The CART Software Developed by Ciber Terrasoft (Pty.) Ltd.

Slides:



Advertisements
Similar presentations
BASIC SKILLS AND TOOLS USING ACCESS
Advertisements

Tutorial 9 – Creating On-Screen Forms Using Advanced Table Techniques
Interaction Design: Visio
Calypso Construction Features
With TimeCard appointments are tagged with information that converts them into time sheets. This way you can report time and expenses from inside your.
Microsoft Office Illustrated Fundamentals Unit C: Getting Started with Unit C: Getting Started with Microsoft Office 2010 Microsoft Office 2010.
ASENT_IMPORT.PPT Importing Data From Templates Last revised 11/03/2009.
Lesson 12 Getting Started with Excel Essentials
IIT Kanpur Web Based Land Records Management System Prof. P.K.Kalra Developed by Department of Electrical Engineering Indian Institute.
Tutorial 8: Developing an Excel Application
Orchard Harvest™ LIS Review Results Training
EXCEL Spreadsheet Basics
Kanban Task Manager for Outlook ‒ Introduction
Benchmark Estimating – Company History benchmarkestimating.com Introduction to Version 7.6 for existing users Copyright Benchmark.
XP New Perspectives on Microsoft Access 2002 Tutorial 61 Microsoft Access 2002 Tutorial 6 – Creating Custom Reports.
With TimeCard appointments are tagged with information that converts them into time sheets. This way users can report time and expenses from their Outlook.
Using Surfcam to Produce a Numeric Control (NC) Program An Introduction to the CAD/CAM Process Instructions for 3 Axis Programming Using the D&M CNC Milling.
ASENT_MTTR.PPT Maintainability Predictions Last revised 8/11/2005.
Chapter 6: Pivot Tables Spreadsheet-Based Decision Support Systems Prof. Name Position (123) University Name.
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 2 1 Microsoft Office Access 2003 Tutorial 2 – Creating And Maintaining A.
Grove City High School Ms. Bruce. Week 1  This week Basic Commands Basic Saving Basic Printing.
EPOCH 1000 File Management Data Logging and Reporting
TrendReader Standard 2 This generation of TrendReader Standard software utilizes the more familiar Windows format (“tree”) views of functions and file.
Working with a Database
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
Chapter 10: Working with Large Data Spreadsheet-Based Decision Support Systems Prof. Name Position (123) University Name.
European Computer Driving Licence Syllabus version 5.0 Module 4 – Spreadsheets Chapter 22 – Functions Pass ECDL5 for Office 2007 Module 4 Spreadsheets.
ITEC224 Database Programming
1 6.0 Drawings for Electrical Systems It’s an easily used software programme for designing and estimating electrical systems for residential and.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
InteractiveMedia’s Imagine Software Platform When user clicks on the Imagine desktop icon or installed app. This is the first thing the user will see full.
Introduction With TimeCard users can tag SharePoint events with information that converts them into time sheets. This way they can report.
Working with Reports in Microsoft Excel Session Version 1.0 © 2011 Aptech Limited.
XP New Perspectives on Integrating Microsoft Office XP Tutorial 2 1 Integrating Microsoft Office XP Tutorial 2 – Integrating Word, Excel, and Access.
FireRMS NEMSIS (Part 2) Presented by Laura Small FireRMS Quality Assurance.
© 2011 Autodesk High-End Infrastructure Modeling with Low-Cost Tools: Introducing AutoCAD® Map 3D 2012 Bradford Heasley, GISP Vice President, Brockwell.
Microsoft ® Office Excel 2007 Working with Charts.
CREATING TEMPLATES CREATING CUSTOM CHARACTERS IMPORTING BATCH DATA SAVING DATA & TEMPLATES CREATING SERIES DATA PRINTING THE DATA.
Excel 2007 What You Should Have Learned about Excel had You Been Paying Attention.
Key Applications Module Lesson 21 — Access Essentials
Welcome to MM305 Unit 6 Seminar Larry Musolino
Database Systems Microsoft Access Practical #2 Making Forms and Reports Nos 215.
DBLink3 Reporting Software for Model 22 Personal Noise Dosemeter system.
Introduction to Enterprise Guide Jennifer Schmidt Rhonda Ellis Cassandra Hall.
1/62 Introduction to and Using MS Access Database Management and Analysis Yunho Song.
GISMO/GEBndPlan Overview Geographic Information System Mapping Object.
Engineering\CADD Systems Office CADD Manager's Series Customizing the Interface.
Chapter 5 Working with Multiple Worksheets and Workbooks
1 Parametric analysis Overview This course describes how to set up parametric and temperature analyses. Parametric and temperature are both simple multi-run.
Introduction to KE EMu
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
Intermacs Form Download Excel Tutorial Pivot Tables, Graphic Tools, Macros By: Devin Koehl.
Key Applications Module Lesson 14 — Working with Tables Computer Literacy BASICS.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Access Module Implementing a Database with Microsoft Access A Great Module on Your CD.
IE 411/511: Visual Programming for Industrial Applications Lecture Notes #2 Introduction to the Visual Basic Express 2010 Integrated Development Environment.
For Datatel and other applications Presented by Cheryl Sullivan.
Key Applications Module Lesson 12 — Word Essentials Computer Literacy BASICS.
Version 1.0 3/23/2007 © 2007 ANSYS, Inc. All rights reserved. Inventory # W4-1 BladeModeler 11.0 ANSYS, Inc. Proprietary ANSYS BladeModeler 11.0.
GO! with Microsoft Office 2016
Using Surfcam to Produce a Numeric Control (NC) Program
12 Product Configurator
Exploring Microsoft® Access® 2016 Series Editor Mary Anne Poatsy
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Key Applications Module Lesson 14 — Working with Tables
Presentation transcript:

