FMC SPILL SITE July 11, 1996: Tanker truck turned over spilling 6000 gallons (23000L) gasoline 500ft (150m) North from Bear Creek Emergency Response Team.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Two Special Right Triangles
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Demonstration of Subaqueous Disposal of Mill Waste Dave Hinrichs, NewFields Mark Doolan, U.S. EPA Chris Wienecke, ATT Sunoco and Jasper County Group R.
In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Druck- und Temperaturmesstechnik Testing Procedure MH-2 Mobile Hydraulic Testing Procedure 1 Pressure Transmitter MH-2.
1 1 North Central USA South Central USA Northern Europe Western Europe Eastern Asia Southeast Asia 24 x Node CDN.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
BoRit Asbestos Superfund Site
The basics for simulations
Bethany Kurz Energy & Environmental Research Center.
15. Oktober Oktober Oktober 2012.
Squares and Square Root WALK. Solve each problem REVIEW:
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Fultz Landfill Site Remediation Ohio by Simon Taylor.
Week 1.
A SMALL TRUTH TO MAKE LIFE 100%
Groundwater Remediation Thanks to Phil deBlanc, Groundwater Services, Inc.
Remediation is Enhanced Oil Recovery: Know Your Source G.D. Beckett, R.G., C.HG. A QUI- V ER, INC. & SDSU
Environmental Geotechnology Presentation Site OT-16B, Shaw Air Force Base, South Carolina, USA By Oliver Edwards And Alaric Shenton.
Plaistow, New Hampshire
Water Underground.
Dale T Littlejohn Senior Geologist. What is fate and transport in the vadose zone? Vadose Zone Hydrocarbon release from buried pipeline Aquifer Surface.
“That’s Not A Levee Boil !” or “How to do more with less” By Glen Pearson, Northern District 2005 Annual Geology and Groundwater Meeting Geology and Groundwater.
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
Manatee Power Plant: Chlorinated Solvent Leak Presentation Tom Miles Oliver Read.
Welcome Domestic Well Owners Workshop Sponsored by The Nevada Water Resources Association Spring 2011.
Rhode Island Department of Environmental Management
Fate and Transport of Chemicals A Presentation by Terrie Boguski Technical Outreach Services for Communities (TOSC) Great Plains/Rocky Mountain Hazardous.
Sand clay Hydraulic Capture clay piezometric surface.
Groundwater Hydrology Rachel Clark, P.E. Environmental Compliance Coordinator KPB Risk Management.

EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
1 Case Summary: Electrical Resistance Heating ICN Pharmaceuticals, Inc. Portland, Oregon Jennifer Sutter, Project Manager Oregon DEQ EPA Technology Innovation.
Garey A. Fox, Ph.D., P.E., Derek M. Heeren, Michael A. Kizer, Ph.D. Oklahoma State University Evaluation of Alluvial Well Depletion Analytical Solutions.
US Army Corps of Engineers Philadelphia District Groundwater Modeling.
Underground Water.
Introduction to NAPLs Review of general concepts
Lecture Notes Applied Hydrogeology
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Subsurface Water unit volume of subsurface consists of soil/rock, and pores which may be filled with water and/or air total porosity= volume voids/total.
Ground Water. Makes up 0.397% of Earth’s Water. - song.
1 LOCKFORMER ELECTRIC RESISTIVE HEATING CASE STUDY U.S. EPA Emergency Response Branch Steve Faryan, On-Scene Coordinator ,
DNAPL Recovery System July 2010 Progress Meeting McCormick & Baxter Superfund Site Portland, Oregon.
Bioremediation and Bionanotechnology Part 2 Dr Russell Thomas, Parsons Brinckerhoff 19 th May 2010.
Groundwater Water Table Recharge Groundwater Hydraulic Gradient
Types of Aquifers Unconfined aquifer open to Earth’s surface and to infiltration Confined aquifer overlain by less permeable materials EXPLANATION Unconfined.
Water Cycle, Groundwater, Aquifers, Caves
Modeling Subsurface transport of oil-field brine at the USGS OSPER “A” Site, Oklahoma William Herkelrath and Yousif Kharaka U.S. Geological Survey.
Environmental Science Lab “Groundwater Pollution” Recall from last day: – POROSITY refers to the amount of space between particles of soil – Fluid stored.
Water In what ways have you used water today? How much water is used to make a 1KG burger?
Subsurface Drainage (Tile) Design Thomas F. Scherer NDSU Extension Agricultural Engineer (701)
David J. Berestka, PE Remedial Design Engineer, Tetra Tech EM Inc.
Aquifer Test Analysis Carter Lake, Iowa
Groundwater Learning objectives
Well 38 Drilling & Testing Amendment
Jesse Taylor: Remington Technologies
Rapid Closure of Lingering Off-Site Plume Remediation Program in Residential Neighborhood using Horizontal Air Sparge and Soil Vapor Extraction Wells Narayanan.
From Tanker Roll-Over to NFA
Olusola Ayilara, P.E., P.G. PST-DCRP Section, Remediation Division
Presentation transcript:

