How to Survive OSHA’s Steel Erection Standard

Slides:



Advertisements
Similar presentations
Working Around/Under Loads
Advertisements

1926 Subpart R Part I History of SENRAC
Steel Erection - OSHA’s First Negotiated Rule
1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
Steel Erection §1926 Subpart R Rev 1: 11/15/2012
OSHA’S NEW STEEL ERECTION STANDARD
Subpart R: Standard Overview
MU Aerial Lift Building Training
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Sub-Part M Fall Protection.
Loading and Transporting Logs Section K of the logging code.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
OSHA Subpart Q Concrete and Masonry Construction.
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
Cranes, Hoists and Truck Hoists
Office of Training & Education1 § SUBPART L SCAFFOLDS.
CFR SUBPART L SCAFFOLDS
Penn State University Environmental Health and Safety Hazard Assessment and Personal Protective Equipment Training.
Walking-Working Surfaces and Fall Protection MODULE 9.
Controlling Hazardous Energy
Fall Protection in the Roofing Industry
Safety for Working in High Places
Rev: Section 6 Alternative Fall Protection.
History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
Steel Erection These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes.
The Occupational Safety and Health Act of 1970 Public Law The Occupational Safety & Health Act of 1970 "... to assure so far as possible every working.
Process Safety Management
10 CFR 851 Worker Safety and Health Program Overview.
Crane Questions Jim Shelton, HNAO CAS These are not necessarily official OSHA opinions but guidance until official interpretations may or may not be.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
10 CFR 851 Worker Safety and Health Program Bill McArthur, PhD, CIH Director, Office of Worker Safety and Health Policy Office of Health and Safety.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
§1926 Subpart M Presented by: ETTA, OSH Division, Fall Protection in Construction.
This presentation was created by the N.C. Department of Labor for safety and health training. §1926 Subpart M Presented by: ETTA, OSH Division,
Electronic Report of Injuries & Illness
N.C. Department of Labor OSH Division
Most Frequently Cited Serious Violations
OSHA’s NEW Walking-Working Surfaces 1910
Most Frequently Cited Serious Violations
Working Around/Under Loads
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Steel Erection 29 CFR 1926, Subpart R
OSHA’s NEW Walking-Working Surfaces
Outreach Training Program Construction Industry Procedures
§ SUBPART L SCAFFOLDS 1.
Subpart M Fall Protection.
Fire Door Inspections Qualified Training
Most Frequently Cited Serious Violations
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Top Ten Violations in Construction FY 2018
Construction Safety Council Breaking New Ground February 7, 2001
§ SUBPART L SCAFFOLDS 1.
SCOTTISH BORDERS SAFETY FORUM
Control of Hazardous Energy
Most Frequently Cited Serious Violations
INTRODUCTION TO THE NEW SUBPART R
Steel Erection 29 CFR 1926, Subpart R
10-hr. General Industry – Fall Protection
Presentation transcript:

How to Survive OSHA’s Steel Erection Standard James H. Brown Director of Safety & Health AGC of Indiana

What Does the Standard Address? 29CFR 1926.750(b)(1) Design Multi-Employer Hoisting Fall Protection Training Rigging Site Issues Placing 11/8/2018

What Is Steel Erection? 29CFR 1926.750(b)(1) Connecting Welding Bolting Steel Joist Ornamental Iron Decking Curtain Walls 11/8/2018

History SENRAC was established in 1992 to develop a new steel erection standard. Committee made up of industry, suppliers, unions and OSHA. Controversial language concerning multi-employer. Final rule published in January 2001. 11/8/2018

Important Dates January 18, 2002 Reset to allow more time to get acquainted. Gives more time for steel to be properly designed and fabricated. Grand-fathered Component Requirements Building permits before January 18, 2001. Steel erection begun before September 18, 2001. 11/8/2018

Scope Covers the construction, alteration or repair of steel structures including: Single & multi-story buildings Bridges Other steel structures Includes installation of metal decking and planking. Does not cover communications towers and tanks. 11/8/2018

Controlling Contractor The Controlling Contractor A prime contractor, general contractor, construction manager or any other legal entity which has the overall responsibility for the construction of a the project -- its planning, quality and completion. 11/8/2018

Controlling Contractor - Duties The following duties were specifically addressed by SENRAC. 1926.750 - Scope Paragraph (c) provides that the duties of controlling contractors under this rule include, but are not limited to, the duties specified. 1926.752(a) (approval to begin steel erection), 1926.752(c) (site layout) 1926.755(b)(2) (notification of repair, replacement or modification of anchor bolts) 1926.759(b) (protection from falling objects) and 1926.760(a)(2)(i) (perimeter safety cables) 11/8/2018

