Jim Stewart Internal Review July 2009. Tagger magnet design 1.5 T nominal field 1.1 m wide 1.4 m high 6.3 m long Slabbed construction Heaviest piece <

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Break Time Remaining 10:00.
The basics for simulations
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
Turing Machines.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
Before Between After.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Physics for Scientists & Engineers, 3rd Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Jim Stewart JLAB Internal Review May Tagger magnet design 1.5 T nominal field 1.1 m wide 1.4 m high 6.3 m long Slabbed construction Heaviest piece.
Jim Stewart Tagger Magnet Design Review July 2009.
Presentation transcript:

Jim Stewart Internal Review July 2009

Tagger magnet design 1.5 T nominal field 1.1 m wide 1.4 m high 6.3 m long Slabbed construction Heaviest piece < 25 t 2 12 GeV e - bent 13.4 ° Electron measurement 30 mm pole gap 9 – 0.3 GeV electrons 11.7 to 3 GeV photons ~0.04% E/E0 intrinsic resolution!

Design Status Summary Initial 3-D models exist but they are not final. Changes still being made. No real assembly or detail drawings exist. Original FEA analysis has been done at Glasgow. Substantial FEA analysis is being done JLAB. Need jacks to separate iron plates 3

Procurement possible Strategies Issue a design and build contract Here the company will be given our reference design and then finish the design or start from scratch. Finish the design and then issue a set of build contracts. Here we have to generate all documentation and shop drawings ourselves. Design could be done by an additional contract. 4

JLAB will define the specification and the statement of work for the magnet and the vacuum chamber. Will include a drawing set and the specification which represents the reference design. Companies bid on the magnet with a proposal how it will be built. They can change the design as long as meets our requirements. They are required to provide all analysis. When the final design is finished it will be reviewed. Material procurement and manufacturing starts. 5 Design and build contract

JLAB will design all the components of the magnet system. Magnet Yoke Magnet Coils Stands Vacuum chamber We produce all final drawings with tolerances. We provide the exact specifications for all materials, handling, and quality control. We produce all safety related analysis and documentation. 6 Build contract

Pros and Cons Design and BuildBuild Design EffortWe dont have to finish the design. Must review their design. Must finish our design. Procurement Effort 1 contracting companyPossibly 4 separate contracts. CostMust pay for all design work and testing at the company (+profit). Must integrate their documents into JLAB Must pay to finish the design. Must produce full documentation set. RiskCan benefit from outside experience. Company accepts responsibility for mistakes. Additional optimization may save cost. If we make a mistake we will need to fix it. (How to evaluate risk?) Q&AWill test/map the magnet at the company. We must assure Q&A. 7

Results from RFI issued 1 year ago concerning feasibility and cost Companies claiming to be able to build Babcock Noell GmbH Bruker Biospin Everson Tesla General Atomics Milhous Company Precision Custom Components Sigmaphi Cost Estimate for the magnet only 3 estimates $ k Note: The dollar-euro rate and steel prices have changed in the last year. 8

RFQ 2 years ago for magnet design Typical costs $250k-$370k Total cost range $100k to $700k 9

SigmaPhi Tim met with the a rep. from SigmaPhi in May 09 to discuss the magnet. If it is a design and build they would start from scratch as they will be responsible. Plan for 2 years between issuing the contract and delivery. Cost ~$1.2M for the magnet only. They can map if we request. No vacuum chamber or stand 10

Design and Build contract timeline Post RFQ Jan 2010 Receive Quotes March 2010 Place Order June 2010 Receive Design Jan 2011 Approve Design Feb 2110 Iron and Cu Available July 2011 Manufacturing Complete July 2012 Acceptance Test Aug 2012 Delivery JLAB Sept 2012 Test Magnet Study Hysteresis Excitation Curve Fine mesh Map Install Detectors ~6 mo Float 11

Build Only Schedule Post RFQs July 2010 Receive Quotes Oct Place Orders Jan 2011 Iron and Cu Available July 2011 Manufacturing Complete June 2012 Magnet Delivery July

Effort for Design and Build Now to RFQ5 mw EngineerFinish SOW and PR. 7 mw DesignerFinish drawing package for bid. Review Bids6 mw Engineer3 mw answer questions from companies. 3 1 wk committee reviews bids. Design phase support3 mw engineerReviews at 1.5 mo and 6 mo. Check design and documents. 2 mw designerSupport for design review. Build phase4 mw engineerSite visits. Testing review. Delivery4 mwDocumentation and Safety integration. Total : 22mw Eng. 9 mw Designer (~$85k) 13

