EC Assembling with Assembly Stand of THU

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

First Paper Feed Area Table Height Adjustment: There are two ways of adjusting the upper limit sensor. 1. You can put two sheets of paper on the paper.
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
ZPS Foot and Ankle Display Mini & Small Fragment Plates
Team Uno 11/11/04 Bunker Curnes Product Assembly.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Dial Caliper. The dial Caliper has seven main components: a slide scale, lock screw, thumb adjustment wheel, measuring jaws (inside & out), dial with.
McMaster rail #6709K601 McMaster linear bearing #6709K180 with guide rail suppressed.
S-band BPM prime Support Hyoung Suk Kim KNU.
Assemblies in Solidworks Simple Assembly Download 4_assembly_example.zip Open a new assembly file (use tutorial template) Click view, origins (to show.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Threads and Fasteners.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Tutorial on Machine vice
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
PRST5450-eTraining presents… Book Repair Issues: “Tipping-In”
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Bakersfield College Engineering B47. A simple motor has six parts:  Armature or rotor  Commutator  Brushes  Axle  Field magnet  DC power supply.
모니터 리프트 규격서 (HML-500) Audio & Video System, Display, Conference System.
Making Models of a Raised Garden Beds Cinder block and Wood option.
Step one: Page Border and title block. Border will be ¼” from the edge of the paper. Drawing will be done in landscape format. Title block will be 1”
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Girders fabrication: Difficulties to achieve tolerances and machining process Igor Madariaga (ESS-Bilbao) 13 September 2011 DTL mini-workshop, CERN.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
TRIO-CINEMA 1 UCB, 10/8/2010 Chassis & Avionics Stack Design Jerry Kim Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Sensor Module v1.1. Step 1: Sand edges of PCB & drill bolt holes (3mm) Use small green power drill or pillar drill (as available) Goggles Use a piece.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Effect of temperature on the ECAL's pressure Xiwei Wang / Chendi Shen
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
♣Multiplying Decimals♣
Trabecular Metal™ Reverse Shoulder Instruments Cat. No.Description Base Plate Drill, 7.5mm Cortex Drill, 7.5mm Compression.
Review Mathematics Skills
Baby-MIND Modules & Services
Fraction and decimal operation notes
Multiplying and dividing decimals
Report on construction of LP2 spaceframe endplate
Glyn Kirby Magnet AssemblyTechniques.
Development of Surfaces
Hawkeye Mechanical Design Snapshot
Dan Peterson: News on Advanced Endplate Mechanics
Step-by-step assembly instructions
Happy Monday! Establish: I can define different types of descriptive language Homework: None Journal: Use your 5 sense to describe your weekend to.
Louisiana Tech University
Assembly instructions for M-K all bolt together hoppercone kit.
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
ZPS Foot and Ankle Display
Zimmer® Periarticular Elbow Locking Plate System Workshop
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
모니터 리프트 규격서(HML-500) Audio & Video System, Display, Conference System.
McMaster linear bearing #6709K180 with guide rail suppressed
What is a Layer? Photoshop Elements 8.
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Required tools for installation of a V-1020C speaker with V-9914 bridge.
What is a Layer? Photoshop Elements 8.
Miniature Train Smoke Stack.
After service guide for changing PCB
Pole Position Student Points Time
A B C D.
Presentation transcript:

EC Assembling with Assembly Stand of THU Chendi Shen 1/21/2016 Tsinghua U.

Step1. Bottom of the assembly stand

Step2. A bottom piece for supporting the plates

Step4. place the bottom endplate, then start stacking the plates Step4. place the bottom endplate, then start stacking the plates.(1cm,AL) Step3. 3 posts for positioning

Step5 Six 2.5-mm dia aluminum posts are inserted through pre-drilled holes of the bottom assembly stand and all plates. Continue stacking all plates. The six poles can be raised to align all plates.

Step6 All 194x lead, 194x scintillator, and 388x paper layers are stacked

Step7 Add the top end-plate which is identical to the bottom endplate. Step8 Add the pressure sensor

Step9 Now add two supporting ,and a top plate for compressing all layers.

Problem: The screw is not long enough,tomorrow we will exchange two long one