Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison from to Date: 13May2017 July 2017 Name

Similar presentations


Presentation on theme: "Liaison from to Date: 13May2017 July 2017 Name"— Presentation transcript:

1 Liaison from 802.15 to 802.18 Date: 13May2017 July 2017 Name
Affiliation Address Phone Jay Holcomb, Vice-Chair Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb, Itron, Inc.

2 July 2017 Overview This document summarizes the activities of the IEEE Working Group for IEEE RR-TAG during the July 2017 IEEE 802 Plenary Meeting at the Estrel Hotel Berlin, Germany. Jay Holcomb, Itron, Inc.

3 Task Group Status (1/2) July 2017 Task Group Closing Reports:
CLOSING REPORT: TG3d 100G THZ - KURNER /0392r01 CLOSING REPORT: TG3f 60GE (60GHZ EXTENSION) - ROLFE /0330r03 CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - YOKOTA /0416r01 CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG /0436r00 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE /0442r00 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) KINNEY /0388r01 CLOSING REPORT: TG13 MGOWC (MULTI-GIGBIT OWC) JUNGNICKEL 15-17/0434r00 Jay Holcomb, Itron, Inc.

4 Study & Interest Group Status
July 2017 Study & Interest Group Status SGs CLOSING REPORT: SG 4md 15.4 REVISIONS KINNEY / IGs CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO /0415r01 CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM /0307r00 CLOSING REPORT: IG LPWA (low power wide area) - ROBERT /0441r00 CLOSING REPORT: IG THZ - KURNER /0391r00 CLOSING REPORT: IG VAT (VEH. ASSIT TECH.) - JANG /0431r00 SCs CLOSING REPORT: IETF/RULES/SC-M - KINNEY /0409r01 CLOSING REPORT: WNG - KINNEY “ (same as above) Jay Holcomb, Itron, Inc.

5 Other Group Status July 2017 Liaison Reports
LIAISON REPORT - Petrick /0440r01 LIAISON REPORT - Holcomb /0413r00 LIAISON REPORT - Godfrey/Rolf /0443r00 Jay Holcomb, Itron, Inc.

6 802.15 Meeting Close The 802.15 WG adjourned Thursday evening
July2017 Meeting Close The WG adjourned Thursday evening The next face to face meeting of the WG will be the Interim 11 – 14 September 2017 at the Waikoloa Hilton, Big Island, Hawaii USA Jay Holcomb, Itron, Inc.


Download ppt "Liaison from to Date: 13May2017 July 2017 Name"

Similar presentations


Ads by Google