Effort for a build only contract Now to RFQ14 mw EngineerFinish FEA. Documentation. Safety analysis. 32 mw DesignerFinalize design. Make all drawings. Get signed archived drawings. Review Bids6 mw EngineerReview 4 different contracts. Build phase4 mw engineerSite visits. Testing review. Delivery3 mwCertificates Documentation and Safety review. Total : 27 mw Eng. 32 mw Designer (~$148k) 14

Overview of what is in P3E for the tagger magnet excluding installation ActivityActivity StartFinishBud. Labor Bud.Labor Bud. Mat. Bud. Total ID Name Cost CostCost Cost Drawings for Yoke Steel01-Apr Sep w$41,676$0$41, Drawings for Coils 01-Apr-1020-Aug w$52,966$0$52, Drawings for Vac Chamb 01-Apr Sep w$52,966$0$52, Dsgn Stands for Mag 01-Apr Jun w$41,676$0$41, Dsgn Supprt for Vac Chamb 01-Apr Sep w$41,676$0$41, Write Pwr Supply Spec 23-Aug Sep w$6,938$0$6, EH&S Review of Dsgn 21-Sep Sep w$0$0$ Proc Yoke Steel 05-Jan Aug w$1,334$541,992$543, Proc Vac Chamb 05-Jan Mar w$2,000$70,948$72, Proc Pwr Supply 05-Jan Mar w$0$64,735$64, Tag Mag Acceptance Test 02-Jul Jul w$0$0$ Shipping to JLab 03-Jul Aug w$0$34,074$34,074 Power Supply Subtotal11.0w$6,938$64,735$71,673 Tagger Dipole Subtotal252w$234.3k$647k$

Budgeted cost for installation Activity IDActivity NameStartFinishBud. LaborBud. Material Bud. Total Install Tagger Magnets & Chamber28-Aug Oct-12 04:00 PM$26,035$27,685$53, Install Tagger Pwr Supply (Installtn)27-Jun Jul-12 04:00 PM$17,612$10,648$28, Install LCW Connections (Installtn)25-Jul Aug-12 04:00 PM$9,248$2,130$11, Survey & Align Magnets (Installtn)31-Oct Nov-12 04:00 PM$16,090$0$16, Field Map Tagging Magnet 14-Nov Feb-13 04:00 PM$22,581$0$22,581 Total$91.5k$40.5k$132k Remember this includes: Magnet Survey, Magnet Assembly, Power Supply Installation, Cables, Cable Trays, Water, Temperature Switches, Controls, Programming Controls, Testing the Magnet, Hysteresis Suppression Studies, Generation of the excitation table for CEBAF, Mapping the Magnet, A Mapping Machine if needed including software …. Summary: 2 technician man years of effort and $40k material 16

Must decide on the best plan! Main Factors to consider: Is expert manpower available in house? Expertise in the Hall-D group is lacking. How large is the risk in finishing the magnet design ourselves? If expert manpower can be found in house then the magnet should be built at budget. 17

Pros and Cons Design and Build Pros Do not need to finish the design. Can benefit from companys experience. Company will generate the necessary documentation. Company can test the magnet before delivery. Know we will receive a working magnet! Cons Must review the companys proposal. Must pay for all design work at the company. Straight Build Pros Do not have to review the companys final design. Cost of contracts may be less as the companies do not need to engineer. Cons Cannot benefit from companys experience. More work in procurement here due to multiple contracts. Q&A is more important as only partial testing can be done before delivery. First assembly and testing at JLAB. 19

Manpower cost Mech Eng $63.81 per hr 63.81*40*(52/44)= $3.0 k per mw Fully burdened non-escalated effort Mech Designer $43.84 per hour $43.84 *40*(52/44)=$2.1 k per mw Fully burdened non-escalated effort 20

Overview 11.1 m long Exit Window 1 reinforcing ribs. ¼ Stn.Stl. Shell Max 1 mm deflection 3/8 (9.5 mm) O-ring Brackets to support vacuum forces. Two NMR probes for field stabilization and monitoring. 21