Objectives : ANALYZE home maintenance techniques.
Installation. Indoor Unit Installation Typical Installation.
Topic C1 Superstructures - walls
1 Steps to Healthier Homes n Keep It: Dry Clean Pest-Free Ventilated SafeContaminant-Free Maintained.
Ausvaitn heavyweight use_model name: symphony pro.
Chapter 21 Cladding with Metal & Glass
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Installation. Indoor Unit Installation Typical Installation.
Building was designed for optimized material use The materials were chosen for their durability and low maintenance requirements.
TRENTON Casing Filler Presentation
Air Leakage and Water Vapor Control Chapter 6. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
The Ins and Outs of Metal Rainscreen Wall Systems
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 9 OF 10 Finish Material and Detailing SPONSORED BY:
TOTAL PROTECTION. TOTAL CONFIDENCE. Owens Corning ® Total Protection Roofing System ®^
Ventilation Solutions For Steep-Slope Commercial Roofing.
Learning Outcome Lesson Objective
APPLICATIONS OF TECHNOLOGY
Learning Outcome Lesson Objective
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Attic Ventilation WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov ROOFING, FLASHING AND ATTIC VENTILATION Roofing, Flashing, and.
Cavity Wall Construction
CONCRETE AND SUSPENDED TIMBER
Common Components of a Traditional Wood Framed Building
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Wood Frame Systems Civil Engineering and Architecture®
Building Construction I Sofia Sebastian 1
Arch205 building construction Windows- glazed curtain wall, skylights
II REVIEW.
DOOR & WINDOW.
Stone rain screens.
MODULE 9 – Building Envelope
Thermal Bypass Checklist Round-Table
TRENTON Casing Filler Presentation
Details These are drawings of specific elements where the designer wants to provide more detailed information than can be seen in the larger drawings.
Common Components of a Traditional Wood Framed Building
KWILA HARDWOOD DECKING INSTALLATION GUIDE
VITEX HARDWOOD DECKING INSTALLATION GUIDE
© OnCourse Learning.
Presentation transcript:

Copyright , Facade Works Inc - Drained/Back-Ventilated Rain Screen System

Copyright , Facade Works Inc - OBJECTIVES What is Drained/Back Ventilated rainscreen? What is Drained/Back Ventilated rainscreen? Components of Exterior HPL panels. Components of Exterior HPL panels. Rainscreen details and installation methods. Rainscreen details and installation methods.

Copyright , Facade Works Inc - The Rain Screen Principle Water/Moisture Control Water/Moisture Control Ventilation Ventilation Breathability Breathability Drained/Back-Ventilated Rain Screen

Copyright , Facade Works Inc - RAIN SCREEN

Copyright , Facade Works Inc - When it rains…. Panels deflect most of the rain water Panels deflect most of the rain water Only 15% of the rain enters the cavity & exits at the perforated vent at grade Only 15% of the rain enters the cavity & exits at the perforated vent at grade Less than.5% reaches the weather barrier Less than.5% reaches the weather barrier Moving air through the cavity helps remove condensation Moving air through the cavity helps remove condensation Gap Size between Panels is 5/16 or 8mm Gap Size between Panels is 5/16 or 8mm

Copyright , Facade Works Inc - D/B-V Rainscreen Based on 2 separate leafs (Outer and Inner) Outer = First line of defense, Water Control Outer = First line of defense, Water Control Inner = Secondary line of defense – moisture barrier, Vapor/Air Barrier, insulation, structural Inner = Secondary line of defense – moisture barrier, Vapor/Air Barrier, insulation, structural

Copyright , Facade Works Inc - Ventilation & Breathe-ability Open joints and openings at top & bottom of façade. Open joints and openings at top & bottom of façade. Constant air flow dries up any moisture/rainfall left inside the cavity Constant air flow dries up any moisture/rainfall left inside the cavity Ventilation cavity allows hot air to flow upward and out of cavity without penetrating or migrating through wall. Ventilation cavity allows hot air to flow upward and out of cavity without penetrating or migrating through wall.

Copyright , Facade Works Inc - Solar Protection - Air moving through the cavity prevents heat accumulation cooling the inner layers of the wall assembly Solar Protection - Air moving through the cavity prevents heat accumulation cooling the inner layers of the wall assembly Reduces the demand for cooling energy. Reduces the demand for cooling energy. When cold - Air flow in cavity is heated by building thus causing any condensation or any penetrating rain to dry. When cold - Air flow in cavity is heated by building thus causing any condensation or any penetrating rain to dry. When the sun shines.. or when its cold

Copyright , Facade Works Inc - Components of VRS Panel Panel Vertical Support Members Vertical Support Members Compartment-ized air cavity Compartment-ized air cavity Breathable Weather Barrier Breathable Weather Barrier D/B-V Rain Screen System Details

Copyright , Facade Works Inc - Improper Installation Insufficient Ventilation = Oxidation Insufficient Ventilation = Corrosion, dry rot, mold, mildew

Copyright , Facade Works Inc - HPL Rainscreen Installation Methods Exposed Fastener Systems Exposed Fastener Systems Concealed Fastener Systems Concealed Fastener Systems

Copyright , Facade Works Inc - Facades Construction Details Horizontal Sections Alu-Substructure Riveted

Copyright , Facade Works Inc - Minimum of 1 between laminate panel and substrate Ventilation Cavity

Copyright , Facade Works Inc - Base Required clearance of 2-4 above ground level to insure adequate air intake. Base capped with a ventilation profile

Copyright , Facade Works Inc - Parapet Top must have a minimum of ¼ clearance between the parapet and panel for proper ventilation Air flow is from bottom to top

Copyright , Facade Works Inc - Vertical Panel Joint

Copyright , Facade Works Inc - Visible Mechanical Fastenings Exposed Fastening Rivets or Screws

Copyright , Facade Works Inc - Fastening With Rivets Color coated rivets on an aluminum extruded carrier rail. Finished product with open expansion joints

Copyright , Facade Works Inc - HPL Panels with screws on Wood Substructure Rear Ventilation Rain Screen Weather / Air Barrier Substructure Option insulation Airspace Between #1 or 3 or 1 Weather Barrier Insulation Framing

Copyright , Facade Works Inc - Aluminum Substructure Weather Barrier Insulation HPL Panels with rivets on Aluminum Substructure

Copyright , Facade Works Inc - Each panel should have one fixed point (the hole is the same size as the shaft diameter of the fastener), and the remaining holes are sliding points (the hole size is 1-2mm larger than the shaft size of the fastener). This allows for hygric movement of the panel. Screws should not be over tightened or countersunk. HPL panel manufacturers should be consulted when calculating edge spacing and fastener spacing. Installation

Copyright , Facade Works Inc - Concealed Fastener Systems Allows for clean, aesthetic design Allows for clean, aesthetic design Clips attach to back of panel with rivets, then mount on rail system Clips attach to back of panel with rivets, then mount on rail system More labor intensive installation More labor intensive installation

Copyright , Facade Works Inc - Concealed Fastener System Details