Supply presentation FACELIFT. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
Profile Incorporated in 2005, under the banner of Matta Inc. Cherry Associates also known as "Cherry Developers Group" & Cherry Designers has erected.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
G RAMPAS R ESTAURANT Conley Design Studio 1 Assessment & Improvements for Grampas Restaurant & Bakery Merchant Assistance Application Grant.
Brad Willard Professional Painting Quality Service for Over 16 Years!
Supply presentation Cleaning services. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Source One Source One Network and Building Solutions.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Who Are We? Construction and Engineering Company Design and Architectural Studio Service Center.
SETUP Chapter 6 Lead Abatement for Workers Course.
QUICK Design, Inc. Making sure your move Fits House 2 Home.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Tel : Fax: P.O.Box : Dubai, UAE.
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
Supply presentation Legal Services. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
conley design studio 4/21/2017 Dania Rexall Pharmacy
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
 Real Estate Clerk – performs clerical duties at a real estate office  Real Estate Broker - attempts to find sellers who wish to sell and buyers who.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
ITU Telecom World Exhibitors’ Meeting 21 st March 2006.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Standard shell scheme booth Furniture & accessories service Electrical services Audio / visual equipment service The Approved Stand Contractor for special.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Interior Painting How to paint like a pro.. Step 1: Preparation Remove as many items from room as possible Cover any remaining furniture & floors Remove.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Interior Design. Designing a Space Effective interior design requires careful planning, and you are more likely to be pleased with the results. When planning.
Tiny Houses: Living Large in a Small Space Project
Chapter 20 Developing a Design Plan. Objectives 1. Identify the steps in developing a design plan. 2. Explain how to assess client characteristics. 3.
ACSR Report The 33rd ARCASIA October 29 ~ November 2, 2012 Bali, Indonesia Korea Institute of Registered Architects (KIRA)
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
Find Online Home Inspection Services in Palm Beach & Florida, Miami at Best Price
Find Top10 Real Estate & Home Inspections Company in Miami Dade
Roof Cleaning Sydney Roof Pointing Sydney Roof Painting Sydney Roof Replacement Sydney.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
Facility Environment 1.
Tiny Houses: Living Large in a Small Space Project.
Krishna Riviera Heights 1205 Raj Nagar Extension Ghaziabad
TOBY ZACK DESIGNS LA MER
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
Combined Hot-Smoking & Cooking Installation
DESIGN COMPETITION 2017 Renovation UNDER $50,000.
DESIGN COMPETITION 2017 Renovation OVER $500,000.
How Completed Interiors Are Achieved: Designing & Building
Assembly And Installation Of Ikea Kitchen Cabinets
The Quality of Interior Design at PMU
DESIGN COMPETITION 2017 Renovation $50,000-$150,000.
DESIGN COMPETITION 2017 Renovation $150,000-$500,000.
HOUSING & INTERIOR DESIGN
CSUEB Facilities Department Custodial Cleaning Frequency Expectations
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
ISA Prime Developments
Ayazmobg Furniture Systems.
DESIGN COMPETITION 2017 New construction.
DESIGN COMPETITION 2017 SPECIALTY.
INTRODUCTION WORK BREAKDOWN STRUCTURE
Presentation transcript:

Supply presentation FACELIFT

Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center

Facelift Design and Coordination; Preparatory Works; Plasterboards´ Works; Flooring and Carpeting; Electrical Wiring; Shop Windows and Shop Fronts; Sanitary; Air Conditioning; Paintings and Wallpapers; Interior Layout (furniture, advertisements..);

Design and Coordination Design Documents Submission to Client and to Shopping Center Managements – Arrangements of Entries and Permissions; Revisions for Shopping Centres – Wiring, Ventilation, Sanitary in compliance with the Requirements of the Malls and the Clients;

Preparatory Works Temporary Plasterboard Divider in front of the Shop Window during Works in the Premises including the Doors and Wallpapers with Advertisements; Load of Waste; Waste Disposal; Demolition of Plasterboard Divider;

Plasterboards´ Works OBS Bracing of Walls and Mounting of Furniture; Plasterboards on Client´s Request; Repairs of Plasterboard Walls and Ceilings; Demolition and Installation of New Plasterboard Walls and Ceilings; New Dividing Walls; Mineral Ceilings;

Floors and Wall Tiles Removal of Original Floorings (carpets, tyles,etc.); Delivery and Installation of New Floorings; Removal of Original Tilings; Delivery and Installation of New Tiles; Machine Floors´ Cleaning by Cleanfix Products; Floors´ treatment by Nanotechnology;

Wiring Dismantling and Assembly of Lights; Exchange of Power Supplies; Cleaning of Lights; Adaptation of Wiring acccording to New Layout of the Premises;

Shopfront Cleaning Shop Windows, Treshold, Logo before Opening; Standard Service of Roller Shutter including Lubrications;

Air-conditioning Repairs; Cleanings Service; Inspections; Sanitary Repairs; Cleanings; Service;

Paintings and Wallpapers Cover of Furniture and Floors before Painting; Plasterboard, Acrylic, repairs of walls and ceilings; Penetrations; Paintings – white or colours (up to client´s requirements); Doors Paint Identical to Walls´ Shade; Replacement of Old Wallpapers by New;

Facelift s.Oliver Banská Bystrica Old shop

Facelift s.Oliver Banská Bystrica Empty shop Temporary Plasterboard Divider in front of the Shop Window during Works in the Premises including the Doors and Wallpapers with Advertisements

Facelift s.Oliver Banská Bystrica During facelift Machine Floors´ Cleaning by Cleanfix Products

New s.Oliver

Prices on Request Prices on Request based on Neccessary Specifications Scope of Works; Size of the Premises; Options of Work (night/day works); Speed of Facelift; etc.;

Thank you for your attention and for more information please visit our website or send a mail to our Office