DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Project Appraisal Module 5 Session 6.
Environmental Impact Assessment for Waste Treatment Options
SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
18 February Anaerobic Digestion On-farm AD Planning Permission and Environmental Permitting.
Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
Hinkley Point C: Consultation on Preferred Proposals – Presentation 1 Hinkley Point C: Proposed nuclear development Nigel Knee – Head of Nuclear Policy.
Infrastructure Planning Commission Workshop 2b Working with the IPC: Guidance and issues for promoters.
DustScan Ltd Fine PM – Only Part of the Monitoring Story Oliver Puddle DustScan Ltd 14 March 2013.
Highways Agency (DRAFT) Significance Guidance: Review and Discussion 15 November 2012 Mark Chapman Technical Director (Air Quality)
Jerevan November Tailing dams inspection Juliane Knaul Legal Expert, Agency of Mining, Geology and Minerals of Brandenburg, Germany AGENCY.
Richard Hibbert RSRL Quality, Assessment and Management Systems Manager Process management Requirements in IAEA Standards and Guides.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Environmental Impact Assessment
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Jump to first page EIAMonitoring9.07(Gajaseni,20 07) 1 Monitoring Monitoring = check of actions Monitoring plan =environmental management plan.
LAQM.PG(S)(09) – new biomass guidance. PG(S)(09) published in February Reflects changes since PG(S)(03) 2003: - biomass burning not a significant issue.
Air Quality Significance Criteria Dr Claire Holman LLP Director.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
40 th Anniversary of the World Heritage Convention International Expert Workshop on the World Heritage Convention and Indigenous Peoples September.
Air Quality in the context of positive planning Richard Oakley (Quod) Chris Whall (AMEC) 25 September 2013.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Environmental Impact Statement Workshop EPA Headquarters 20 th June 2003 The Role of Geology and Hydrogeology in Quarry Development and Impact Control.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
Ashish Kumar Brijwani (08mn24). NEED FOR ENVIROMENTAL MANAGEMENT The exploitation of mineral resources is one of the serious challenges to the degradation.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
“Coal Sector Policy Support Programme” This project is funded by the European Union Implemented by Human Dynamics Consortium TACIS Project: “Coal Sector.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
EPUK Guidance on Significance : Current and Updated Prof. Duncan Laxen Air Quality Consultants Ltd.
1 Permitting of industrial facilities in Croatia.
Bad Neighbours (land-use conflicts) Andrew Mack – Associate Director NELA WA State Conference 3 September 2015.
1 The NEMA EIA Regulations & the cultivation of virgin soil Gerhard Gerber (DEA&DP) Fynbos Forum – August 2006.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Measurement of Airborne Particulates around Sand Mines and Processing Plants Jeron Jacobson  Zachary Kroening  Kimberly Shermo Dr. Crispin Pierce  Department.
Varteg Hill – Coal Recovery and Land Reclamation Pre-Application enquiry by Glamorgan Power Ltd. Members Seminar 31/3/14.
Mitigation and Impact management
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The Extent of BLM Responsibility over Actions Occurring on Non-Federal Lands: Cultural Resources.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
SEA in the Czech Republic Prague, 24 September 2008.
Tunnelling underground space MSc Tunnelling & Underground Space Environmental management on site part 1.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
1 Meeting of Portfolio Committee for Minerals and Energy 25 March 2008, Cape Town Mineral and Petroleum Resources Development Amendment Bill.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Colleen Williams Department of Health Yorkshire and Humber Region 11 January 2008 Health in Strategic Environmental Assessment:
CONSULTING AND DESIGN FOR EXPLORATION AND EXPLOITATION IN PORTUGAL
Ascending to IED compliance
Veolia Rye House Energy Recovery Facility
Allington Waste Management Facility
EIA approval process, Management plan and Monitoring
Managing Director - Resources & Strategy
Ascending to IED compliance
Towards Modern Environmental Impact Assessment (EIA) in Uzbekistan
Nick Bonvoisin Secretary to the Convention on the
Updating the Article 6 guide Outline of envisaged changes
Presentation transcript:

