ND Downstream Watersheds Comprehensive Detention Planning February 15, 2013 2nd Street / Downtown Flood Control Project Option 1F City Commission Meeting December 9, 2013 Kick-off Meeting
Option 1F Minimal Disturbance Zone (MDZ) Limited Disturbance Zone (LDZ)
Existing Conditions
Proposed with Project
Existing Conditions
Proposed with Project
Existing Conditions
Proposed with Project
Existing Conditions
Proposed with Project
Existing Conditions
Proposed with Project
Visualization with Project
Base Plan
Future Consideration - Reduced Closure Length?
Future Consideration - Reduced Height?
Base Plan
Future Consideration - Reduced Height?
Future Consideration - Reduced Height?
Recommended Motion Concur with the recommendations of PWPEC and approve the Option 1F as the preferred alignment for the floodwall and 2nd Street, as well as approving the removal of 3rd Avenue North between 2nd and 3rd Street N.