The CART Software Developed by Ciber Terrasoft (Pty.) Ltd.

Overview Introduction to product Introduction to company Evaluation of product Walk through of a simple example Outputs/Retports/etc Data Capturing

What is CART? CART is a CAD-based integrated design tool to support the detailed design of MV and LV distribution networks. Using CART:- Design distribution networks, Analyse network performance, Produce final construction drawings, Generate Bill of Materials and Reports.

What is CART? (cont….) CART is a productivity tool to support the detailed design of LV distribution networks CART was developed at Wits University in close collaboration with Eskom over the past 12 years When using CART the designer focuses on engineering- the computer does all of the tedious and repetitive tasks

What is CART? (cont…) CART supports all aspects of the distribution design workflow CART is used by Eskom and by consulting engineers in South Africa and in other countries

What is Ciber Terrasoft? Ciber Terrasoft (Pty) Ltd (“Terrasoft”) was set up in 1998 to support CART Terrasoft has developed over 12 years of experience and expertise in the specialised field of software tools to support electrical distribution engineering

What is Ciber Terrasoft?(cont….) Terrasoft supports CART, offers training and specialised software customisation and development Terrasoft works in alliance with other software development companies Offers various services around the area of network data capturing

Evaluation of CART From 2000 to 2001 Eskom DT and Terrasoft undertook a detailed evaluation of the CART software CART was found to do the following: increase engineering productivity by three times, eliminate errors and improve the overall quality of designs.

Evaluation of CART 2002 winner of a prestigious  Award in South Africa for CART’s energy saving capability. (The  Award is sponsored by Eskom & endorsed by the Department of Minerals & Energy) In South Africa, CART could save:- consulting engineers R2 million/annum in improved productivity; Eskom R180 million/annum in reduced construction costs; 17GWh per annum in reduced network losses.

A Walk through example CART works within a 3rd party CAD program (front-end) called MicroStation developed by Bentley USA. Currently uses Microsoft Access™ database for storing network info. Uses Microsoft Excel™ for costing the project, BOM, etc.

Initial title screen This example uses screen captured images to portray concepts. The first step is create a brand new project using wizard

Select Drawing Select dgn drawing on which the new distribution network will be placed/designed.

Select conductors/cables Select only the required conductor types for this project. Additional conductor types can be added to the library

Select transformers Select only the required transformer types for this project. Additional transformer types can be added to the library

Select default materials Select material for various applications eg: Type of MV pole Type of LV pole Types of pole-top conductor supporting structures for various stringing angles

Select calculation parameters Calculations done only for LV portion of the network. One of the methodology used is Herman-Beta method developed by Prof. Ron Herman

Design Environment Now that the project has been configured, the user is presented with the design environment.