Multi-Employer Issues This is not an exclusive list of responsibilities. OSHA Multi-Employer Policy. CPL 2-00.124. December 10, 1999. Was not addressed by SENRAC. OSHA stipulates by addressing specific duties of Controlling Employer. It is not their intent to eliminate the Multi-Employer Policy. OSHA Preamble references numerous provisions of reasonable duty of care as per the Multi-Employer Policy. 11/8/2018

Multi-Employer Issues What are the implications? OSHA has given a false legality to the Policy by making reference to it in the Preamble to a Final Rule. 11/8/2018

1926.752 - Site layout, site-specific erection plan and construction sequence. (a) Approval to begin steel erection. Before authorizing the commencement of steel erection, the controlling contractor shall ensure that the steel erector is provided with the following notifications: 11/8/2018

Notifications The concrete in the footings, piers and walls and the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples either 75% of the intended minimum compressive design strength or sufficient strength to support the load imposed during steel erection. This section of the final rule sets forth OSHA’s requirements for proper communication between the controlling contractor and the steel erector prior to the beginning of the steel erection operation and proper pre-planning by the steel erector to minimize overhead exposure during hoisting operations. 11/8/2018

Question Before any steel erection begins, who is responsible for performing the test to determine whether the concrete has cured to 75% of the intended minimum compressive design strength or cured enough so that it can support the loads imposed during steel erection? 11/8/2018

Testing The standard does not require any specific entity to perform the test. The controlling contractor must select an entity that has the expertise to perform the test. 11/8/2018

Question Can the controlling contractor contract with subcontractors to perform the work required by 1926.752(a)? If so , is the controlling contractor still responsible for these duties after subcontracting them out? 11/8/2018

Testing/Notification Under 1926.752(a)(1), the controlling contractor “shall ensure that the steel erector is provided” with written notification that the concrete has cured to the specified degree. While the controlling contractor may contract with subcontractors to do the requisite tests and provide the written notification, the controlling contractor remains responsible for ensuring that the subcontractor does the work. If the subcontractor fails to do the test and provide the notification, the controlling contractor may be cited for a violation under 1926.752(a)(1). 11/8/2018

Anchor Bolt Modifications 1926.752(a)(2) - Any repairs, replacements and modifications to the anchor bolts were conducted in accordance with 1926.755(b). 11/8/2018

Anchor Bolt Modifications 1926.755(b) - Repair, replacement or field modification of anchor rods (anchor bolts). (1) Anchor rods(anchor bolts) shall not be repaired, replaced or field-modified without the approval of the project structural engineer of record. 11/8/2018

Anchor Bolt Modifications (2) Prior to the erection of a column, the controlling contractor shall provide written notification to the steel erector if there has been any repair, replacement or modification of the anchor rods (anchor bolts) of that column. 11/8/2018

Question Does the anchor bolt repair, replacement or field-modification approval from the Structural Engineer of Record (SER) required by 1926.755(b)(1) have to maintained on site? 11/8/2018

Anchor Bolt Modifications No, where an anchor bolt repair, replacement or field-modification is made, 1926.752(a)(2) requires that the controlling contractor ensure that the steel erector is provided with written notification that the requirements in 1926.755(b) were met. Section 1926.755(b)(1) requires that, prior to erection, the repair, replacement or field-modification must be approved by the Structural Engineer of Record. Once the written notification is given to the erector under 1926.752(a)(2), there is no requirement that it be maintained at the site. Also, there is no requirement that a record of the Structural Engineer of Record’s approval be maintained at the site. 11/8/2018

Question To make a field repair to an anchor rod (anchor bolt), must there be a written order from the project’s engineer of record? 11/8/2018

Approval Section 1926.755(b)(1) prohibits such repairs “without the approval of the project structural engineer of record.” While the standard requires approval, it does not require the approval to be in writing. 11/8/2018

Question The requirements in 1926.755(b) apply to the “repair, replacement or field modification of anchor rods (anchor bolts).” Is hitting an anchor bolt with a hammer to line it up with the base plate holes considered a modification? Generally, hitting an anchor bolt with a hammer to line it up with the base plate holes would not be considered a modification, since those minor adjustments do not normally affect the structural integrity of the rod or the concrete. However, unbending a bolt is considered a modification since that will weaken it. 11/8/2018

1926.752 (c) - Site Layout The controlling contractor shall ensure that the following is provided and maintained: (1) Adequate access roads into and through the site for the safe delivery and movement of derricks, cranes, trucks, other necessary equipment, and the material to be erected and means and methods for pedestrian and vehicular control. 11/8/2018

Site Layout (2) A firm, properly graded, drained area, readily accessible to the work with adequate space for the safe storage of materials and the safe operation of the erector’s equipment. 11/8/2018

Questions What are well maintained access roads, lay down and work areas? Who decides what is well maintained? Can this cause complaints to OSHA over a muddy area? 11/8/2018

