Assessment of the GTAC: Nova’s perspective

Slides:



Advertisements
Similar presentations
Integration of Physical and Financial risk in Australia’s National Electricity Market Les Hosking Managing Director and CEO NEMMCO.
Advertisements

The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Viticulture– Electricity procurement Site / company name and logo here This is an AgriFood Skills Australia Ltd project developed in partnership with Energetics.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Transmission Pricing Methodology Presentation to the Electricity Commission Conference 26 April 2007.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Work Plan and Key Deliverables 2 November WORK PLAN.
Copyright © 2017, 2014, 2011 Pearson Education, Inc. All Rights Reserved Personal Finance SIXTH EDITION Chapter 21 Estate Planning.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Information ITIL Technology Infrastructure Library ITIL.
Accounting (Basics) - Lecture 5 Lease
Presentation at REEEP Regulatory Forum, 28 September 2004
2006 General Meeting Assemblée générale 2006 Chicago, Illinois
Details of demand management options
Gas Transmission Access: Priority Rights
Auditing & Investigations II
Transmission Workstream 7th Dec 2006 Chris Logue
Transmission Pricing Options
Gas Transmission Access: Revised Draft GTAC Release
Gas Transmission Access: Curtailment
New transparency guidelines
Alternative Approach for Loads in SCED v.2
CRE Public Consultation on new exempt interconnectors
1 The roles of actuaries & general operating environment
Gas Transmission Access: Revised Draft GTAC Release
Review Group 291- Ofgem Update
2009 TSO Transparency Gas Regional Initiative North-West
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
BUDGET Unit VI.
Overview What we are trying to achieve in regulatory area
Unit 5: The Financial Sector
GTAC assessment 12 December 2017 Ian Wilson.
Gas Transmission Access: Second Revised Draft GTAC Release
Some worked examples of gtac assessments, using the 3 November 2017 gtac Ian Wilson.
GTAC Workshop – 17th November
Gas Transmission Access Code: Final GTAC Submission to GIC
Submissions on GTAC preliminary assessment presentation to stakeholder workshop 27 March 2018 Gas Industry Co.
GTAC Workshop Block 5 19 September 2018.
NS4960 Spring Term 2018 Burnell and Simon Chapter 3 U. S
GTAC Workshop Block 1 11 July 2018.
Transmission Pricing & Regional Electric Markets
GTAC Consultation Version 11 September 2018 Stakeholder Consultation workshop 16 October 2018.
New Investment Agreements
GTAC Workshop Block 1 12 July 2018.
Incentives 26 September 2018.
Gas Transmission Access Code: Submission on GIC Preliminary Assessment
User Pays – Changed & New Services
Consideration of issues raised by UNC Modification Proposal 0244
Transmission Workgroup June 7th 2012
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Summary of Vector’s Views on Preliminary Assessment by GIC
GTAC Workshop Block 1 10 July 2018.
An action-based way forward
Review Group 291- Ofgem Update
Proposed Transitional Gas Exit Arrangements
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Consideration of issues raised by UNC Modification Proposal 0244
Gas Transmission Access Code: Next Steps following GIC Preliminary Assessment 27 March 2018.
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation to the Parliamentary Portfolio Committee: Regulatory measures to address MTR 27 October 2009.
195AV “Future work” – system flexibility
Project Nexus Workgroup
Unit 3 Review Questions.
Chapter 8 Overview of Working Capital Management
GTAC – submission on GIC Assessment
Learning & Development Regulatory Update Round
Presentation transcript:

Assessment of the GTAC: Nova’s perspective 27 March 2018

Overview Nova largely in agreement with GIC on major impediments to adopting the GTAC First Gas acknowledged those points in its submission and has offered solutions Presentation focuses on points of difference GTAC is a package No benefit in trying to upgrade VTC or MPOC as an alternative

Nova’s position on key topics Agree with GIC analysis Disagree Agree with First Gas revised position Outstanding issues

Nova’s position on key topics Agree with GIC analysis Disagree Agree with First Gas revised position Overrun / Underrun charges Liabilities Regime Interconnection Agreements Park & Loan (approved ERM) Supplementary Agreements Deemed non-RPO provisions Workload on nominations Outstanding issues

Nova’s position on key topics Agree with GIC analysis Disagree Agree with First Gas revised position Overrun / Underrun charges Liabilities Regime Interconnection Agreements Park & Loan (approved ERM) Supplementary Agreements Deemed non-RPO provisions Workload on nominations Investment costs in forecasting DNC Priority rights ERM charges Outstanding issues Hourly overrun charges Rebates Taranaki Target Pressure

Forecasting DNC – resources required GIC position May cost millions Need for investment driven by excessive penalties Potential to centrally determine non-TOU demand forecasts Nova’s position Cost of penalties to be corrected ( F-1 => F-2 ) Reduces expected cost of penalties Net cost of Penalties, after Rebates, not excessive Resourcing invested in forecasting DNC unlikely to be excessive No central forecasting needs to be considered at this stage But could be added later Better forecasting of DNC should lead to better line-pack management, Benefits in terms of TTP & provision of Park & Loan

Rebates are a useful part of the mix GIC Neutral Marginal cost of penalties with different market shares: mathematically correct, but significance overstated Without Rebates: Beneficiaries of lower DNC charges in future years likely to differ from today’s payers. Focus on gross cost of penalties => more money gets spent on forecasting DNC than the alternative Full cost of penalties to be passed through, either in transmission charges or gas price Difficult & expensive for Shippers to allocate penalty costs to different market groups => inefficient pricing Lacks transparency With Rebates Shippers only need to recover net costs of penalties Major Gas Users may opt to provide nominations, pay penalties, and receive rebates => incentive to improve accuracy of their nominations Transmission charges likely to include only a small component to cover net penalty costs Would facilitate downward pressure on prices

Priority Rights a positive Major gas users Need to assess marginal value of gas versus of security of supply Reduce probability of Critical Contingency Event through demand response Complex for Shippers with a wide mix of customers, each with a different marginal value of gas SAs & IAs Could be made subject to GIC approval to protect 3rd party interests Mass Market (Non-TOU) Shippers Protected within Critical Contingency Regulations Is this an incentive to not hold PRs? Nothing to prevent Shippers from securing adequate PRs, either Bid above expected clearing price, or Change rules to receive automatic allocation at clearing price No validity in mass market Shippers being disadvantaged

ERM Charges An improvement on MPOC MBB cash-outs Initial settings should not be an issue in assessing GTAC Tolerances need resolution

Hourly overrun charges Concern over impact on marginal costs of electricity generation Manageable with more nominations cycles: 4-hourly 2 a.m., 6 a.m., 10 a.m., 2 p.m., 6 p.m., 10 p.m. Do not need to be updated by users every cycle Less likely to require emergency cycles

Taranaki Target Pressure Amending clause defining First Gas TTP obligations unlikely to make a difference Financial incentive would need to be part of Commerce Commission regulation GTAC better than MPOC & VTC because: Better alignment of nominations and demand 4-hourly nominations cycles would also improve control over TTP