Identify consumer locations This is a zoomed in view of the bottom left of the township. The stand boundaries are indicated by the black lines while the road reserve is indicated by the brown. The consumer locations are identified (shown by the purple circles) and entered into a database so that the stand number, voltage, phasing info, etc can be tracked.

Select transformer type Zoom into an area and begin the procedure to define a transformer zone. First select the size and rating. Then select all the other devices such as fuses and the like that need to be installed along with the transformer.

Draw transformer zone The transformer zone is drawn as indicated by the blue line. The stands are automatically counted and presented in a window. Based on the estimated loading of the transformer the zone can be resized until the desired transformer loading is achieved.

Optimum transformer location Once transformer zone is finalised, CART will place the transformer at load centroid of this zone. The transformer needs to be moved to practical location.

Optimum transformer location Move the transformer to a practical location which can be used to service everyone in the zone

Add LV feeder Poles are placed whenever there is a change in direction. Poles can also be placed along the route at certain places if required. CART has a feature for determining optimum spans. The current span (distance from the most recently placed pole) is displayed in metres to guide the designer with pole placement. A construction line is used to indicate the route that the conductor is to follow. The total distance from the start of the construction line is also indicated. In this case that is the total distance from the transformer.

Add LV feeders Once the conductor route is specified using the construction line, poles are inserted wherever they are required along the route. This would be in addition to the poles specified by the designer. Conductor (feeder) segments are then added along the route as indicated by the red lines. Service feeders are automatically extended from the poles along the route to the nearest consumer.

Add LV feeders Once the transformer zone is completed the calculations can be done. The first thing to do is the Auto Phasing. This optimally assigns the loads to the available phases so that the transformer is evenly balanced. In a similar manner, the remaining feeders can be added, until all the consumers are connected up. Now the voltage calculations can be done. The values are calculated and displayed on the screen next to each consumer. Real feeder and service distances are used for the calculations.

Calculations The voltage texts are colour coded to indicate the tolerance. The text in green is within 5% of nominal, while the text in yellow (not legible) is within 10%. The voltages in red have exceeded the tolerance and corrective action is required. Voltage can certainly be improved by changing the tap setting on the transformer (straight forward). It can also be improved by upgrading the feeder section to a larger conductor as shown in the next slide.

Re-Calculation Please note that the voltage text colours and the percentage tolerances are completely configurable to suit your needs. Alternatively, the tap setting on the transformer can be increased by editing the transformer’s properties. One can also see the phase balancing, voltages at the secondary bushings, currents, losses, etc Though the voltages are not legible in the image, one can see that they are yellow in colour which is acceptable. In this manner one could go about adjusting the network until all the voltages are acceptable.

Pole labeling This is the pole number. The first 2/3 digits indicate the transformer number. The alphabet indicates the feeder name. The last two digits indicate the pole number along that feeder. In this case, this is the first pole along the E feeder. Once the the zone layout is completed to the designer’s satisfaction the pole labels can be determined. CART examines the various structures required, angles, etc, to determine all the materials required. All the poles are also automatically numbered. This is the 5-character pole code that indicates exactly all the materials that are required at this location. CART generates a corresponding table that would enable one to decipher this code. This is the phasing information in the order of Red White and Blue. This indicates that there are 4 customers on the blue phase.

Adding MV feeder The green colour line indicates the route that the MV feeder travels to the transformer in this township. MV source indicating the T-off point from which the MV feeder will run to the township CART allows the MV feeder to share poles with the LV feeder which can reduce infrastructure costs. If any of these poles are moved then both the MV and LV feeders will be modified together.

Adding the Drawing Key The drawing key allows one to decipher the 5-character code that has been placed on all the poles.

Costing the project Since the network is captured in a relational database as it is drawn, it is possible to cost the project by simply extracting the information from that database. This is a summary sheet for all the costs associated with the project. Note that the costs are always broken down per transformer zone. The detailed tabs of the spreadsheet will follow. This lists all the conductors and their lengths as used in the project. Note that the costs are always broken down per transformer zone. This lists all the service conductors and their lengths as used in the project. Again the costs are broken down per transformer zone. This lists all the material structures and their costs as used in the project. Again the costs are broken down per transformer zone.