Preamble Note OSHA has concluded that no definition could be created that would encompass all possible site conditions. For this reason, OSHA has left the word adequate in the final rule, and it will be the responsibility of the controlling contractor to determine that a road is properly graded to support equipment without the danger of rollover and properly drained so that equipment can be safely maneuvered. 11/8/2018

Overhead Hoisting 1926.752(d) Pre-planning of overhead hoisting operations. All hoisting operations in steel erection shall be pre-planned to ensure that the requirements of 1926.753(d) are met. 11/8/2018

Working Under Loads 1926.753(d) Working under loads. (1) Routes for suspended loads shall be pre-planned to ensure that no employee is required to work directly below a suspended load except; (i) Employees engaged in the initial connection of the steel; or (ii) Employees necessary for the hooking or unhooking of the load. 11/8/2018

Working Under Loads (2) When working under suspended loads, the following criteria shall be met: (i) Materials being hoisted shall be rigged to prevent unintentional displacement; (ii) Hooks with self-closing safety latches or their equivalent shall be used to prevent components from slipping out of the hook; and (iii) All loads shall be rigged by a qualified rigger. 11/8/2018

Overhead Hoisting Paragraph (d) Pre-planning of Overhead Hoisting Operations - “pre-planning of overhead hoisting operations” to reflect that 1926.753(d) addresses requirements for the pre-planning of lifts and not the requirements for the actual hoisting and rigging of materials. Commenters stated that there are times when materials being lifted would be required to have a swing area that would cover areas where workers are present. 11/8/2018

Preamble Notes In their view, this requirement would cause the controlling contractor to clear the whole site. This is not what the Committee intended nor is it what the provision requires. In addition, a similar requirement already exists in OSHA’s crane and derrick standard. 1926.500(a)(19) requires that “all employees shall be kept clear of loads about to be lifted and of suspended loads.” The intent of final rule 1926-752(d) is to require employers to pre-plan lifts to facilitate compliance with the overhead load requirements. 11/8/2018

Erection Plans 1926.752(e) Guidelines for establishing a site-specific erection plan contained in Appendix A to this subpart are required when: 11/8/2018

Erection Plans 1926.753(c)(5) - Safety latches on hooks shall not be deactivated or made inoperable except: (i) When a qualified rigger has determined that the hoisting and placing of purlins and single joists can be performed more safely by doing so; or (ii) When equivalent protection is provided in a site-specific erection plan. 11/8/2018

Erection Plans 1926.757(a)(4) - Where steel joists at or near columns span more than 60 feet (18.3m), the joists shall be set in tandem with all bridging installed unless an alternative method of erection, which provides equivalent stability to the steel joist, is designed by a qualified person and is included in the site-specific erection plan. 11/8/2018

Erection Plans 1926.757(e)(4) - No bundle of decking may be placed on steel joists until all bridging has been installed and anchored and all joist bearing ends attached, unless all of the following conditions are met: (i) The employer has first determined from a qualified person and documented in a site-specific erection plan that the structure is capable of supporting the decking load . 11/8/2018

1926.759 - Falling Object Protection (a) Securing loose items aloft. All materials, equipment, and tools, which are not in use while aloft, shall be secured against accidental displacement. (b) Protection from falling objects other than materials being hoisted. The controlling contractor shall bar other construction processes below steel erection unless overhead protection for the employees below is provided. 11/8/2018

Preamble Note One way controlling contractors can reduce the hazards associated with falling objects is by scheduling work in such a way that employees are not exposed. 11/8/2018

Falling Object Protection The controlling contractor shall ensure that no other construction processes take place below steel erection unless adequate overhead protection for the employees below is provided. 11/8/2018

Preamble Note The use of the word “ensure” in this standard does not make the controlling contractor liable if it institutes reasonable measures to comply with the requirement. 11/8/2018

1926.760(e) - Custody of Fall Protection Fall protection provided by the steel erector shall remain in the area where steel erection activity has been completed, to be used by other trades, only if the controlling contractor or its authorized representative: 11/8/2018

Custody of Fall Protection (1) Has directed the steel erector to leave the fall protection in place; and (2) Has inspected and accepted control and responsibility of the fall protection prior to authorizing persons other than steel erectors to work in the area. 11/8/2018

Definition - Perimeter The perimeter columns define the final perimeter where the edges will not be expanded. 11/8/2018

Preamble Note The perimeter cable provision in the proposal did not specify either the steel erector or the controlling contractor as responsible for installing the perimeter cables. 11/8/2018

Preamble Note Since the perimeter cable provision does not specify any particular entity as responsible for installing the cables, all employers engaged in steel erection with respect to the project are responsible for compliance with this provision, including the controlling contractor. 11/8/2018