Grand Hyatt Manchester, San Diego, CA USA November 2001 doc.: IEEE 802.15-01/468r0 July 2014 91st Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks July 13-18, 2014 Grand Hyatt Manchester, San Diego, CA USA Robert F. Heile, ZigBee Alliance Robert F. Heile
802.15 Organization Chart July 2014 To add your name 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting 802.15 Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 Working Group Technical Editor James Gilb New Projects (WNG), Maintenance, Rules Pat Kinney, Kinney Consulting Study Groups/Interest Groups Study Groups: Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories Visible Light Comm follow-on (LED) Chair: Yeong Min Jang Kookmin University Interest Groups TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Dependability (of Radio Links) Ryuji Kohno, 6Tisch Chair: Pat Kinney, Kinney Consulting Task Groups TG3d 100Gbps PHY Thomas Kuerner, Chair Technische Universität Braunschweig TG8 Peer Aware Communcations Miung Lee, CUNY Chair TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio Chair TG9 Key Management Protocol Robert Moskowitz, Verizon Chair TG15.4q Ultra Low Power (ULP) 15.4 Shahriar Emami, Samsung Chair TG10 Layer 2 Routing Clint Powell Chair TG4r 15.4 Distance Meas. Tech (DMT) Dietrmar Eggart, Atmel Chair x x Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 13-18, 2014 TASK GROUP 3d –100Gbps THz PHY Review and Discuss Contributions Update Project Plan/Timeline TASK GROUP 4n –China MBAN Completed initial letter ballot Resolve Letter Ballot comments Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 13-18, 2014 November 2001 doc.: IEEE 802.15-01/468r0 July 2014 San Diego Session Objectives July 13-18, 2014 Task Group 4q: 15.4 Ultra Low Power Amendment Finalize Initial Draft Seek approval to start Letter Ballot Update Project Timeline accordingly Task Group 4r Distance Measurements Techniques Work on Technical Guidance Doc Prepare the CFP Update Project Timeline TASK GROUP-8 Peer Aware Communications Continue work on draft Update Project Plan/Timeline Robert F. Heile, ZigBee Alliance Robert F. Heile
San Diego Session Objectives July 13-18, 2014 TASK GROUP 9 –Key Management Protocol: Work on draft Update Project Plan/Timeline TASK GROUP 10--Layer 2 Routing (L2R): Hear responses to the CFP Spectrum Resource Use (SRU) Study Group: Get approval on the PAR and CSD Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 13-18, 2014 Visible Light Comm follow-on(LED) Study Group: Hear Contributions Work on PAR and 5C THz Interest Group: Resuming Meeting at Plenaries Review ongoing mission/goals Dependability Interest Group: Discuss future of the Committee Robert F. Heile, ZigBee Alliance
San Diego Session Objectives July 13-18, 2014 6 TiSCH Interest Group Hear contributions Discuss positions for IETF90 NEW PROJECTS SUBCOMMITTEE (WNG) Presentation by Roger Marks on merging 802.15 and 802.16 Presentation by James Gilb on ULP Maintenance Standing Committee 15.4 Revision activity-Engage in resolution of comments for 1st Letter Ballot Robert F. Heile, ZigBee Alliance
July 2014 Robert F. Heile, ZigBee Alliance
Upcoming Sessions July 2014 September 14-19, 2014, Hilton Athens, Athens Greece, 802 Wireless Interim Session (TBC) November 2-7, 2014, Grand Hyatt San Antonio, San Antonio, TX, US, 802 Plenary Session January 11-16, 2015, Hyatt Regency Atlanta, Atlanta, Georgia, USA all 802 Interim Session March 8-13, 2015, Estrel Hotel and Convention Center, Berlin, Germany, 802 Plenary Session. May 10-15, 2015, Hyatt Regency Vancouver, Vancouver BC, CA 802 Wireless Interim Session.* July 12-17, 2015, Hilton Waikoloa Village, Big Island, HI, US, 802 Plenary Session. Robert F. Heile, ZigBee Alliance