DustScan Ltd Planning Consent for Mineral Works Oliver Puddle 25 September 2013

CONTENTS Examples of Planning Applications Examples of Mineral Works Mineral Planning Process Environmental Impact Assessment (EIA) National Planning Policy Framework (NPPF) Dust Assessment Study (DAS) Dust Management Scheme/Plan (DMS/DMP)

Planning Consent for Mineral Works As in any planning matter that might affect air quality, whatever the sector of industry, the key concern at the outset is to understand the current setting and the proposed activities

Mineral Planning Applications New site Extension to existing workings Significant change to existing site operations Review of Mineral Planning Permission (ROMP) review – every 15 years

Surface Coal Mine

Roadstone Quarry & Asphalt Plant

Sand Pit

Sand Pit & Building Supplies Compound

Limestone Quarry

Limestone Quarry & Cement Works

Proposed Quarry

Quarry - Entrance

Mineral Planning Process Scoping report of proposed development by applicant Scoping opinion from MPA – NPPF or MTAN1 (Wales) EIA inc. Dust and Air Quality Assessment, in accordance with 2011 EIA Regs (not always required) EIA might suggest modifications to proposed development Planning application to LA supported by ES (EIAs)… Consent? Not always a straightforward process!

Sand & Gravel Quarry near Housing

Mineral Planning Process The primary objective of a planning application is to obtain planning permission Applications are therefore usually only submitted when there is a good chance of consent being granted ES must be adequate – further information might be requested which could delay planning process EIAs assess the impacts of the proposed development and if necessary suggest amendments and/or mitigation to reduce the likelihood and magnitude of impacts Robust EIAs can increase the chances of a planning application being successful

Environmental Impact Assessment (EIA) Can include assessments for dust and air quality, landscape, noise, vibration, odour (e.g. landfill), geology, ecology etc. – All come together to form ES Aim of assessments to demonstrate that the proposed development will not cause harm and will not lead to exceedences of official limit values (e.g. AQOs) or cause nuisance Assessments should be undertaken with reference to NPPF and other relevant best practice guidance Defra LAQM.TG (09) & PGNs inc. PGN 3/08 (12), Arup (1995), MIRO/AEA good practice guide (2010) etc. IAQM construction dust guidance (2012)

National Planning Policy Framework (NPPF) Replaces MPS2 & resurrects Arup report! MPAs expected to ensure proposals do not have unacceptable adverse effects on the natural or historic environment or human health or cause nuisance Conditions may be attached to sites working in close proximity to communities (e.g. programme of work, location of plant and separation distances) Dust emissions should be controlled, mitigated or removed at source – DAS (EIA)

Examples of dust-sensitive facilities (NPPF) The relationship of the activities within mineral works to surrounding land uses varies from site to site Examples of dust sensitive facilities (after Ireland M, 1992)

Site Assessment Flow Chart (NPPF) Site Assessment Flow Chart to determine the potential impact of quarry processes on local air quality (PM 10 )

Dust Assessment Study (DAS) Usually visible nuisance dust (directional soiling and/or deposition) and PM 10 for mineral works NO 2 & NO x also if significant change in HGV movements Baseline conditions must be established – monitor? Identify site activities that might lead to dust emissions Identify site parameters which might increase impacts Recommend mitigation measures, modify design? Monitor and report emissions to ensure compliance and to aid complaint investigations - DMP

Baseline Conditions

Dust Assessment Study (DAS) Potential impacts of a proposed development can be assessed by: Comparisons with similar sites or interpreting monitoring and/or weather data (use any existing data if available) Investigating complaints records Demonstrating compliance with site conditions & AQOs – Custom and Practice guidelines for nuisance dust Estimating residual effects after mitigation Professional judgement of consultant

Dust Management Plan/Scheme (DMP/DMS) Often recommended by DAS and recommended by condition Mitigation – dust containment, suppression etc. Site diary – activities etc. Dust and weather monitoring – trigger limits Robust complaints procedure Liaison Committee DMPs/DMSs should be regularly reviewed

Consent? Realistic planning proposal inc. afteruse - MPA Comply with best practice guidance Site specific DMS/DMP Implement mitigation measures & review efficacy Monitor emissions where appropriate Public Inquiry appeal? Expert Witness? Demand for housing & roads requires minerals!

Thank you / Questions? Oliver Puddle 25 September 2013