FMC SPILL SITE July 11, 1996: Tanker truck turned over spilling 6000 gallons (23000L) gasoline 500ft (150m) North from Bear Creek Emergency Response Team observed no standing gasoline, rapid infiltration The ERT was unable to locate subsurface free product History CLUBB, MISSOURI, USA

FMC SPILL SITE Overturned Tanker Truck

FMC SPILL SITE 10ft (3m) dry silty sand top layer, 10ft (3m) wet sandy clay with gravel underneath Porosity ~0.4 Conductivity ~85ft/d (26m/d) Aquifer thickness ~20ft (6m) Groundwater surface ~7ft (2m) below ground surface Gradient estimated to be towards the southeast Site Geology

FMC SPILL SITE

Truck Location Spill Site

FMC SPILL SITE Contractor #1 (07/96) –Geoprobed site to identify location of free product (07/96) –Installed 4 monitoring wells –Suggested air-sparging system (State did not approve) –State noticed drillers were not licensed, equipment not registered (08/96) Chronology of events (1996)

FMC SPILL SITE

FMC –Geoprobed site, found 6 (15cm) free product along the north and south side of highway (08/96) –Installed an interceptor trench south of the highway –Recovered free product from trench (09/96) Chronology of events (1996)

FMC SPILL SITE Interceptor Trench Construction

FMC SPILL SITE Interceptor Trench Construction

FMC SPILL SITE Interceptor Trench Construction

FMC SPILL SITE Contractor #2 (09/96) –Geoprobed site to locate free product and plume (10/96) –Free product plume about 400ft (120m) long and 100ft (30m) wide –Pump test showed tranmissivities ranging ft 2 /d ( m 2 /d) –Estimated conductivity was 85ft/d (26m/d) Interceptor trench showed 3" (8cm) free product (10/96) Chronology of events (1996)

FMC SPILL SITE High levels of BTEX migrated to the stream

FMC SPILL SITE Contractor #2 (Cont.) –Installed 5 remediation wells, depth around 24ft (7m) inside interceptor trench (11/96) –Manual operation of free product recovery system started in January 1997 –Remediation system running 24h/d halfway March 1997 –Pumping rates ~18 GPM (68 L/min), creating drawdowns of ~15ft (4.5m) Chronology of events (96/97)

FMC SPILL SITE

Contractor #2 (Cont.) –Never got more than 100 gallons (378 L) of free product from recovery system (07/97) –Contractor terminated in 07/97 Contractor #3 (07/97) –Unable to continue with existing system, remediation 3 weeks down. –2 MWs showed 19 (48cm) free product –Dual Phase extraction system operative (04/98) Chronology of events (97/98)

FMC SPILL SITE Overall Pump & Treat System

FMC SPILL SITE

Poor handling of NAPL issue –Overpumping causing high drawdowns created smear zone –Needed more monitor wells downgradient –Expensive remediation (Cadillac) system but poorly designed and missing target NAPL zone Soil strata poorly defined Initial response contractors inappropriate and too slow Failed System

FMC SPILL SITE Dual Phase Vacuum Extraction