CO2 cooling requirements for the IBL

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Novel technologies and materials for thermal management
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
Cooling Systems Adopted For the Use in the Particle Detectors 1 V. Vacek AGENDA: What we can offer for the the AFP R&D Project: Two cooling systems (Aircooler.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
UT cooling discussion 3 december 2014
Thermal management for ATLAS upgrade Georg Viehhauser.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Issues about the full scale thermosiphon (TSP ) D. Giugni Thermosiphon Review III, May 28 th 2010 D. GiugniThermosiphon Review III, May
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
A two-stage system for the future cooling system.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Straw man layout for ATLAS ID for SLHC
STT gas system a possible implementation
ATLAS Internal ID Service Integration
For the CMS Pixel detector
HL-LHC IT STRING and Series test of SC link
TDAQ Phase-II kick-off CERN background information
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Micro-channel Cooling
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
5K or not? & TTF module thermal modeling update
Tracker cooling loop “check out” draft for discussion
Antti Onnela CERN – EP – Detector Technologies group
M. Battistin CERN EN/CV/DC 9th July 2009
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
Introduction When searching for a new mattress, you have to make sure you know where to go to find the best one. The mattress you sleep on is going to.
Update on ATLAS insertable B-layer
CF testing pipe & testing plan
Status and Prospects of Tracker Services Hans Postema (CERN)
For the CMS Pixel detector
Presentation transcript:

CO2 cooling requirements for the IBL D. Giugni. NIKHEF, July 10th 2009 D. Giugni NIKHEF July 09

Outline The ATLAS approach to CO2. IBL Lay-out and implication to the cooling. Roadmap toward a qualification of the CO2 cooling. Requirements for the pilot CO2 plant. D. Giugni NIKHEF July 09

ATLAS vs. CO2 ATLAS has been considering, and still consider CO2, in any of the plant flavors, as a valuable and strong option for the IBL (insertable B-layer) cooling. Nevertheless the detector expertise and the know-how belongs to evaporative system based on fluorocarbon. This cannot be ignored but it is not a matter of a “good feeling” vs. a system that is well known by the people involved. Current systems is really complex. It has 204 cooling loops, ~60KW cooling power and it is much wider then what we are talking now for IBL. I can bring up several examples where the evaporative fluorocarbon system has reserved unfair surprises despite of the excellent performances foreseen. Most of them comes from the limited testing especially on the on-detector side. Problems are daughters of our (and I put myself at the top of the list) wishful thinking. I really do not want to go through the same mistake twice: Performances, reliability, soundness must be extended tested on real hardware. D. Giugni NIKHEF July 09

ATLAS vs. CO2 [2] It is true that the so called “champagne” CO2 (NIKHEF style) does not start from scratch. A beautiful and reliable plant has been successfully delivered and commissioned for VELO. Nevertheless, given our past experience, we want to approach the CO2 system in a practical and heuristic way. Certainly benefitting from the experience from other labs, trying to finding out a way of collaborating successfully. Looking at the cooling beyond Phase I, CERN is willing to build up the expertise and the know-how on CO2 . On top of the basic thermodynamic measurement on the boiling channel (that takes off ideally) today at NIKHEF, we are planning to build a pilot CO2 plant at CERN. The timescale is to provide recommendations at the TDR (Feb 2010) and support the cooling choice late 2010. The question, now, is how to came to such a plant ready in due time First step is to sort out the requirements: D. Giugni NIKHEF July 09

IBL Lay-out Number of staves is still unclear . They can be 13 or 14. The recent estimate on the thermal transient during the bak-out leads to be optimistic about the module temperature. If it is confirmed by the tests, this solution becomes very appealing. The two layout flavors shown here refer to a single and double pipe reversed turbine. Double pipe stave allows to have a full redundant cooling system. CO2 foresees a “single” cooling line fan-out in multiple channels. The lost of the plant would leave the IBL completely without cooling. A full redundant cooling system is not unrealistic for CO2! Single pipe reversed turbine Double pipe reversed turbine D. Giugni

On detector piping lay-out Piping routing on the IDEP (Inner Detector End Plate) has been preliminary evaluated. The cold line seems to fit. There are several other aspects to address: Where is the manifold located? Inside the pixel volume or at PP1? The integration process conflicts with the aim of minimizing the brakes (fittings). Is a 7m long piping doable? How do we handle the CTE mismatch? Place should be compatible for having fittings only on the main line D. Giugni NIKHEF July 09

IBL CO2 cooling roadmap Measurement of the HTC and CHF at NIKHEF Based on the testing pipes (see next talk). Site: Nikhef Date: NowOctober Measurement of the stave thermal figure of merit. Based on “functional” CO2 plant to test staves and local supports Structure: DCP/Cryloab Site: CERN Date: October  Feb System test CO2 plant indicatively in SR1 Based on finalized CO2 plant for the system test Structure: DCP Date: 2010 Feb July

CO2 pilot plant requirements   IBL does not need a reduced pressure in any section of the piping. For all the plant the MDP (Max Design Pressure) is 100bar. Power must be enough to operate the entire detector in view of the final qualification on surface. Design Power is 1.5KW. Nominal evaporation temperature is -40C but we foresees operating at room temperature +20C. Need 4 different circuits tat can be operated singularly. Each of them will be manifolded accordingly to the needs. All the four branches have the same evaporation temperature. The location of the plant is, indicatively, the SR1 building next to point1. D. Giugni NIKHEF July 09