Outputs: Construction Dwg The customised line style indicates the conductor diameter and the number of phases. Eg 35mm2 and 2 phase. The symbol library that CART uses and the line styles used to represent the various different conductor types can be configured as desired. Even customised line styles can be used as required by Eskom This is a 3 phase Fox conductor.

Outputs: ReticMaster™ CART can export the network to ReticMaster™ with the desired level of detail. This options exports a single zone but captures the load information at the junction or poles. CART can export the network to ReticMaster™ with the stand and service conductor information included.

Outputs: ReticMaster™ CART can export the an enitre network to ReticMaster™ including the MV. This option does not export the load information at the junction or poles. CART can export the entire network to ReticMaster™ with the stand and service conductor information included.

Outputs: Reports For each transformer zone, the following network details are listed:- Transformer loading, Losses, Loading on each phase, Voltage and Current at the secondary bushings All the customers are listed along with their details. The customer list is sorted in ascending order of the voltage

Outputs: Volt Plots The plot is for the shortest feeder on the network This is the plot for the longest feeder in the network. One can see that it reveals a great amount of detail. This is a summary plot for all the feeders from the transformer. Voltage is shown on the Y-axis. The X axis intersects at the 207V point as voltages below this are unacceptable. A single plot is generated for each main feeder from the transformer Each stand number at the end of the service feeder is displayed. This allows one to identify consumers who have low voltages. The X axis shows the distance from the transformer in meters. The line indicates the position of the pole along the plot and displays the pole number. The plot indicates the voltages for each phase using a different colour. The blue lines at the end indicate the voltage drops of the service feeders. This is just a summary plot.

Outputs: Line Diagram For each feeder, the following information is displayed:- the feeder length the max current and loading percentage on the conductor the conductor type Details of the zone are shown at the top of the diagram. For each nodes (poles), the following information is displayed:- pole number, minimum voltage, the fault level and the distance from the transformer the number of consumer allocated to the respective phases. The single line diagram is for the entire zone.

Outputs: Project Statistics Some further stats is provided on the overall design. These figures are used to assess the level of optimisation that has been undertaken by the designer. For a project with a large number of transformers, the following statistics information is displayed for each zone:- no. of connections, the loading, the length of new MV and LV feeders, the network losses.

Outputs: BOM The structures can be exploded to obtain the Bill of Materials which are listed by part numbers (in this case the SAP number as used by Eskom) During normal costing CART works at the structure level. Upon completion, the structures can be exploded to obtain the Bill of Materials

Network Data Capturing If only a CAD drawing is available then it can be converted to a CART project so that the network can simulated. Extensions and/or infills can then be planned accordingly. However, during costing only the extensions and/or infills will be considered.

Network Data Capturing Since a CAD drawing has no ‘intelligence’ associated with it CART has to identify various features and convert it to CART elements which can then be used to do a trace. Before capturing specify the levels on which the specific information should be sought. Specify the cell names that need to be sought when tracing the network.

Network Data Capturing CART has captured the network by recognising the symbols and the conductor types. The previous CAD information has been replaced with the CART conductor and symbol information. One can now add infills and/or extensions to the network. CAD drawing has been captured into CART.

Extensions/Infills The extended network is calculated and costed. For the purpose of this demonstration, assume that the new connections as shown in the circle above have been identified. It can be seen that only the extension (6 new customers) is costed. The other tabs of the cost spreadsheet are not shown.

Interface with SinCal Now seen without the cadastral map Consider an MV/LV layout as show here Connect with SinCal so that the network information can be transferred.

Interface with SinCal SinCal is brought into view with the MV network layout. The required simulations can be analysed as required before transferring the results back to CART.

Interface with SinCal Now that the MV nominal voltages have been set at the transformers, the LV calculations must be re done so that the correct voltages for the customers can be determined.

Thank you Ciber Terrasoft (Pty.) Ltd. Should you require more information about the product or services, please do not hesitate to get in touch with us. Ciber Terrasoft (Pty.) Ltd. Email: info@terrasoft.co.za url: www.terrasoft.co.za Tel: +27 (0)11 315 3837 Fax: +27 (0)11 315 8332 Block B7, GreenOaks Office Park, Cnr of Gregory Ave & Bekker Street, Vorna Valley – Midrand P O Box 5705, Halfway House, 1685, South Africa.